Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

TEMPORARY REVISION NUMBER 14

DATED 14 MARCH 2014

MANUAL TITLE Centurion Series 1970 Thru 1976 Service Manual


MANUAL NUMBER - PAPER COPY D2004-5-13
TEMPORARY REVISION NUMBER D2004-5TR14

MANUAL DATE 1 December 1972 REVISION NUMBER 5 DATE 1 July 2004

This Temporary Revision consists of the following pages, which revise and add to existing pages in the paper
copy manual.

SECTION PAGE SECTION PAGE


2B - Title Page 2B-00-00 1
2B - List of Effective 1 2B-10-00 1
Pages
2B - Contents 1 2B-11-00 1
2B - List of Revisions 1

REASON FOR TEMPORARY REVISION


1. To add new Airworthiness Limitations Sections 2B-00-00, 2B-10-00, and 2B-11-00.
FILING INSTRUCTIONS FOR THIS TEMPORARY REVISION
1. For Paper Publications, file this cover sheet behind the publications title page to identify inclusion of the
temporary revision in the manual. Insert the new pages in the publication at the appropriate locations.
2. For CD Publications, mark the temporary revision part number on the CD label with permanent red
marker. This will be a visual identifier that the temporary revision must be referenced when the content
of the CD is being used. Temporary revisions should be collected and maintained in a notebook or binder
near the CD library for quick reference.
EXPORT COMPLIANCE
1. This publication contains technical data and is subject to U.S. export regulations. This information has
been exported from the United States in accordance with export administration regulations. Diversion
contrary to U.S. law is prohibited. ECCN: 9E991

Cessna Aircraft Company


CESSNA AIRCRAFT COMPANY
MODEL 210 SERIES (1970 1976)
SERVICE MANUAL

SECTION

2B
AIRWORTHINESS
LIMITATIONS
THE AIRWORTHINESS LIMITATIONS SECTION IS FAA APPROVED AND GIVES INSPECTIONS AND
MAINTENANCE THAT ARE REQUIRED BY PARTS 43.16 AND 91.403 OF TITLE 14 OF THE CODE OF
FEDERAL REGULATIONS, UNLESS AN ALTERNATIVE PROGRAM HAS BEEN FAA APPROVED.

10 FEBRUARY 2014
CESSNA AIRCRAFT COMPANY
MODEL 210 SERIES (1970 1976)
SERVICE MANUAL

LIST OF EFFECTIVE PAGES

SECTION PAGE DATE

2B Title
2B List of Effective Pages Page 1 Feb 10/2014
2B Table of Contents Page 1 Feb 10/2014
2B List of Revisions Page 1 Feb 10/2014
2B-00-00 Page 1 Feb 10/2014
2B-10-00 Page 1 Feb 10/2014
2B-11-00 Page 1 Feb 10/2014

2B - LIST OF EFFECTIVE PAGES Page 1 of 1


Cessna Aircraft Company Feb 10/2014
CESSNA AIRCRAFT COMPANY
MODEL 210 SERIES (1970 1976)
SERVICE MANUAL

CONTENTS

LIST OF REVISIONS ......................................................................................................................... Page 1

AIRWORTHINESS LIMITATIONS ..................................................................................... 2B-00-00 Page 1


Scope .................................................................................................................... 2B-00-00 Page 1
Definition ............................................................................................................... 2B-00-00 Page 1

INSPECTION TIME LIMITS ............................................................................................... 2B-10-00 Page 1


General.................................................................................................................. 2B-10-00 Page 1
Inspection Schedule .............................................................................................. 2B-10-00 Page 1

REPLACEMENT TIME LIMITS .......................................................................................... 2B-11-00 Page 1


General.................................................................................................................. 2B-11-00 Page 1
Inspection Schedule .............................................................................................. 2B-11-00 Page 1

2B - CONTENTS Page 1 of 1
Cessna Aircraft Company Feb 10/2014
CESSNA AIRCRAFT COMPANY
MODEL 210 SERIES (1970 1976)
SERVICE MANUAL

LIST OF REVISIONS

1. Revisions

A. FAA Approved Airworthiness Limitations are incorporated in this manual as Section 2B. Revisions to
Section 2B are dated as approved by the FAA Regional Manager, Aircraft Certification Office. To make
sure that the maintenance information required under Title 14 of the Code of Federal Regulations, Parts
43.16 and 91.409 is current, the revisions listed in Table 1 must be incorporated in Section 2B as they are
issued.

