3) Surface
a) Carraige way Width propose 5.5 mts
a1) existing Carraige way width 3.75 mts
b) Metal Crust
4) Road Fully Bridged with CD works No
Earth work up to 12 mt width
10 Earth Work 12.00 as per MORT & H Specification OffSet
Sub Base (Soling) Throughout 0.000 GSB meterial .
GSB second 0.000 GSB meterial . 0.15
Metalling (WBM) 0.100 machine crused stone layer 40 0.15
0.150 mm to 63
GRADE II mm size in full width
WMM WMM
0 tack coat
as per I.R.C. standred Kg/10smt 0.15
Asphaltic Work(A) 0.0375 specification 2.5
0 25 mm thick carpet 2.5
0 .18 cmt/10 smt seal coat
Asphaltic Work(B) 0 50 MM BM 2.5
0.0375 37.5MM BM 2.5
0.02 20MM MSS
0 25 MM SDBC 2.5
HSS(Quarryspall) 0.100
Jungle Cutting & Side Gutter 2.800 2.8 KM length in jungle cutting
Crucst CC in mtr
length CC road 0.000 Nil 0.1 1:4:8
thicknees(1:4:8/1:3:6) 0.000
thicknees(1:1.5:3) 0 Nil
16 Road furnishing
Nos. Items
1) Providing & fixing ordinary Kilometre stone 3
2) Providing and fixing junction board . 2
3) Providing and fixing village name boards . 1
4) Supplying and fixing Road sign board. 8
5) Providing & Fixing sign boards (Give way). 2
17 Protection Wall
Length 0 meter
Top Width(a) 0 meter
Bottom Width(b) 0 meter
Height(h)( Above GL) 0 meter
Height(H)( Above CC Level) 0 meter
Excavation Height 0 meter
CC(Foundation Concret) Height 0 meter
Reinforcement dia. 0 mm
Weep Holes in Nos. 0 Nos.
19 CD Works
Quarry
Gr.I B.T. Metal M.C metal Murrum Grit Stone Dust GSB
13 rate for lead rate analysis spall
take it ahmedabad
cost 173 293 64 274 105 126 84
per 5 km 115.85 115.85 106.54 106.54 106.54 115.85 115.85
per km 6.03 6.03 - 5.6 5.6 5.6 6.03
Quarry
Gr.I B.T. Metal M.C metal Murrum Grit Stone Dust GSB
spall Send
For Ahmedabad 45 to 90 mm 45 to 63 mm below 40
cost 230 390 85 365 150 120 120 220
per 5 km 165.18 165.18 152.44 152.44 152.44 152.44 152.44
For Nadiad
cost 230 390 85 365 150 100 120
per 5 km 152.76 152.76 140.98 140.98 140.98 130.54 130.54
For Anand
cost 230 390 85 365 150 100 120
per 5 km 152.76 152.76 140.98 140.98 140.98 130.54 130.54
For Sabarkantha
cost 230 390 85 365 150 100 120
per 5 km 152.76 152.76 140.98 140.98 140.98 130.54 130.54
16 Road furnishing
Nos. Items SOR Rate A'bad Nadiad Anand S.k.
1) Providing & fixing ordinary Kilometre stone. 3 1939.0 1922.0 1554.0 1554.0 1395.0
2) Providing and fixing junction board . 2 3201.0 6562.0 6711.0 6711.0 6645.0
3) Providing and fixing village name boards .. 1 5008.0 4973.0 5010.0 5010.0 4975.0
4) Supplying and fixing Road sign board. 8 4616.0 4571.0 4879.0 4879.0 4357.0
5) Providing & Fixing sign boards (Give way). 2 3570.0 5945.0 5945.0 5945.0 5945.0
17 Protection Wall
Length 0 meter
Top Width(a) 0 meter
Bottom Width(b) 0 meter
Height(h)( Above GL) 0 meter
Height(H)( Above CC Level) 0 meter
Excavation Height 0 meter
CC(Foundation Concret) Height 0 meter
Reinforcement dia. 0 mm
Weep Holes in Nos. 0 Nos.
18 SOR Item
Take it (S.K.) Ahmedabad Nadiad Anand S.k.
EARTHWORK :Clearing and grubbing of road toe 35242.00 Hect. 2500.000 2500.000 2500.000 2500.000
length up to end
Earth work for embankment including breaking clods 92.280 Cum. 82.370 86.000 86.000 82.800
dressing with all lead and lift and including watering
rolling and consolidation of subgrade in layers
including filling the depressions which occur durring
the process using vibratory roller 80 to 100 KN static
wt. (A) From borrow pits with in land width with all
lead & lift.. sor it no 4
Box cutting the road surface to proper slope and
camber for making a base for road work incl.
removing the excavated stuff and depositing on the
road side slope as directed upto 50 Mt. lead(S.O.R. 83.000 Cum. 75.000 75.000 75.000 75.000
Pg. 19 I.No. 8.0.0)
CC ROAD : Providing tharmo mechanically treated 54.700 Kg. 57.000 56.500 56.500 56.300
bar (T.M.T.) conforming to IS 1786 - Fe 415 for RCC
work inclu. bending, binding and placing in position
complete upto floor two level. (SOR i. No. 35 P. No.
26)
Basic Rate of C.C. 1:2:4 (S.O.R. P. - 20 I.No. 11 . 3820.000 Cum 3903.000 3902.000 3902.000 3776.000
5.4.1 (A) ) Bl
Basic Rate of C.C. 1:4:8 (S.O.R. P. - 116 I.No. 2827.000 Cum 2112.000 2639.000 2639.000 2496.000
5.3.3) BL
ROAD FURNISHING: Providing & fixing Hecto metre 660.000 Nos. 433.000 461.000 461.000 415.000
stone as per I.R.C type design including painting,
lettering etc.complete. (i) Fixing in C.C.1:5:10
Providing & fixing Indicator stone as per I.R.C. type 143.000 Nos. 143.000 143.000 143.000 143.000
design incl. white washing etc.complete. (Fixing in
earth.)
Providing & fixing Guard stone of pre cast / Cast in 330.000 Nos. 322.000 322.000 322.000 322.000
situ in C.C. M-150. including necessary
reinfircement & oil panting as per drawing & fixing
in C.C. 1:5:10 etc.complete.
Road Marking with hot applied Thermoplastic 380.000 Nos. 380.000 380.000 380.000 380.000
compound with reffectorising glass beads on
Road Marking with hot applied Thermoplastic
compound with reffectorising glass beads on
bituminous surface. Providing & laying of hot
applied thermoplastic compound 2.5mm thick
including reffectorising glass beads @ 250 gms per
sqmt area, thickness of 2.5mm is exclusive of surface
applied glass beads as per IRC 35. The finished
surface to be level uniform and free from streaks
and holes
Providing and laying Weep hole in abutment and 36.000 Nos. 36.000 124.000 124.000 124.000
return by using A.C. pipe of 100 mm dia including
laying in proper grade and joining complete etc as
per details specification .
