‘SYSTEM DATE| LOCATION / AREA S.NO CHECK THAT CHECKED 1__ [Major Plants installed as per the specification&. approved drawing 2 _ [Duct work completed / Sound Attenuators Installed 3 [Air fiters fixed and clean (Pre + 89) 4 _ [Starter Panel Installed 5 [Terminals Fixed 6 __|VAV/CAV Installed 7 [Dampers installed and accessible 8 [VED installed ‘9 [Measurement Point identified and test Hole Drilled 10 _ |FD/ VCDs Checked and Opened 11_|Fan Chamber / AHU Units Glean 412 _ [Motor termination and Gontrol unit is Checked 13 _ |Fan rating is correct 14 _ |CHW Piping Completed With Valves & Ancillaries 18 _ [Drain slope and drain pipe is checked BUILDINGS. 16 |Doors Fixed 47__ |Re Circulation and Air transfer Opening Correct Size and Position’ ‘SUPPLY FAN RETURN FAN ae CHECKED CHECKED, 18 [Direction of rotation is correct 19 _ [Fan and Motor are Lubricated 20 _ [Fan Shaft and Bearing aligned Properly 21 [Drive guards fitted 22 _|V Betts Fitted , Tension is Correct, 23 [Adequate Access to Fan Ok REMARKS |

You might also like