Planning U8
Contents
o Production Schedule
o Script / Shooting Script
o Storyboard
o Props List
o Crew List
o Location Recces
o Clearances and Confirmations
o Contingency Plan
Production Schedule
Location
The location for the shooting day is the Photography Studio 1 in Rotherfield, The
Henley College. If this location is unavailable, I will use the backup studios.
Date
15/06/17
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Starting Creating Finishing Creating Creating all / /
and shooting shooting crew list location
Morning
finishing script script recces
production
schedule
Starting Developing Starting and Scouting Uploading / /
storyboards shooting finishing for clearances
script props list locations and
Afternoon and getting confirmations
them
together
Evening/
Finishing / Contacting Scouting Creating / /
Night storyboards peers to for contingency
form a crew locations plan
22/05/17
Filming
Every scene (Entire music video)
Team members/Actors
Umar Hussain Director/Actor
Mid side shot of the artists face from the The only way out of here is the way I've
side avoided for all my life.
Front shot of the artist playing the piano There's so many things I wanna say,
Side shot of hands playing the piano but there's too many things still in the
Behind the hand shot of piano way.
Close-up shot of the hands from the I'm lost, please help me find my place.
front You're the only one, please lead me out
Birds eye view shot of the artist of the dark.
Close-up shot of the artists mouth Please lead me out of the dark.
Shot of the artist with tripod in the way Please lead me out of the dark.
followed by a front shot of him glitch
bruising added to hands and bruising to
right cheek bone, left eye and neck
Type of room/area:
Photography studio
Location Address:
Deanfield Ave, Henley-
on-Thames
Post code:
RG9 1UH
Hazards Solutions
The first hazard present is there are To prevent the first hazard, all the
loads of loose cables everywhere which cables will be directed to one side of
can be tripped on the room and everyone on set will be
The second hazard is the lights shown where each cable is. This will
overheating from being on for long prevent any trips over wires.
periods of time. To prevent the second hazard, the lights
The third hazard is there being a large will periodically be turned off to stop the
quantity of equipment put up in a not bulbs from blowing.
so large room, creating tight spaces To prevent the third hazard, all on set
which could cause collisions with will be made aware of what equipment
objects. is where and shown a specific path to
get to different areas of the set to
prevent injury.
Clearances and Confirmations
Equipment
Below is the request form for the equipment I wished to hire from the department.
This equipment involved 1 tripod, 2 lamp lights and a dolly. I already have a tripod in
my possession as well as my own camera. I am sourcing 2 other cameras from peers
who have already given them to me, ensuring they are ready to be used when
required.
Crew/Actors
To ensure my crew/actors are available on the shooting days, I have contacted
them beforehand to make sure the dates are fine and for them to keep the date
free so no one drops out last minute. I have also contacted backup crew members
to check their availability on the day because if any unfortunate events occur to the
original crew causing their absence, I will have people ready to come on set if need
be.
My first attempt at contacting the crew was through email, however, as you can see
below, only 1 member replied.
This meant the recipients were not checking their emails, leading me to go
through an informal method of contacting them being Facebook as this is a
site they are all more likely to check than their emails.
As seen above, all the crew members have accepted the dates and will be
attending the shoot.
Contingency Plan
Actors/Crew
To prevent the chances of an issue occurring in the first place, I did have in mind to
keep a limited amount of people within the video as this would prevent the chances
of people dropping out last minute etc. The reason as to why I have kept this in mind
is due to previous incidences where people havent been trustworthy and reliable. In
the end, my idea resulted in only having one actor anyway in the production which
is going to be performed by myself. As it is my production which I myself am
directing and will be giving directions to others, I have not organised a backup for
myself as I physically need to be there otherwise I will fail the project.
On the day of the shoot for the music video, if my original crew members have
major difficulties in attending, I have prepared a secondary crew who will be taking
the places of those who have not arrived. If my camera operator Joe Maine is
unable to get on set, I am able to call upon Jamie Filby who is a camera operator
just as skilled that would be able to successfully replace him on set. If my makeup/fx
artist and sound controller Annie Callaway is unable to make it to the shoot, I have
Jenna Marie who is of equal talents to replace Annie on set.
It is important I have created backup for the crew members as they are essentially
the legs to the production, so if one was unable to attend and I didnt have a
backup, the production would simply not be creatable.
Locations
For my music video, I have made the Photography Studio 1 the location for the
entire production. In order to make sure there isnt any problems with utilising this
room when it comes to the shoot days, I have pre-discussed and booked its use with
the owners, meaning it should be available to shoot in when I require it. If by any
chance I am unable to use it, I have made sure that one of the other photography
studios on site will be available to use. Although the other studios are smaller and will
be harder to work in, the backdrop of the video would be hard to achieve
elsewhere making it essential to use one of the spare rooms.
It is important for me to have back up locations as getting the team together all on
the same dates is a hard task in itself, therefore, not having a place to shoot when
everyone is together complicates and delays the situation further. Having a backup
location means even if the original location is unavailable, the whole team is still
able to work towards a final production just in a different location, and not just waste
the day.
Equipment
To reduce the chances of issues occurring with the equipment, I have filled in an
equipment application form which books what I will be needing days in advance. If
other individuals have not bought back equipment that I would be using, I will have
to utilise other equipment that suffice the same purpose or maybe even change
some shots in the music video to compensate. If the lighting equipment isnt
available, I will have to use the lighting equipment that is available in the
photography studio already and manipulate those to my needs, however, using this
equipment may restrict what I am able to achieve visually.