S.NO CHECK THAT CHECKED
1__ [Major Plants installed as per the specification&. approved drawing
2 _ [Duct work completed / Sound Attenuators Installed
3 [Air fiters fixed and clean (Pre + 89)
4 _ [Starter Panel Installed
5 [Terminals Fixed
6 __|VAV/CAV Installed
7 [Dampers installed and accessible
8 [VED installed
‘9 [Measurement Point identified and test Hole Drilled
10 _ |FD/ VCDs Checked and Opened
11_|Fan Chamber / AHU Units Glean
412 _ [Motor termination and Gontrol unit is Checked
13 _ |Fan rating is correct
14 _ |CHW Piping Completed With Valves & Ancillaries
18 _ [Drain slope and drain pipe is checked
BUILDINGS.
16 |Doors Fixed
47__ |Re Circulation and Air transfer Opening Correct Size and Position’
‘SUPPLY FAN RETURN FAN
ae CHECKED CHECKED,
18 [Direction of rotation is correct
19 _ [Fan and Motor are Lubricated
20 _ [Fan Shaft and Bearing aligned Properly
21 [Drive guards fitted
22 _|V Betts Fitted , Tension is Correct,
23 [Adequate Access to Fan Ok