[ (Bridge SOR I NO 50 P. 157)]
19 CD Works
Sr.No. No. of CD Location of Pipe Proposed pipe No. of rows Existing pipe Prop . Length G.L F.R.L
culvert KM. dia. MM length of pipe
C.D No.
Rate Cd Eorks
2 Providing and filling in foundation M 100 3328.00 3139.00 3139.00 3045.00 3344.00
3 Providing and filling in foundation M 150 3928.00 3739.00 3739.00 3645.00 4953.00
4 Supplying and fixing reinforced concrete heavy 2754.00 2754.00
duty non pressure pipes
750 2367.00 2367.00 2367.00 2356.00 1956.00
900 3023.00 3023.00 3023.00 3006.00 3387.00
1000 4051.00 4051.00 4051.00 4029.00 5502.00
1200 5103.00 5103.00 5103.00 5080.00 7162.00
5 Numbering the C.D.work with approved paint 53.00 56.00 56.00 78.00 53.00
6 Prividing TMT reinforcement 57.00 56.50 56.50 56.30 54.70
7 Providing and filling sand below R.C.C. raft 277.00 277.10 277.10 276.00 360.00
8 Providing and laying weep hole in abutment and 36.00 124.00 124.00 124.00 36.00
returning
1 2 3
Lead Btm metal below 40 mm Stone dustbulk asphalt
5 to 10 6.72 6.72 6.18 6.18 7.13
10 to 15 6.97 6.97 5.49 5.49 6.34
15 to 25 5.45 5.45 5.01 5.01 5.79
25 to 50 5.38 5.38 4.95 4.95 5.72
50 to 100 6.03 6.03 5.6 5.6 6.46
100 to 200 5.35 5.35 4.92 4.92 5.68
200 to 400 5.13 5.13 4.72 4.72 5.45
beyond 400 2.41 2.41 2.21 2.21 0
take it ahmedabad
Beyond 5 Km basic rate up to 5 km beyond 5 km
S.k.
2 440.00 152.44 5.6
5.68 2 487.50 152.44 5.6
5.68 2 535.00 152.44 5.6
365 2 442.50 152.44 5.6
365 2 365.00 152.44 5.6
150 2 150.00 152.44 5.6
365 2 442.50 152.44 5.6
365 2 365.00 152.44 5.6
4.66 3 36477.00 281.89 5.68
5.68 2 487.50 152.44 5.6
5.68 2 535.00 152.44 5.6
365 2 365.00 152.44 5.6
150 2 150.00 152.44 5.6
365 2 365.00 152.44 5.6
365 2 520.00 152.44 5.6
468
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at
Village Morraiya in Changodar Industrial Area
RECAPITULATION SHEET
Road A
Road A
J
22116050.4009524
39248202.12
J
24306885.36 -8293868.570
792657.70 742657.70
Artoprint 1282500
Inkptech 512850 4888550
pharmatech 1693200 335000
skap 1100000 535000
Virgo 500000 150000
Rajeshwari 322650 200000
Macons 300000 500000
Kalpvijay 1500000 1720000
Synidate 256350 10377800
microcamp 256350
remica 256350
snehraj 256350
Microprinting 210600
Microtech 210600
J
8657800
J
2224.955
2224.955
2224.955
J
id flag
get 2
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at Village Morraiya in
Changodar Industrial Area
Taluka : Sanand Dist. : Ahmedabad
Sub Estimate- 1 Earthwork
ABSTRACT-1
Sr.N Quantity Item Rate Per Amount
o.
1 2 4 5 6 7
Clearing and grubbing of road toe length
up to end of the the earthwork in required
length including uprooting vegetation
grass bush shurbs saptings and trees of
1 0.760 grith upto 300mm removed of stumps 31701.91 Hect 24334.38
disposal of unserviceable materials up to
100 mt from road boundary as per MOST 317.02
specification Clause 201 in (a) Area of
thick jungle with JCB as directed by 32018.93
Engineer in charge.
2 8201.52 Box cutting the road surface to proper 64.74 CUM. 536297.39
slope and camber for making a base for
road work incl. removing the excavated 0.65
stuff and depositing on the road side slope 65.39
as directed upto 50 Mt. lead
As Per RA
3 586.85 Providing and laying cement concrete 1:4:8 2008.20 cum 1190296.11
(1 cement : 4 coarse sand : 8 Machine
Cum crushed Stone Aggregates 40 mm nominal 20.08
size) and curing etc complete excluding 2028.28
cost of form work in (A) Foundation &
Plinth. RA
As Per RA
4 2167.20 Providing and Casting in situ controlled 3934.79 cum 8612756.20
Cement Concrete M-200 for R.C.C. Raft
cum and cutt-off walls including necessary 39.35
shuttering laying, vibrating, ramming and 3974.14
curing complete.
9 50.00 Providing and Laying RCC M-150 for Utility 1300.00 No. 65650.00
pipe Kundi including all Material and
No. Labour including form work watering as 13.00
per drawing as directed. 1313.00
As Per RA
10 98.00 Providing and casting in situ Ordinary 3202.97 cum 317030.00
cement concrete M 150 for R.C.C. Raft and
cum cut off walls including necessary 32.03
shuttering, laying, vibrating, ramming and 3235.00
curing complete.
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at Village Morraiya in
Changodar Industrial Area
Taluka : Sanand
Dist. : Ahmedabad Road Furnishing
ABSTRACT-3
Sr.No. Quantity Item RATE Per Amount
2 0.00 Structure and Foundation : Providing & fixing portal 150000.00 No 0.00
mounted gantry Structure Mfg.Supplying and
No hoisting complete in position of welded structure of 1500.00
M.S Pipe conforming to IS specifications for over
head signs comprising of two vertical post 6 151500.00
mtrs.height for the top on RCC foundations made of
300 mm dia M.S pipe as verticals & horizontal span
made of 80 mm .40mm and 25mm dia pipe ( all
medium weight ) along with 12mm M.S plates of
required size with stiffener 10 mm M.S plate with
one coat of steel primer and two coat of enamel
paint including foundation work with all work like
Excavation ,PCC,RCC,Back filling of excavated earth
and other things as per drawing and also directed by
engineer in charge. Size of Structure : 15000 x 2100
mm ( Details as Per drawing ) . GANTRY SIGN
BOARDS : Supply and fixing high intensity type retro
reflective sign plate made out of 2mm thick
aluminium sheet duly framed by M.S angle 40 x 40 x
5 mm and additional vertical bracing at every 1.20
mtr.back side of plate is painted in two coats of
epoxy grey paint after etching treatment of plate on
back side of plate .The front face is to be covered
with Green High intensity grade retro reflective
sheeting & the matter and logo with white retro
reflective sheeting as per IRC Standard .This plate is
to be fixed on over head structure with the help of
G.I Nut bolts complete.in all respects as per
drawing ,Technical Specification Clause 801,802 &
Direction of the Engineer in charge.
