Calculation #5&6 Area

Date : Mar, 9th 2015


No of Height Width Thickness
No Name of Building
Building (m) (m) (m)
1 912 Ash Truck Garage
2 909 Fire Fighting Truck Garage
3 908 Vehicle maintenance Shop
4 907 Car Repair Shop
5 954 Main Parking Area (100 Cars )
6 904 Storage House
7 903 Work Shop Building
8 901 Main Gate House
9 462 Transfer Tower
10 514 Conveyor
11 900 Administration Building
12 905 Outdoor Storage House
13 914 Utility Vehicle Garage
14 550 Light Fuel Oil Unloading Station
15 551 Light Fuel Oil Tank
16 552 Light Fuel Oil Tank Yard
17 553 Foam Tank Shelter
18 554 Feul Oil Pump House
19 464 Crusher House
20 701 Waste Water Slude Dewatering Building
21 913 Water & Waste Water Treatment Garage
22 902 Seconadary Gate House
23 702 Sewage Treatment Pant
24 700 Waste Water Treatment Plant Bldg/Electrical Room
25 807 FGD Electrical House
26 808 Compressor/Dust Filter/Ash Handling Control
27 358 Flue Gas Desulfurization System
28 351 Fly Ash Silo
29 352 Induced Draft Fan
30 353 Chimney (Reinforcement Concrete )
31 354 CEMS Room
32 350 Electrostatic Precipitator
33 951 Plan Roads
34 300 Boiler
35 301 Boiler Drainage Pit
36 302 Bottom Ash Silo
37 303 DCC Overflow Pit With Setling Basin
38 800 Central Control & Electrical Swithgear Building
39 803 Oil Storage Day Tank
40 600 Auxilary Boiler & Elctrical Room
41 516 Conveyor
42 404 Bunker Bay
43 517 Conveyor
44 810 Switchyard Relay & Control Building
45 801 Transformer Yard
46 804 500 KV switchyard Area
47 802 Emergency Diesel Generator Area
48 661 Condensate Polishing Plant
49 250 Steam Turbine Building
50 251 H2 Generation Plant Building
51 854 Seawater Pressure Test
52 654 Make Up Water Tank
53 953 Boundary Wall
54 955 Boundary Fence
55 662 Ammonia Waste Water tank
56 950 Unloading Ramp
57 651 Multi-Pupose Pump Shelter & Electrical Room
58 750 Fire Fighting Water Pump House
59 658 Service/Fire fighting Water Basin
60 650 Water Treatment Plant / Desalination Plant
61 655 Desalination Plant Filtered Water basins
62 656 Seawater Clarifier
63 659 Pretreatment
64 653 Electrochlorination System Building
65 853 Service Water Pumping Station
66 652 collection & Neutralization Basin
67 657 Regeneration Station
68 660 Demineralization Plant
69 859 Cooling Water Return Lines
70 852 Seawater Screening & Pumping station
71 851 Seawater Intake Pipes
72 463 Conveyor
73 356 Sea Water FGD Pumping Station
74 860 Siphon Pits
75 355 Seawater FGD Aeration Basin
76 359 Aeration Blower Shelter
77 855 Weir Structure
78 858 Shoreline Protection
79 952 Channel Bridge
80 856 Cooling Water Outfall Channel
81 857 Cooling Water Outfall Structure
Grand Total
Top Elevation Bottom Elevation Excavation Remark
MSL MSL ( m3 )
Calculation #5&6 Area
Date : Mar, 15th 2015

