HAIL SURFACE FACIL

Contract Number:

RT REQUEST

TIE IN Line
Sr. No. Dwg no./Rev WELDING PROCESS POSITION WPS No Weld No. Welder ID Dia(In)
NO.. Class

1 HD-EC-TF-RF-166-901 TP 20A GTAW B1N 6G TR-235 1 TW-26 1

2 HD-EC-TF-RF-166-901 TP 20B GTAW B1N 6G TR-235 2 TW-26 1

3 HD-EC-TF-RF-166-901 TP 20C GTAW B1N 6G TR-235 3 TW-26 1

Page 1 of 4
9

10

IDENTIFICATION ON FILM AS FOLLOWS: ADOC/TR/TARGET/ CONTRACT NO/ DWGN

QA/Q

Name
Signature
Date

Page 2 of 4
CE FACILITIES
PROJECT: HSF
Date:- 22-Oct-16 REQUEST NO : 001
Joining
Electrode/Filler Wire Material Description
Elements
Joint Type Fit-up
Sch/ Thk Final Visual
(Butt/Branch/ (Acc) Remarks
(mm) (Acc-Rej)
Fillet/Socket) (Viz,PipeFlg,Pip Specification
1st Component 2nd Component Date
e-Elb,Etc) (upstream) (Down Stream)

PIPE TO
6.35 Butt ER 70 S-2 A 106 Gr B A 105 N ACC ACC
FLANGE

PIPE TO
6.35 Butt ER 70 S-2 A 106 Gr B A 105 N ACC ACC
FLANGE

PIPE TO
6.35 Butt ER 70 S-2 A 106 Gr B A 105 N ACC ACC
FLANGE

Page 3 of 4
O/ DWGNO/PROCESS/SPOOL NO./WPS NO / WELDER ID/PIPE X THK/DATE

QA/QC Inspector/Engineer QA/QC Inspector/Engineer


(Contractor) (Company)

Page 4 of 4