RENCANA ANGGARAN BIAYA

No. Uraian Pekerjaan Satuan Volume Harga Satuan

1 Beduk 2 buah Bh 2.00 Rp 4,750,000


2 Ketobong Bh 1.00 Rp 3,500,000
3 Gong Besar Bh 1.00 Rp 5,500,000
4 Gong Sedang Bh 1.00 Rp 4,000,000
5 Gong Kecil Bh 1.00 Rp 3,000,000
6 Sape'k Bh 1.00 Rp 4,000,000
7 Kenong Bh 2.00 Rp 5,000,000
8 Sensarot Besi Bh 2.00 Rp 3,000,000
9 Sensarot Kayu Bh 2.00 Rp 2,000,000
10 Tok-tok Bh 1.00 Rp 300,000
Total
A
Jumlah Biaya

Rp 9,500,000
Rp 3,500,000
Rp 5,500,000
Rp 4,000,000
Rp 3,000,000
Rp 4,000,000
Rp 10,000,000
Rp 6,000,000
Rp 4,000,000
Rp 300,000
Rp 49,800,000