Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

A PT. PERTAMINA (PERSERO)


DEPOT TBBM PULAU BAAI
DI BENGKULU

B
KONSULTAN

PT SUCOFINDO (PERSERO)
CABANG BENGKULU
Pagar Harmonika
SUCOFINDO

C
Rumah Gudang
Selang Limbah B3
PEKERJAAN :

LIGHTNING SURGE PROTECTION DAN


LAPANGAN TANGKI
GROUNDING SYSTEM DI TBBM
6 4 2 8 9 PULAU BAAI
D
1500 KL 1500 KL 1500 KL 2500 KL 2500 KL
PR Kero Kero PR SL JUDUL GAMBAR

LAY OUT TERMINAL BBM PULAU BAAI

LAPANGAN
E
DRUM YARD
5 3 1 7 10 TANGGAL SKALA KETERANGAN
1500 KL 1500 KL 1500 KL 1500 KL
PR PR PR Avt 5000 KL
SL

Gudang
Pelumas
GBR NO. REVISI
Pagar Harmonika

01

FILLING SHED Kolam Kolam


PMK PMK
Gudang
Pelumas
Genset

Material
Rumah Foam
H
Bengkel Pompa Chamber

Mini Fire
Parkir Ground
sepeda KANTOR
motor Musholla
I
GEDUNG

Pagar Tembok
Serba Guna
Parkir Mobil R. Dinas R. Dinas R. Dinas
Tangki

J
Pagar Harmonika Pagar Harmonika Pagar Harmonika

Ke Pelabuhan (PT.Pelindo) Ke Bengkulu

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
PT. PERTAMINA (PERSERO)
DEPOT TBBM PULAU BAAI
DI BENGKULU

KONSULTAN

PT SUCOFINDO (PERSERO)
CABANG BENGKULU
SUCOFINDO

PEKERJAAN :

40
LIGHTNING SURGE PROTECTION DAN
GROUNDING SYSTEM DI TBBM
40 PULAU BAAI
JUDUL GAMBAR

300
DENAH LIGHTNING PROTECTION MONOPOLE

TANGGAL SKALA KETERANGAN


150

35 80 35

GBR NO. REVISI

35
02

150 80

300 35 300

150

50
40 40
40
40
50

DENAH LIGHTNING PROTECTION SYSTEM


Skala 1: 50
PT. PERTAMINA (PERSERO)
DEPOT TBBM PULAU BAAI
DI BENGKULU

KONSULTAN

TAMPAK LIGHTNING PROTECTION SYSTEM


PT SUCOFINDO (PERSERO)
CABANG BENGKULU
SUCOFINDO

PEKERJAAN :

LIGHTNING SURGE PROTECTION DAN


GROUNDING SYSTEM DI TBBM
PULAU BAAI
JUDUL GAMBAR

Skala 1: 100
TAMPAK LIGHTING PROTECTION MONOPOLE

TANGGAL SKALA KETERANGAN

MukaTanah
GBR NO. REVISI

100
03

Control Box
Penahan Tiang

Pondasi Tiang
Kaki Tiang
80150

20 110 40

250 300 400 450 500 600

Pondasi Guy Wire


PT. PERTAMINA (PERSERO)
DEPOT TBBM PULAU BAAI
DI BENGKULU

KONSULTAN :

PT SUCOFINDO (PERSERO)
250
CABANG BENGKULU
SUCOFINDO

PEKERJAAN :

LIGHTNING SURGE PROTECTION DAN


300
GROUNDING SYSTEM DI TBBM
PULAU BAAI
JUDUL GAMBAR

TAMPAK LIGHTING PROTECTION MONOPOLE

400

TANGGAL SKALA KETERANGAN

GBR NO. REVISI

03
450

500

600

Kaki Tiang

Penahan Tiang
Pondasi Guy Wire

Control Box
MukaTanah
20

100
110
Pondasi Tiang

40

80
150

TAMPAK LIGHTNING PROTECTION SYSTEM

Skala 1: 100
PT. PERTAMINA (PERSERO)
DEPOT TBBM PULAU BAAI
DI BENGKULU

KONSULTAN

PT SUCOFINDO (PERSERO)
CABANG BENGKULU
SUCOFINDO

PEKERJAAN :

LIGHTNING SURGE PROTECTION DAN


GROUNDING SYSTEM DI TBBM
PULAU BAAI
JUDUL GAMBAR

Kabel NYY 70 mm

DETAIL PONDASI CAKAR AYAM

25

TANGGAL SKALA KETERANGAN


50

200

50

Bak Kontrol

Penahan Besi Siku 50.50.5 25

Muka Tanah GBR NO. REVISI


20

04

Beton Bertulang 1 : 2 : 3

110

40
Beton Bertulang 1 : 2
:3
Lantai Kerja

10 35 80 35 10

150

DETAIL PONDASI CAKAR AYAM


Skala 1: 20
PT. PERTAMINA (PERSERO)
DEPOT TBBM PULAU BAAI
DI BENGKULU
Pipa PVC AW
Handle Besi Beton 12 mm
Kabel NYY 70 mm
Tutup Bak Kontrol Plat 3 mm
L 70.70.7 KONSULTAN
MukaTanah
Rangka Penutup Siku 40.40.4
30
Span Screw M 12
5 PT SUCOFINDO (PERSERO)
Muka Tanah CABANG BENGKULU
20
20
SUCOFINDO
30

Coupling Rod
PEKERJAAN :
10
Beton Cor
60
LIGHTNING SURGE PROTECTION DAN
10 30 10 GROUNDING SYSTEM DI TBBM
PULAU BAAI
Beton Bertulang 1 : 2 : 3
Cooper Rod JUDUL GAMBAR
Washer 20

DETAI BAK KONTROL, PONDASI SLING,


5
SAMBUNGAN ANTARA BESARAN PIPA, KURN
5 20 40 20 5 LIGHTING PROTECTION, KUPINGAN GUY WIRE
60

DETAIL BAK KONTROL TANGGAL SKALA KETERANGAN


Air Tanah Skala 1: 20
DETAIL PONDASI SLING
GBR NO. REVISI
Skala 1: 20
05

Kabel NYY 70 mm
40
Galvanized Pipe
Plat 10 mm
Disch Vertikal 20

Tali Sling 8 mm
51.5
Disch Horizontal

Housing Terminal Tangga


DETAIL KUPINGAN GUY WIRE
Skala 1: 20

Kabel NYY 70 mm

50
Kabel NYY 70 mm

15

DETAIL SAMBUNGAN ANTARA BESARAN PIPA


Skala 1: 20

DETAIL KURN LIGHTNING PROTECTION


Skala 1: 20

You might also like