Attendees:
1. Mrs. Andi Basse (AB) - PT. WIETASHA PUTRINDO WISATA (PT. AV)
2. Mr. Sumardi (SM) - PT. Hutama Karya (PT. HK)
3. Mr. Md. Kerna (MK) - PT. Hutama Karya (PT. HK)
4. Mr. Moch. Masjhuri (MM) - PT. Hutama Karya (PT. HK)
5. Mr. Wicana (W) - PT. Tunas Jaya Sanur (PT. TJS)
6. Mr. Wardana (WD) - PT. Tunas Jaya Sanur (PT. TJS)
7. Mr. Herman (H) - PT. Alkonusa Inti Daya (PT. AID)
8. Mr. Bambang Suprihadi (BS) - PT. Alkonusa Inti Daya (PT. AID)
9. Mr. Joko Soelistyo (JS) - PT. Alkonusa Inti Daya (PT. AID)
10. Mr. Andi Daliandi (AD) - Cdesign (C)
11. Mr. Agus P. (AP) - Cdesign (C)
12. Mr. Achmad DW (ADW) - Cdesign (C)
13. Mr. Didik W. (DW) - Cdesign (C)
14. Mr. Adipa Gunantarosa (AG) - Cdesign (C)
A. Opening AB
Mrs. AB opening the Tender and introducing of The Alam KulKul Resort to
all Attendees and give authorization to AD to continue with tender
explanation.
AD
B. Administration
1. Scope of work including, Bathroom of Java Villa 102; Java Villa 120; Resort
Standard and Resort Villa.
6. Next payment will be paid by monthly progress payment and will proceed
and paid by owner max 14 days after Certificate of Payment issued.
8. Every worker has nametag and not allowed across construction area.
9. Electrical, water and telephone work will coordinate by owner and Hotel
Management.
10. Bill of Quantity wasnt bind. Any change of Bill of Quantity added in the end
of Bill of Quantity.
11. Any change of work/variation order must approved by owner; if not decided
max 3 days after VO proposed, contractor will execute as on contract.
13. Tender bid must submitted received before 15.00 AM on Friday, May 24,
2002 to PT. Wietasha Putrindo Wisata.
AD
C. Technical
1. Size of material should be fix; tolerance just for timber door and window
frame and pergola; + 3 mm for 150 mm.
3. Plaster painted work is flat rough plaster, white glue (equal to fox glue)
coating and then end finished in Dulux Weathershield.
8. Ceiling shower using Caroma head industry ype, 20 cm (8) pipe length will
be adjust to site and over with stainless steel pipe.
10. Tumbled marble to bathtub must be rounded at the corner (as vertical wall
against flow of bath tub).
11. Marmo marble wall installed in thickness facing out, similar to black
Singaraja slate stone installation.
12. Water proofing to roof deck & pool using termproof membrane coating, and
round using cement base.
13. Green undesite slate stone to plunge pool in 10x10 cm with no sharp and
rough surface.
14. Pool pump and skinner and sand filter equal to Hayward PK; and using
salt chlorinator equal to Clear Water.
15. Each drain complete with long P-trap without any openable.
16. Shaver outlet using separate step down trafo and gravir lettering indicate
110 V and 220V.