Download as pdf
Download as pdf
You are on page 1of 1
Site Data Matters Affecting the Execution of the Works Unforeseeable Sub-Surface Access Route 49 4.10 4.1 412 Details of all procedures and compliance documents shall be submitted to the Employer's Representative for his information before each design and execution stage is commenced, When any document is issued to the Employer's Representative, it shall be accompanied by the signed quality statements for such document, in accordance with the details stated in the Contract. The Employer's Representative shall be entitled to audit any aspect of the system and require corrective action to be taken, ‘The Employer shall have made available to the Contractor, prior to the Base Date, all the data on hydrological and sub-surface conditions at the Site, and studies on environmental impact, which have been obtained by or on behalf of the Employer from investigations for the Works. The Contractor shall be responsible for interpreting all data, ‘The Contractor shall be deemed to have inspected and examined the Site, its surroundings, the above data and other available information, and to have satisfied himself (50 far as is practicable, taking account of cost and time) before submitting the Tender, as to: (a). the form and nature of the Site, including the sub-surface conditions, (b)_ the hydrological and climatic conditions, (©) the extent and nature of the work and Materials necessary for the execution and completion of the Works, and the remedying of any defects, and (@) the means of access to the Site and the accommodation he may require. ‘The Contractor shall be deemed to have obiained all necessary information as to risks, contingencies and all other circumstances which may influence or aflect the Tender ‘The Contractor shall be deemed to have satisfied himself as to the correctness, and sufficiency of the Contract Price. Unless otherwise stated in the Contra the Contract Price shall cover all his obligations under the Contract (including those under Provisional Sums, if any) and all things necessary for the proper design, execution and completion of the Works and the remedying of any defects, If sub-surface conditions are encountered by the Contractor which in his ‘opinion were not foreseeable by an experienced contractor, the Contractor shall give notice to the Employer's Representative so that the Employer's Representative can inspect such conditions. After receipt of such notice and after his inspection and investigation, the Employer's Representative shall, if such conditions were not (by the Base Date) foreseeable by an experienced contractor, proceed in avcordance with Sub-Clause 3.5 (o agree or determine (a) any extension of time to which the Contractor is entitled under Sub- Clause 8.3, and (b) the additional Cost due to such conditions, which shall be added to the Contract Price, and shall notify the Contractor accordingly. ‘The Contractor shall be deemed to have satisfied himself as to the suitability and availability of the access routes he chooses to use. The Contractor shal (as between the parties) be responsible for the maintenance of access routes, The Contractor shall provide any signs or directions which he may consider necessary for the guidance of his staf, labour and others. The Contractor shall obtain any permission that may be required from the relevant authorities for the use of such routes, signs and directions, FIDIC 1995

You might also like