SIZE OF SIGN BOARDS : 1500 x 2100 mm ( Details
per drawing ) (MR)
3 218.00 Supplying and fixing CATS EYE made out of ASA 372.00 No 81906.96
styrene acrolonitrile ) injuction high
No compressed moulding with reflector cube 3.72
corner reflector design filled with tightly 375.72
adhering polting compound as per ASTMD 788
size 11.5 cm x 7 cm x 1.6 cm providing with
bitumenous adhesive with each unit for fixing
High Intensity Grade. Sor I .No 26163 Page
no.57
4 420 Road Marking with hot applied Thermoplastic 296.40 Sqmt 125731.20
compound with reffectorising glass beads on
Sqmt bituminous surface. Providing & laying of hot 2.96
applied thermoplastic compound 2.5mm thick 299.36
including reffectorising glass beads @ 250 gms
per sqmt area, thickness of 2.5mm is exclusive
of surface applied glass beads as per IRC 35.
The finished surface to be level uniform and
free from streaks and holes. Sor Page No.57
I.No 26161
6 2016.00 Providing and fixing pre cast Rubble dye 908.80 Sqm 1850466.24
inter locking concrete block 60 mm thick
Sqm with grade concrete M 350 pnumatic 9.09
compressed by machanically pressed and 917.89
as per approved design including 75 mm
sand layer for levelling and filling the joint
with sand in proper line and level etc.
completed.It No.14034+(50x4.756) Pg
No.191
7 151.20 Providing and laying cement concrete 1:4:8 2008.20 Cum 306675.93
( Below Paver Block) (1 cement : 4 coarse
Cum sand : 8 Machine crushed Stone 20.08
Aggregates 40 mm nominal size) and 2028.28
curing etc complete excluding cost of form
work in (A) Foundation & Plinth. RA
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at Village Morraiya in
Changodar Industrial Area
Taluka : Sanand
Dist. : Ahmedabad C. C Road
ABSTRACT-4
Item No 1 Clearing and grubbing of road toe length up to end of the the earthwork in required
length including uprooting vegetation grass bush shurbs saptings and trees of grith upto
300mm removed of stumps disposal of unserviceable materials up to 100 mt from road
boundary as per MOST specification Clause 201 in (a) Area of thick jungle with JCB as
directed by Engineer in charge.
Item No. 2 Box cutting the road surface to proper slope and camber for making a base for road work
incl. removing the excavated stuff and depositing on the road side slope as directed upto
50 Mt. lead
Box cutting for Road A= 520 m , Road B= 510 m and Road c= 510 m
Box cutting for Road D= 250 m , Road E= 250 m and Road F= 250 m , G = 220m
Item No. 3 Earthwork for embankment including breaking clods, dressing with all lead and lift and
including watering rolling and consolidation of subgrade in layers at O.M.C. to required dry
density including filling the depression which occur during the process using power roller
8T to 10T.(C) From Borrow area within 1.0KM. lead
Item No 2 Collecting , carting, Stacking , Spreading, and levelling coarse sand of 100mm thick
compacted layer including watering uo to OMC, rolling, and consolidation with vibratory
roller etc as directed.
Total = 43344.00 Kg
Item No 6 Supplying and fixing reinforced concrete heavy duty non-pressure pipes with collars for
culverts carrying heavy traffic as per IS 458-1991 specifications including setting the pipes in
C.M. 1:2 watering and laying (to level or slopes) of class NP3 of following internal
daimeters.(v) 900 mm dia.
At Factory Gate
20 X 15.0 = 300.00 Rmt
At Junction Crossing
1 X 4.0 X 10.00 = 40.00 Rmt
Total = 340.00 Rmt
Item No 7 Supplying and fixing reinforced concrete heavy duty non-pressure pipes with collars for
culverts carrying heavy traffic as per IS 458-1991 specifications including setting the pipes in
C.M. 1:2 watering and laying (to level or slopes) of class NP3 of following internal
daimeters.(ii) 450mm dia.
1 X 200 / 30 = 6.6666667 No
Say = 7 N0
Item No 9 Providing and Laying RCC M-150 for Utility pipe Kundi including all Material and Labour
including form work watering as per drawing as directed.
Total = 50.00 No
Item No 10 Providing and casting in situ Ordinary cement concrete M 150 for R.C.C. Raft and cut off
walls including necessary shuttering, laying, vibrating, ramming and curing complete.
Item No 2 Structure and Foundation : Providing & fixing portal mounted gantry Structure
Mfg.Supplying and hoisting complete in position of welded structure of M.S Pipe conforming
to IS specifications for over head signs comprising of two vertical post 6 mtrs.height for the
top on RCC foundations made of 300 mm dia M.S pipe as verticals & horizontal span made
of 80 mm .40mm and 25mm dia pipe ( all medium weight ) along with 12mm M.S plates of
required size with stiffener 10 mm M.S plate with one coat of steel primer and two coat of
enamel paint including foundation work with all work like Excavation ,PCC,RCC,Back filling of
excavated earth and other things as per drawing and also directed by engineer in charge.
Size of Structure : 15000 x 2100 mm ( Details as Per drawing ) . GANTRY SIGN BOARDS :
Supply and fixing high intensity type retro reflective sign plate made out of 2mm thick
aluminium sheet duly framed by M.S angle 40 x 40 x 5 mm and additional vertical bracing at
every 1.20 mtr.back side of plate is painted in two coats of epoxy grey paint after etching
treatment of plate on back side of plate .The front face is to be covered with Green High
intensity grade retro reflective sheeting & the matter and logo with white retro reflective
sheeting as per IRC Standard .This plate is to be fixed on over head structure with the help of
G.I Nut bolts complete.in all respects as per drawing ,Technical Specification Clause 801,802
& Direction of the Engineer in charge.
SIZE OF SIGN BOARDS : 1500 x 2100 mm ( Details per drawing ) (MR)
= 0 Nos.
Item No 3 Supplying and fixing CATS EYE made out of ASA styrene acrolonitrile ) injuction high
compressed moulding with reflector cube corner reflector design filled with tightly adhering
polting compound as per ASTMD 788 size 11.5 cm x 7 cm x 1.6 cm providing with
bitumenous adhesive with each unit for fixing High Intensity Grade. Sor I .No 26163 Page
no.57
= 10 Nos.
Say = 10 Nos.
Item No 6 Providing and fixing pre cast Rubble dye inter locking concrete block 60 mm thick with grade
concrete M 350 pnumatic compressed by machanically pressed and as per approved design
including 75 mm sand layer for levelling and filling the joint with sand in proper line and
level etc. completed.It No.14034+(50x4.756) Pg No.191
Item No 7 Providing and laying cement concrete 1:4:8 ( Below Paver Block) (1 cement : 4 coarse sand :
8 Machine crushed Stone Aggregates 40 mm nominal size) and curing etc complete
excluding cost of form work in (A) Foundation & Plinth. RA
Rate Analysis
Collecting , carting, Stacking , Spreading, and levelling coarse sand of 100mm
thick compacted layer including watering uo to OMC, rolling, and consolidation
with vibratory roller etc as directed.
