Professional Documents
Culture Documents
Design Criteria For Foam System
Design Criteria For Foam System
Design calculations are based on NFPA -11 (Standards for Low, Medium & High
Expansion Foam) and IAP (Insurance Association of Pakistan)
Protecting the tank requiring the largest foam solution flow and for 55 minutes
backup.
Detailed calculations will be provided after PO or for verification purpose.
NFPA 14 Standard for the Installation of Standpipe and Hose Systems