The document provides a 13-step sequence for flooring activities in a blasting booth, including preparing the ground, laying down road base, a polythene sheet, steel mesh reinforcement divided into squares, fine concrete with hardener 15 cm thick that is vibrated and finished, and final curing.
The document provides a 13-step sequence for flooring activities in a blasting booth, including preparing the ground, laying down road base, a polythene sheet, steel mesh reinforcement divided into squares, fine concrete with hardener 15 cm thick that is vibrated and finished, and final curing.
The document provides a 13-step sequence for flooring activities in a blasting booth, including preparing the ground, laying down road base, a polythene sheet, steel mesh reinforcement divided into squares, fine concrete with hardener 15 cm thick that is vibrated and finished, and final curing.
2. Water flooding 3. Compacting using vibrators 4. 10 cm thick road base 5. Water flooding 6. Compacting using vibrators 7. 1000 gauge polythene sheet with 20 cm minimum overlap 8. Mesh of 8 mm dia bars localized to 5 mtr x 5 mtr squares, divided by fixed flexells 9. Expansion interconnection between meshes 10.Fine slurry concrete with hardener for industrial use, 15 cm thick 11.Vibration to completion using vibrators, minimum 3 nos 12.Finishing 13. Ponding for curing