302.54 (a)
( B ) labour & machinary
Per
Spreading the
Coarse Sand
1 0 cmt 0.00
( It.No.26.20)
Consolidation etc.
1 40 cmt 40.00
comp. (26118B)
40.00 (b)
Item No: 1
Clearing and grubbing of road toe length up to end of the the earthwork in required length
including uprooting vegetation grass bush shurbs saptings and trees of grith upto 300mm
removed of stumps disposal of unserviceable materials up to 100 mt from road boundary
as per MOST specification Clause 201 in (a) Area of thick jungle with JCB as directed by
Engineer in charge. As per ra.
Sr. Item Gr.I B.T. Metal M.C metal Murrum Grit Stone Dust GSB Quarispal Sand
No. 45 to 90 mm 45 to 63 mm 6mm to 10mm
Km Rate Km Rate Km Rate Km Rate Km Rate Km Rate Km Rate Km
1 Cost of material at 173.00 293.00 64.00 274.00 105.00 126.00 84.00
2 Conveyance charges
3 -do- Further l 110 x 6.03 110 x 6.03 110 x 5.60 110 5.60 110 x 5.60 110 x 5.60 0
Km = Rs. 663.30 Km = Rs. 663.30 Km Rs. 616.00 Km 616.00 Km= Rs. 616.00 Km Rs. 616.00 Km
Total Rs. 952.15 Rs. 1072.15 Rs. 170.54 Rs. 996.54 827.54 Rs. 848.54 Rs. 806.54
Km 106.54 5 Km 106.54
194.50 93.36
196.30 392.60
194.50 1945.00
1545.00 9270.00
520.00 15600.00
245.00 2940.00
300.00 1500.00
0 0.00
1072.15 77194.80
827.54 19860.96
20.00 360.00
4,761.14
133,917.86
446.39
Executive Engineer
Panchayat (R&B) Division
Providing laying , spreading and compacting graded stone agg to Wet Mix Macadam 150 mm thick as per MORT & H specification
including premixing the material with water at OMC carriage of mixed material by tippers to site , laying in uniform layers with
paver in sub base / base course on well prepared surface and compacting with Vibratory Roller 80 to 100 KN static weight to
achieve the desire density..
Cost for ------ 100.00 Cmt.
No. Item Qty. Unit Rate Amount
[A] Labour
Mate 0.40 x Day 278.40 = 111.36
Mazdoor Skilled 2.00 x Day 278.40 = 556.80
Mazoodr 8.00 x Day 278.40 = 2227.20
Total 2895.36 [A]
[B] Machinery
Wet mix plant of 75 TpH capacity 4.00 x Hour 900.00 = 3600.00
Front end loader 1 Cum capacity 4.00 x Hour 520.00 = 2080.00
Mortor Graders 2.00 x Hour 1545.00 = 0.00
Paver Finisher 6.00 x Hour 629.00 = 0.00
Water Tanker 1.33 x Hour 300.00 = 399.00
Tipper 5.00 x Hour 200.00 = 1000.00
Vibratory roller 6.25 x Hour 994.00 = 6212.50
add 10 % of cost of carriage to cover cost of loading & unloading = 100.00
Total = 13391.50 [B]
[C] Material
[1] M/c B.T. Metal 22.4 To 53 mm @ - 30.00% = 39.60 x CUM 1072.15 = 42457.14
[2] M/c B.T. Kapchi 11.2 To 22.4 mm @ 20.00% = 26.40 x CUM 1173.54 = 30981.46
[3] M/c B.T. Grit 2.36 To 11.2 mm @ - 27.50% = 36.30 x CUM 1081.04 = 39241.75
[4] Stone Dust below 2.36 mm size @ - 22.50% = 22.50 x CUM 788.54 = 17742.15
Total loose Volume = 124.80
[5] Water 8.00 x KL 25.00 = 200.00
Total = 130622.50 [C]
Particula
Sr. No. Qty Rate Per Amount
r
A Material cost (R.A) 1 848.54 Cmt 848.54
Deduct
Labour
charges
D for Filling
Boxes
980.69 Rs / Cmt.
Taluka : Sanand
Dist. : Ahmedabad
Providing Hard side Solder of 150 mm thick for emabankment using
Item quarry spall with all lead and lift and including watering and rolling and
No :- 7 consolidation of subgrade in layers at OMC to required dry density
including filling the depressions which occur du
Item No.1 Providing & laying 37.5mm thick Bituminous macadam with VG-10 bitumen for tack coat @
4.0 kg / 10 smt. and using B.T. stone aggregate as per required gradation with asphalt of
VG-10 at the rate of 3.40 % i.e. 34.0 Kg/ M.T. by weight mix including heating & mixing in
drum mix plant transporting the mix spreading the same by paver finisher and consolidation
by vibratory roller as per MORT&H specification including cost of all materials fuel, labours,
tools and plant etc using contractors own drum mix plant etc. comp.
Cost of aggregate
No. Material Qty. Rate Per Amount
1 Kaptchi 19.20 to 26.5 mm 0.0330 1126.04 Cum. 37.15
2 Kaptchi 13.20 to 19.2 mm 0.1518 1173.54 Cum. 178.14
3 Grit 4.75 to 13.20mm 0.3036 1081.04 Cum. 328.20
4 Grit 2.36 mm to 4.75mm 0.0990 1003.54 Cum. 99.35
5 Stone dust 0.075 to 2.36mm 0.0726 788.54 Cum. 57.24
0.6600 Cum. 700.08
( B ) COST OF ASPHALT
Asphalt for tack coat
Asphalt for tack coat, one M.T. mix covers 9.09090909 Sq.mt.
A+B+C=
Item No.2 Providing & laying 37.50mm thick Bituminous macadam with VG-10 bitumen for tack coat
@ 2.5 kg / 10 smt. and using B.T. stone aggregate as per required gradation with asphalt of
VG-10 at the rate of 3.40 % i.e. 34.0 Kg/ M.T. by weight mix including heating & mixing in
drum mix plant transporting the mix spreading the same by paver finisher and consolidation
by vibratory roller as per MORT&H specification including cost of all materials fuel, labours,
tools and plant etc using contractors own drum mix plant etc. comp.
Cost of aggregate
No. Material Qty. Rate Per Amount
1 Kaptchi 19.20 to 26.5 mm 0.0330 1126.04 Cum. 37.15
2 Kaptchi 13.20 to 19.2 mm 0.1518 1173.54 Cum. 178.14
3 Grit 4.75 to 13.20mm 0.3036 1081.04 Cum. 328.20
4 Grit 2.36 mm to 4.75mm 0.0990 1003.54 Cum. 99.35
5 Stone dust 0.075 to 2.36mm 0.0726 788.54 Cum. 57.24
0.6600 Cum. 700.08
( B ) COST OF ASPHALT
Asphalt for tack coat
Asphalt for tack coat, one M.T. mix covers 12.12 Sq.mt.
