Abstract To cope with the problems revealed in the commissioning stage of 220
t/h boilers, the causes of the problems and their countermeasures are presented, which
provided good operation results.
KeywordsCFB boiler; operational analysis; improving measures
1
1.1
1
4 2
4 4
2 3 1
2 3
200 mm 3
L
L 2
3 D
2
2.1
a. L L 13
b. L L
L
c.
D
d. L 1
3 1
e.
2.2
CFB
32 mm4 mm
a.
32
mm4 mm
b. 2 1
=1.1
Vp=10 618 m3/h 1
Vh=16 700
m3/h
c.
1.8 MPa 1.4MPa
OFT
d.
e.
2.3
2.3.1
a.
35% TB 100%
b.
c.
2.3.2
60 000 m3/h 60%
2.4
07 mm
10 mm 10%
2.5
3 DCS 3
3 2 3
2.6
2.7
a.
b.
c.
d.
e.
3
3.1
a. L
b. L
L
c. 1 108 mm 133 mm 1
1
d. 1 2 3
e. 2
0.3 kPa
f. 1 700
3.2
a. 32
mm4 mm12Cr1MoV 57 mm3.5 mm1Cr18Ni9Ti
1 100 mm 1 300 mm
b. 1 670
1 900
1 900
c.
d. 5 s
e.
60% 10%15%
90%
900
f.
3.3
a.
b.
c.
3.4
2 3
3.5
3
3.6
3.7
CFB
4
220 t/h CFB
220 t/h CFB
CFB