RT REQUEST
TIE IN Line
Sr. No. Dwg no./Rev WELDING PROCESS POSITION WPS No Weld No. Welder ID Dia(In)
NO.. Class
Page 1 of 4
9
10
QA/Q
Name
Signature
Date
Page 2 of 4
CE FACILITIES
PROJECT: HSF
Date:- 22-Oct-16 REQUEST NO : 001
Joining
Electrode/Filler Wire Material Description
Elements
Joint Type Fit-up
Sch/ Thk Final Visual
(Butt/Branch/ (Acc) Remarks
(mm) (Acc-Rej)
Fillet/Socket) (Viz,PipeFlg,Pip Specification
1st Component 2nd Component Date
e-Elb,Etc) (upstream) (Down Stream)
PIPE TO
6.35 Butt ER 70 S-2 A 106 Gr B A 105 N ACC ACC
FLANGE
PIPE TO
6.35 Butt ER 70 S-2 A 106 Gr B A 105 N ACC ACC
FLANGE
PIPE TO
6.35 Butt ER 70 S-2 A 106 Gr B A 105 N ACC ACC
FLANGE