A+B+C=
Item No.3 Providing & laying 20mm thick premix seal surfacing using specified graded machine crushed
aggregates with VG-10 grade bitumen at the rate of 5.1 % i.e. 51.0 Kg/ M.T. by weight mix
including heating & mixing in drum mix plant transporting the mix spreading the same by
paver finisher and consolidation by vibratory roller as per MORT&H specification including
cost of all materials fuel, labours, tools and plant etc. comp. and flushind sand @ rate of
0.30 cmt / 100 smt.
( A ) Cost of aggregate
No. Material Qty. Rate Per Amount
1 Grit ( 5.60mm to 11.20 mm) 0.198 1081.04 Cum. 214.04
2 Grit ( 2.80mm to 5.60 mm) 0.290 1003.54 Cum. 291.02
5 Stone dust 0.075 to 2.36mm 0.172 788.54 Cum. 135.62
0.660 Cum. 640.68
1000 51.00 Kg
5.10 x
100
Now cost of asphalt = 39769.77 x 51.00
------------------------------ = 2028.26
1000
Say Rs. 2028.26 ( B )
( C ) Labour charges 468.00 ( C )
Kg....( ii )
12.12121
Kg....( ii )
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at
Village Morraiya in Changodar Industrial Area
Taluka : Sanand
Dist. : Ahmedabad SEMI DENSE BITUMINOUS CARPET
RATE ANALYSIS
Item No.1 Providing & laying 25 mm thick semi dense Bituminous carpet using B.T. stone chips
as per MORT&H gradation and specifications using asphalt for tackcoat at
the rate of 2.5 kg/10 sq. mt. on BT surface and the asphalt (80/100) at the
rate of 5 % (i.e 50 Kg) by weight of total mix and mixing aggregate and
asphalt in continuous batching of Drum Mix Plant and spreading the same
by paver finisher including rolling and consolidation with power roller (80 to
100 KN static weight ) and flushing sand / stone dust @ rate 0.30 cum /100
sqm of road surface including tools & plants , fire wood, oil, kerosene,
labour charges using contractor's own machineries etc.complete.
Kg....( ii )
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at
Village Morraiya in Changodar Industrial Area
Taluka : Sanand
Dist. : Ahmedabad Bituminous GROUT BASE
RATE ANALYSIS
Item No.1 Providing & laying 50.00mm thick Bituminous grout base course with asphalt 80/100 for
tack coat @ 4.00 Kg./ 10 Sqmt WBM surface and using B.T. stone
aggregate as per required gradation with asphalt of 80/100 grade at the rate
of 1.99% i.e. 19.90 Kg/ M.T. by weight mix including heating & mixing in drum
mix plant transporting the mix spreading the same by paver finisher and
consolidation by vibratory roller as per MORT&H specification including cost
of all materials fuel, labours, tools and plant etc using contractors own drum
mix plant etc. comp.
Item No.1 Providing & laying 37.50mm thick Bituminous grout base course with asphalt 80/100 for
tack coat @ 2.98 kg./ 10 Sqmt WBM surface and using B.T. stone
aggregate as per required gradation with asphalt of 80/100 grade at the rate
of 1.99% i.e. 19.90 Kg/ M.T. by weight mix including heating & mixing in drum
mix plant transporting the mix spreading the same by paver finisher and
consolidation by vibratory roller as per MORT&H specification including cost
of all materials fuel, labours, tools and plant etc using contractors own drum
mix plant etc. comp.
Item No.1 Providing & laying 37.50mm thick Bituminous grout base course with asphalt 80/100 for
tack coat @ 4.00 kg./ 10 Sqmt WBM surface and using B.T. stone
aggregate as per required gradation with asphalt of 80/100 grade at the rate
of 1.99% i.e. 19.90 Kg/ M.T. by weight mix including heating & mixing in drum
mix plant transporting the mix spreading the same by paver finisher and
consolidation by vibratory roller as per MORT&H specification including cost
of all materials fuel, labours, tools and plant etc using contractors own drum
mix plant etc. comp.
Kg....( ii )
Kg. ...( i )
Kg....( ii )
Kg. ...( i )
Kg....( ii )
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at
Village Morraiya in Changodar Industrial Area
Taluka : Sanand
Dist. : Ahmedabad Carpet
RATE ANALYSIS
Item No.2 Providing and laying 25 mm thick premix asphalt carpet using 0.66 cmt per 1 MT.mix with
M.C. stone agg. & asphalt for tack coat @ rate of 2.5 kg / 10 smt. & using asphalt 33.60
kg .ie. 3.36 % mixing by D.M.P. & spreading the same by paver finisher with vibratory
roller 80 to 100 KN. static wt. incl. providing all equipments tools and plants, fire wood, oil,
kerosene, labour charges etc. complete with contractor's own machineries, drum mix
plant, paver finisher etc. complete by the contractor.
Cost of aggregate
( B ) COST OF ASPHALT
Asphalt for tack coat
Asphalt for tack coat, one M.T. mix covers 19.05 Sq.mt.
A+B+C=
Item No.3 Providing and laying bitumenous 0.18 cmt / 10 smt. seal coat with machine crushed
aggregate using 45.0 kg. of bitumen VG-10 per M.T. of mixed agg. ( 4.50 % ) mixing by
batching continous by H.M.P. and spreading the same by paver finisher and
consolidation by vibratory roller incl. providing all equipment by contractor and flushind
sand @ rate of 0.30 cmt / 100 smt.
( A ) Cost of Aggregate
No. Material Qty. Rate Per Amount
1 6 mm grit 0.60 1003.54 Cum. 602.12
2 Stone dust 0.06 788.54 Cum. 47.31
0.66 649.44
( i ) .... 649.44
For one M.T. mix
649.44 x ( 1000 - 45.00 ) = Rs. 620.210
1000
Say Rs. 620.21 ( A )
A+B+C=
Kg....( ii )
Kg....( ii )
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at Village Morraiya in Changodar
Industrial Area
Taluka : Sanand Dist. : Ahmedabad
RATE ANALYSIS
Ref. to
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Spec.
6.1 601 Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub-
base over a prepared sub-grade with coarse and
fine aggregate conforming to IS: 383, the size
of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as per
table 600-1, cement content not to be less than
220 kg/ cum, optimum moisture content to be
determined during trial length construction,
concrete strength not to be less than 10 Mpa at
7 days, mixed in a batching plant, transported
to site, laid with a fixed form paver or
conventional method, compacting with 8-10
tonnes vibratory roller, finishing and curing
etc. complete.