Table 1. Original Issue February 10, 2014

Revision Number Date Revision Number Date

2B - LIST OF REVISIONS Page 1 of 1


Cessna Aircraft Company Feb 10/2014
CESSNA AIRCRAFT COMPANY
MODEL 210 SERIES (1970 1976)
SERVICE MANUAL

AIRWORTHINESS LIMITATIONS

1. Scope

A. This section gives the mandatory replacement times and inspection intervals for components and airplane
structures. This section also gives the required details to monitor them using scheduled inspections.
This section applies to items such as fatigue components and structures, which are a part of the
certification procedures.

NOTE: The Airworthiness Limitations section is FAA-Approved and gives specified inspection and
maintenance necessary under Parts 43.16 and 91.409 of Title 14 of the Code of Federal
Regulations, unless an alternative program has been approved by the FAA.

2. Definition

A. This section has two subsections:


(1) The Inspection Time Limits Section (2B-10-00) contains systems and components that must be
examined at specified intervals. These intervals show the maximum time permitted between
inspections.
(2) The Replacement Time Limits Section (2B-11-00) contains life-limited components that are to be
replaced at a specified time.

B. Operational Inspection Times


(1) You must first find the category of your airplane's operation. Refer to Section 2A-10-00, Inspection
Time Limits Structure, Step 2A (1) to determine if the Typical or Severe inspection time limits will be
used.
(2) After the operating environment is known, make an airplane logbook entry that states which
inspection schedule (Typical or Severe) is being used.

2B-00-00 Page 1
Cessna Aircraft Company Feb 10/2014
CESSNA AIRCRAFT COMPANY
MODEL 210 SERIES (1970 1976)
SERVICE MANUAL

INSPECTION TIME LIMITS

1. General

A. The inspection time intervals that apply to the systems and components that follow represent the
maximum inspection intervals. Detailed inspection and maintenance check procedures are described in
the associated documents elsewhere in this manual.

NOTE: An initial inspection and subsequent recurring structural inspections of these items are necessary
to maintain the airworthiness of the airplane. The recurring inspection intervals do not begin until
after the completion of the initial inspection.

2. Inspection Schedule

A. Wings (Section 4)
(1) Main Spar Lower Cap
Part Numbers 1221005-3 and -4
For airplanes operating in a typical environment, do the inspection at 8,000 hours and every
2,000 hours thereafter.
Refer to Section 2A-14-23, Supplemental Inspection Number 57-11-03.
(2) Main Spar Lower Cap
Part Numbers 1221005-3 and -4
For airplanes operating in a severe environment, do the inspection at 3,500 hours and every 500
hours thereafter.
Refer to Section 2A-14-23, Supplemental Inspection Number 57-11-03.

NOTE: Refer to Section 2-10-00 to determine the operating environment.


NOTE: For airplanes which have exceeded the initial inspection interval, the inspection must be done
within the next 100 hours or before July 1, 2014.

2B-10-00 Page 1
Cessna Aircraft Company Feb 10/2014
CESSNA AIRCRAFT COMPANY
MODEL 210 SERIES (1970 1976)
SERVICE MANUAL

REPLACEMENT TIME LIMITS

1. General

A. You must replace the life-limited components that follow at the specified time. It is recommended that
you schedule the components for replacement during the airplane's inspection interval that aligns with or
occurs just before the specified time limit expires. Procedures to replace the components are given in the
applicable sections in this service manual.

2. Replacement Schedule

A. There are currently no scheduled replacement time limits associated with this airplane.

2B-11-00 Page 1
Cessna Aircraft Company Feb 10/2014

You might also like