Unit = cum
Taking output = 450 cum (990 tonne)
a) Labour
Mate day 1.12 278.40 311.81
Mazdoor skilled day 6.00 278.40 1670.40
Mazdoor day 22.00 278.40 6124.80
8107.01
b) Machinery
Front end loader 1 cum bucket capacity hour 6.00 520.00 3120.00
Cement concrete batch mix plant @ 30 hour 6.00 1440.00 8640.00
cum per hour
Electric generator 100 KVA hour 6.00 450.00 2700.00
Fixed Form Paver hour 6.00 629.00 3774.00
Vibratory roller 8-10 t capacity hour 8.00 994.00 7952.00
Water tanker6 KL capacity hour 8.00 200.00 1600.00
Tipper tonne.km 990 x 35 1.74 60291.00
Unit = cum
Taking output = 913 cum (2100 tonne)
(830.0 * 5.50 * 0.20)
a) Labour
Mate day 2.00 194.50 389.00
Mazdoor skilled day 15.00 194.50 2917.50
Mazdoor day 35.00 194.50 6807.50
b) Machinery
Road Sweeper @ 1250 sqm per hour hour 2.80 230.00 644.00
Front end loader 1 cum bucket capacity hour 18.00 520.00 9360.00
Cement concrete batch mix plant @ 30 hour 6.00 1440.00 8640.00
cum per hour
Electric generator 250 KVA hour 6.00 450.00 2700.00
Fixed form paver hour 6.00 629.00 3774.00
Water tanker6 KL capacity hour 36.00 300.00 10800.00
Transit truck agitator 5 cum capacity. tonne.km 2100x35 5.22 383670.00
Item No 2 Providing and casting in site ordinary cement concrete m-300 for average 200 mm thick
as directed including compacting with surface mechanical screed vibrating,mechanical
floater,chennaling form work and grooving including filling asphalt filer joint including
dowel bar ,tie bar expansion,construction and contruction joint as per ibsruction
engineer in charge.
(ii) For Vaccum dewatering system incl. using vaccum dewatering machine,
mechanical vibrator, mechanical floaters & mechanical trovel for finishing
Rate for this item Rs. 40.00 / Sqmt for 150 mm thick
Item - 1 Providing and laying cement concrete 1:4:8 ( Below Paver Block) (1 cement : 4 coarse sand : 8
Machine crushed Stone Aggregates 40 mm nominal size) and curing etc complete excluding
cost of form work in (A) Foundation & Plinth. RA
RATE ANALYSIS
Item No.1
Providing and Laying RCC M-150 for Utility pipe Kundi including all Material and Labour i
work watering as per drawing as directed.
Providing and laying Cement Concrete 1 : 4 : 8 hand Broken stone aggregates ( 40 mm nomi
curing complete excluding cost of form work (A) Foundation & Plinth
Providing and laying Cement Concrete 1 : 2 : 4 ( 1 Cement : 2 Coarse Sand : 4 Gradded sto
mm nominal size and curing complete excluding cost of form work (A) Foundation Base of
Concrete.
Total Cost A + B + C +
43.55 + 80.19 + 831.75 +
Say =
t Village Morraiya in
0.51 Cum
43.55 Rs . A
0.04 Cum
80.19 Rs . B
0.04225 Cum
0.169 Cum
0.04225 Cum
0.25000 Cum
831.75 Rs C
nt (I.S.I. Mark) for following items
d drawing.
7.5 Kg
7.5 Kg
331.58 Rs D
D
331.58 1287.07
1300.00 Rs./No.
Name of Work:- Constructing C.C. Road in Mahagujarat Industrial Estate at
Village Morraiya in Changodar Industrial Area
Taluka : Sanand
Dist. : Ahmedabad
Sr.No. No. of CD Chianage Proposed pipe No. of rows Prop . Length of Rate
dia. MM pipe Total
Total 412345.89
Hydrolic calculation for H.P drain
Hydrolic calculation for 3 Raw H.P. Drain
= 1.90755 Sq. mt
NAME OF WORK:
Details of H.P Drain
Sr.No C.D.No. Location of Proposed No. of Existing Prop . G.L F.R.L Differenc Width of Length Length
. Pipe culvert pipe dia. MM rows pipe length Length of e of F.R.L Craddle of Head of head
KM. pipe - G.L wall wall
2/400 900 3 0.000 7.500 98.300 100.00 1.70 4.90 10.00 10.00
C.D No chainage
H.P.Drain (C.D.Works)
MEASUREMENT SHEET
Item No.1 EXCAVATION for foundation upto 1.50 Mt. ....... Loose or Soft soil.
Head wall
2 x 10.30 X 1.70 X 1.20 = 42.02 cum.
Below craddle pipe
1 x 4.10 x 4.90 x 0.45 = 9.04 cum
Item No.2 Providing and laying cement concrete 1:3:6 ... including cost of formwork
Head wall
2 x 10.30 X 1.70 X 0.20 = 7.00 cum.
Item No.3 Providing and laying cement concrete 1:2:4 ..... including cost of formwork
but excluding the cost of reinforcement.
2 x 10.00 X 0.45 + 1.40 X 2.90 = 53.65 cum.
2
For Craddle
2 x 4.90 X 0.45 X 1.25 = 5.51 cum.
Head wall
6 x 0.785 x 1.1 x 1.1 x 0.93 = 5.32 Cum
Net 60.48
Say 60.50 Cum
Item No.4 ying and fixing reinforced concrete heavy duty non pressure pipes of
I.S class NP-3
900 mm dia. = 22.50 Rmt
Item No.5 Numbering the C.D.work with approved paint including all materials for paintings
151.20
Say 151.20 Kgs
Item No.7 Providing and filling sand below R.C.C. raft in layers incl. ramming & watering
For 900 mm dia. Pipe and 1200 mm. Dia.
Deduction
Less for pipe
3 X 5.28 X 0.785 1.1 1.1 = 15.06 cum.
Net 25.07
Say 26.0 cum.
Item No.8 Providing Weephole ----
35.1
Say 36 No.
Height Base of Base Widi
of head head of ng
wall wall head 2/1
wall side
2 7.00 Cum. Providing and filling in 3344.00 33.44 3377.44 Cum 23655.59
foundation with
ordinary cement
concrete M 100 mix
and providing
necessary vertical pin
headers including
formwork,vibrating,ra
mming and curing
complete( Br SOR I.N.
12)
3 60.50 Cum. Providing and filling in 4953.00 49.53 5002.53 Cum 302653.07
foundation with
ordinary cement
concrete M 150 mix
and providing
necessary vertical pin
headers including
formwork,vibrating,ra
mming and curing
complete(SOR I.N. 12
+ 2*215)
4 22.50 Rmt Supplying and fixing 2754.00 27.54 2781.54 Rmt. 62584.65
reinforced concrete
heavy duty non
pressure pipes with
collars for culverts
including setting and
jointing the pipes in
cm 1:2 watering and
laying (To level of
slope ) of I.S class
NP-3 of following
internal diameters. in
mm
(Cl S.O.R. I.N.26.105.
IV) : 900 dia.
900
5 2.00 Nos. Numbering the 53.00 0.53 53.53 No. 107.06
C.D.work with
approved paint
including all materials
for paintings etc.
complete.
( Cl SOR I.N.86.0.0)
7 26.00 Cm. Providing and filling 360.00 3.60 363.60 Cm. 9453.60
sand below R.C.C. raft
in layers including
ramming 7 watering
complete.
(Bridge SOR I.No-16.)
8 36.00 Nos. Providing and laying 36.00 0.36 36.36 Nos 1308.96
weep hole in
abutment and
returning by using
A.C. pipes of 100mm
diameter including
laying in proper
grade and jointing
etc. complete as per
detailed specifications.
( Br SOR I.N. 50.A)
Total Rs 412345.89
Deputy
R&B Ex.Engineer
Panchayat Sub Executive Engineer
Division R&B Panchayat Division
Dholka Ahmedabad
Hydrolic calculation for H.P drain
Hydrolic calculation for 4 Raw H.P. Drain
= 2.5434 Sq. mt
NAME OF WORK:
Details of H.P Drain
Sr.No C.D.No. Location of Propose No. of Existing pipe Prop . G.L F.R.L Differenc Width of Length of Length Height Base
. Pipe culvert d pipe rows length Length of e of Craddle Head of head of of
KM. dia. MM pipe F.R.L - wall wall head head
G.L wall wall
2 31-Dec 12/400 900 4 0.000 7.500 98.40 100.00 1.60 6.50 11.30 11.30 2.80 1.38
C.D No chainage
H.P.Drain (C.D.Works)
MEASUREMENT SHEET
Item No.1 EXCAVATION for foundation upto 1.50 Mt. ....... Loose or Soft soil.
Head wall
2 x 11.60 X 1.70 X 1.20 = 47.33 cum.
Below craddle pipe
1 x 4.10 x 6.50 x 0.45 = 11.99 cum
Item No.2 Providing and laying cement concrete 1:3:6 ... including cost of formwork
Head wall
2 x 11.60 X 1.70 X 0.20 = 7.89 cum.
Item No.3 Providing and laying cement concrete 1:2:4 ..... including cost of formwork
but excluding the cost of reinforcement.
2 x 11.30 X 0.45 + 1.40 X 2.80 = 58.53 cum.
2
For Craddle
2 x 6.50 X 0.45 X 1.25 = 7.31 cum.
Net 67.64
Say 67.70 Cum
Item No.4 ng and fixing reinforced concrete heavy duty non pressure pipes of
I.S class NP-3
900 mm dia. = 30.00 Rmt
Item No.5 Numbering the C.D.work with approved paint including all materials for paintings
169.11
Say 169.10 Kgs
Item No.7 Providing and filling sand below R.C.C. raft in layers incl. ramming & watering
For 900 mm dia. Pipe and 1200 mm. Dia.
Deduction
Less for pipe
4 X 5.35 X 0.785 1.1 1.1 = 20.33 cum.
Net 33.57
Say 34.0 cum.
Item No.8 Providing Weephole ----
37.3
Say 38 No.
Base Widing
of 2/1 side
head
wall
1.40 2
H.P. DRAIN
ABSTRACT
chainage 0 Cd No. --
Item Quantity. Item of work Tendered Rate Unit Amount.
No.
Rate 1% L.C. Total
1 59.32 Cum. EXCAVATION for 82.00 0.47 82.47 Cum 4891.87
foundation upto
1.50 Mt. depth
including sorting out
and stacking of
useful materials and
disposing of the
excavated stuff
upto 50 Meter lead.
Loose or Soft soil.
(Rd & cl ch 26/75/00)
2 7.89 Cum. Providing and filling in 3344.00 23.18 3367.18 Cum 26560.32
foundation with
ordinary cement
concrete M 100 mix
and providing
necessary vertical pin
headers including
formwork,vibrating,ra
mming and curing
complete( Br SOR I.N.
12)
3 67.70 Cum. Providing and filling in 4953.00 27.48 4980.48 Cum 337178.50
foundation with
ordinary cement
concrete M 150 mix
and providing
necessary vertical pin
headers including
formwork,vibrating,ra
mming and curing
complete(SOR I.N. 12
+ 2*215)
4 30.00 Rmt Supplying and fixing 2754.00 0.47 2754.47 Rmt. 82633.95
reinforced concrete
heavy duty non
pressure pipes with
collars for culverts
including setting and
jointing the pipes in
cm 1:2 watering and
laying (To level of
slope ) of I.S class
NP-3 of following
internal diameters. in
mm
(Cl S.O.R. I.N.26.105.
IV) : 900 dia.
900
5 2.00 Nos. Numbering the 53.00 1.00 54.00 No. 108.00
C.D.work with
approved paint
including all materials
for paintings etc.
complete.
( Cl SOR I.N.86.0.0)
7 34.00 Cm. Providing and filling 360.00 4.02 364.02 Cm. 12376.68
sand below R.C.C. raft
in layers including
ramming 7 watering
complete.
(Bridge SOR I.No-16.)
8 38.00 Nos. Providing and laying 36.00 1.32 37.32 Nos 1418.27
weep hole in
abutment and
returning by using
A.C. pipes of 100mm
diameter including
laying in proper
grade and jointing
etc. complete as per
detailed specifications.
( Br SOR I.N. 50.A)
Total Rs 476639.32
Deputy Ex.Engineer Executive Engineer
R&B Panchayat Sub Division R&B Panchayat Division
Viramgam Ahmedabad
Hydrolic calculation for H.P drain
Hydrolic calculation for 2 Raw H.P. Drain
= 1.57 Sq. mt
NAME OF WORK:
Details of H.P Drain
Sr.No. C.D.No. Location of Proposed No. of rows Existing pipe Prop . G.L F.R.L Difference of Width of Length of Length Height Base Base Widing
Pipe culvert pipe dia. MM length Length of F.R.L - G.L Craddle Head wall of head of head of of 2/1
KM. pipe wall wall head head side
wall wall
10/100 0 1000 2 0 7.5 98.3 100 1.70 3.50 8.60 8.60 2.90 1.42 1.40 2
C.D No chainage
H.P.Drain (C.D.Works)
MEASUREMENT SHEET
Item No.1 EXCAVATION for foundation upto 1.50 Mt. ....... Loose or Soft soil.
Head wall
2 x 8.90 X 1.70 X 1.20 = 36.31 cum.
Below craddle pipe
1 x 4.10 x 3.50 x 0.45 = 6.46 cum
Item No.2 Providing and laying cement concrete 1:3:6 ... including cost of formwork
Head wall
2 x 8.90 X 1.70 X 0.20 = 6.05 cum.
Item No.3 Providing and laying cement concrete 1:2:4 ..... including cost of formwork
but excluding the cost of reinforcement.
2 x 8.60 X 0.45 + 1.40 X 2.90 = 46.14 cum.
2
For Craddle
2 x 3.50 X 0.45 X 1.35 = 4.25 cum.
Head wall
4 x 0.785 x 1.2 x 1.2 x 0.93 = 4.22 Cum
Net 51.13
Say 51.20 Cum
Item No.4 Supplying and fixing reinforced concrete heavy duty non pressure pipes of
I.S class NP-3
1000 mm dia. = 15.00 Rmt
Item No.5 Numbering the C.D.work with approved paint including all materials for paintings
127.83
Say 127.80 Kgs
Item No.7 Providing and filling sand below R.C.C. raft in layers incl. ramming & watering
For 900 mm dia. Pipe and 1200 mm. Dia.
Deduction
Less for pipe
2 X 5.28 X 0.785 1.2 1.2 = 11.94 cum.
Net 18.57
Say 19.0 cum.
Item No.8 Providing Weephole ----
30.2
Say 31 No.
H.P. DRAIN
ABSTRACT
chainage 0 Cd No. --
Item Quantity. Item of work Tendered Rate Unit Amount.
No.
Rate 1% L.C. Total
1 42.77 Cum. EXCAVATION for 82.00 0.47 82.47 Cum 3526.99
foundation upto
1.50 Mt. depth
including sorting out
and stacking of
useful materials and
disposing of the
excavated stuff
upto 50 Meter lead.
Loose or Soft soil.
(Rd & cl ch 26/75/00)
2 6.05 Cum. Providing and filling in 3344.00 23.18 3367.18 Cum 20378.17
foundation with
ordinary cement
concrete M 100 mix
and providing
necessary vertical pin
headers including
formwork,vibrating,ra
mming and curing
complete( Br SOR I.N.
12)
3 51.20 Cum. Providing and filling in 4953.00 27.48 4980.48 Cum 255000.58
foundation with
ordinary cement
concrete M 150 mix
and providing
necessary vertical pin
headers including
formwork,vibrating,ra
mming and curing
complete(SOR I.N. 12
+ 2*215)
4 15.00 Rmt Supplying and fixing 2754.00 0.47 2754.47 Rmt. 41316.98
reinforced concrete
heavy duty non
pressure pipes with
collars for culverts
including setting and
jointing the pipes in
cm 1:2 watering and
laying (To level of
slope ) of I.S class
NP-3 of following
internal diameters. in
mm
(Cl S.O.R. I.N.26.105.
IV) : 900 dia.
900
5 2.00 Nos. Numbering the 53.00 1.00 54.00 No. 108.00
C.D.work with
approved paint
including all materials
for paintings etc.
complete.
( Cl SOR I.N.86.0.0)
7 19.00 Cm. Providing and filling 360.00 4.02 364.02 Cm. 6916.38
sand below R.C.C. raft
in layers including
ramming 7 watering
complete.
(Bridge SOR I.No-16.)
8 31.00 Nos. Providing and laying 36.00 1.32 37.32 Nos 1157.01
weep hole in
abutment and
returning by using
A.C. pipes of 100mm
diameter including
laying in proper
grade and jointing
etc. complete as per
detailed specifications.
( Br SOR I.N. 50.A)
Total Rs 337074.05
Hydrolic calculation for H.P drain
Hydrolic calculation for 2 Raw H.P. Drain
= 2.2608 Sq. mt
NAME OF WORK:
Details of H.P Drain
Sr.No. C.D.No. Location of Proposed No. of rows Existing pipe Prop . G.L F.R.L Difference of Width of Length of Length Height Base Base Widing
Pipe culvert pipe dia. MM length Length of F.R.L - G.L Craddle Head wall of head of head of of 2/1
KM. pipe wall wall head head side
wall wall
10/100 0 1200 2 0.00 7.500 98.100 100 1.90 3.90 9.60 9.60 3.10 1.48 1.50 2
C.D No chainage
H.P.Drain (C.D.Works)
MEASUREMENT SHEET
Item No.1 EXCAVATION for foundation upto 1.50 Mt. ....... Loose or Soft soil.
Head wall
2 x 9.90 X 1.80 X 1.20 = 42.77 cum.
Below craddle pipe
1 x 3.90 x 3.90 x 0.45 = 6.84 cum
Item No.2 Providing and laying cement concrete 1:3:6 ... including cost of formwork
Head wall
2 x 9.90 X 1.80 X 0.20 = 7.13 cum.
Item No.3 Providing and laying cement concrete 1:2:4 ..... including cost of formwork
but excluding the cost of reinforcement.
2 x 9.60 X 0.45 + 1.50 X 3.10 = 58.03 cum.
2
For Craddle
2 x 3.90 X 0.45 X 1.55 = 5.44 cum.
Net 63.72
Say 63.80 Cum
Item No.4 Supplying and fixing reinforced concrete heavy duty non pressure pipes of
I.S class NP-3
1200 mm dia. = 15.00 Rmt
Item No.5 Numbering the C.D.work with approved paint including all materials for paintings
Deduction
Less for pipe
2 X 5.15 X 0.785 1.4 1.4 = 15.85 cum.
Net 21.31
Say 22.0 cum.
Item No.8 Providing Weephole ----
37.5
Say 38 No.
H.P. DRAIN
ABSTRACT
chainage Cd No. --
Item Quantity. Item of work Tendered Rate Unit Amount.
No.
Rate 1% L.C. Total
1 49.61 Cum. EXCAVATION for 82.00 0.47 82.47 Cum 4091.29
foundation upto
1.50 Mt. depth
including sorting out
and stacking of
useful materials and
disposing of the
excavated stuff
upto 50 Meter lead.
Loose or Soft soil.
(Rd & cl ch 26/75/00)
2 7.13 Cum. Providing and filling in 3344.00 23.18 3367.18 Cum 24001.26
foundation with
ordinary cement
concrete M 100 mix
and providing
necessary vertical pin
headers including
formwork,vibrating,ra
mming and curing
complete( Br SOR I.N.
12)
3 63.80 Cum. Providing and filling in 4953.00 27.48 4980.48 Cum 317754.62
foundation with
ordinary cement
concrete M 150 mix
and providing
necessary vertical pin
headers including
formwork,vibrating,ra
mming and curing
complete(SOR I.N. 12
+ 2*215)
4 15.00 Rmt Supplying and fixing 2754.00 0.47 2754.47 Rmt. 41316.98
reinforced concrete
heavy duty non
pressure pipes with
collars for culverts
including setting and
jointing the pipes in
cm 1:2 watering and
laying (To level of
slope ) of I.S class
NP-3 of following
internal diameters. in
mm
(Cl S.O.R. I.N.26.105.
IV) : 900 dia.
900
5 2.00 Nos. Numbering the 53.00 1.00 54.00 No. 108.00
C.D.work with
approved paint
including all materials
for paintings etc.
complete.
( Cl SOR I.N.86.0.0)
7 22.00 Cm. Providing and filling 360.00 4.02 364.02 Cm. 8008.44
sand below R.C.C. raft
in layers including
ramming 7 watering
complete.
(Bridge SOR I.No-16.)
8 38.00 Nos. Providing and laying 36.00 1.32 37.32 Nos 1418.27
weep hole in
abutment and
returning by using
A.C. pipes of 100mm
diameter including
laying in proper
grade and jointing
etc. complete as per
detailed specifications.
( Br SOR I.N. 50.A)
Total Rs 407505.77
Cathment Area Water way required no of Pipe Dia Area provided
hactor sq mt sq mt
1 4 to 4.8 4.8 0.440367 1 750 0.441563
2 4.8 to 9.5 9.5 0.87156 2 750 0.883125
3 9.5 to 14.3 14.3 1.311927 3 750 1.324688
4 14.3 to 19.2 19.2 1.761468 4 750 1.76625
5 19.2 to 24 24 2.201835 5 750 2.207813