No of Height Width Area Thickness


No Name of Building
Building
(m) (m) ( m2 ) (m)
1 912 Ash Truck Garage 17 8 136 3,365
2 909 Fire Fighting Truck Garage 20 15 300 3,353
3 908 Vehicle maintenance Shop 20 12 240 3,157
4 907 Car Repair Shop 20 12 240 2,897
5 954 Main Parking Area (100 Cars ) 58 36.7 2,129 2,300
6 904 Storage House 77 35 2,695 3,084
7 903 Work Shop Building 80 35 2,800 1,935
8 901 Main Gate House 10 10 100 2,300
9 462 Transfer Tower - - 306 2,300
10 900 Administration Building 54 32.5 1,755 2,400
11 905 Outdoor Storage House - - 3,848 2,300
12 914 Utility Vehicle Garage 10 10 100 2,300
13 550 Light Fuel Oil Unloading Station 20 13 260 2,350
14 551 Light Fuel Oil Tank - - 254.4 2,350
15 552 Light Fuel Oil Tank Yard 50 23 1,150 2,350
16 553 Foam Tank Shelter 9 6 54 2,350
17 554 Feul Oil Pump House 16 10 160 2,400
18 464 Crusher House - - 308.9 2,400
19 701 Waste Water Slude Dewatering Building 44 12 528 2,400
20 913 Water & Waste Water Treatment Garage 20 15 300 2,450
21 902 Seconadary Gate House 10 10 100 2,500
22 702 Sewage Treatment Pant 34 22 748 2,500
23 700 Waste Water Treatment Plant Bldg/Electrical Room - - 551.6 2,450
24 807 FGD Electrical House 47.3 19 899 2,400
25 808 Compressor/Dust Filter/Ash Handling Control - - 981.2 1,184
26 358 Flue Gas Desulfurization System - - 5,284 2,758
27 351 Fly Ash Silo - - 2,262 2,951
28 352 Induced Draft Fan - - 1,994 2,452
29 353 Chimney (Reinforcement Concrete ) - - 531 2,925
30 354 CEMS Room 5 4.5 23 2,953
31 350 Electrostatic Precipitator - - 14,312 3,187
32 300 Boiler 174 140 24,360 1,068
33 301 Boiler Drainage Pit 33 9 297 2,564
34 302 Bottom Ash Silo 48 48 2,304 1,901
35 303 DCC Overflow Pit With Setling Basin 33 9 297 1,853
36 800 Central Control & Electrical Swithgear Building 65 40 2,600 1,642
37 803 Oil Storage Day Tank - - 192 1,705
38 600 Auxilary Boiler & Elctrical Room 22.7 20.5 465 1,494
39 810 Switchyard Relay & Control Building 28 12 336 1,805
40 801 Transformer Yard 90 90 8,100 1,304
41 804 500 KV switchyard Area 167 76 12,692 2,135
42 802 Emergency Diesel Generator Area

230 450 103,500 3,336


43 661 Condensate Polishing Plant
230 450 103,500 3,336
44 250 Steam Turbine Building
45 404 Bunker Bay
46 251 H2 Generation Plant Building 10 10 100 2,762
47 654 Make Up Water Tank - - 142 2,455
48 662 Ammonia Waste Water tank - - 79 2,608
49 950 Unloading Ramp 80 20 1,600 1,507
50 651 Multi-Pupose Pump Shelter & Electrical Room 20 9 180 2,259
51 750 Fire Fighting Water Pump House 36 9 324 2,282
52 658 Service/Fire fighting Water Basin 100 28 2,800 2,576
53 650 Water Treatment Plant / Desalination Plant 116 35 4,060 2,524
54 655 Desalination Plant Filtered Water basins 23 15 345 2,387
55 656 Seawater Clarifier - - 1,472 2,220
56 659 Pretreatment 45 25 1,125 2,763
57 653 Electrochlorination System Building 26 24 624 2,327
58 853 Service Water Pumping Station 18 11 198 2,870
59 652 Collection & Neutralization Basin 27 8 216 3,022
60 657 Regeneration Station 16 13 208 3,099
62 852 Seawater Screening & Pumping station 76 41 3,116 2,497
63 356 Sea Water FGD Pumping Station 20 22.5 450 2,500
64 860 Siphon Pits 68.5 35 2,398 1,049
65 355 Seawater FGD Aeration Basin 100 68.5 6,850 1,603
66 359 Aeration Blower Shelter 140 27 3,780 815
67 855 Weir Structure 78.5 35.6 2,795 1,657
70 951 Plan Road - - 33,407 2,252

514,515,516,
71 517,463 Conveyor - - 5,031 2,023

854,859,
72 851,856,857 Pipe Lines - - 10,772 2,482

Grand Total Area ( m2) 282,563 Grand Total V


Top Elevation Bottom Elevation
Excavation
Actual Design Remark
MSL + MSL ( m3 )
3,365 457.6
3,353 1,005.9
3,157 757.7
2,897 695.3
2,300 4,895.8
3,084 8,311.4
1,935 5,418.0
2,300 230.0
2,300 703.8
2,400 4,212.0
2,300 8,850.4
2,300 230.0
2,350 611.0
2,350 597.8
2,350 2,702.5
2,350 126.9
2,400 384.0
2,400 741.4
2,400 1,267.2
2,450 735.0
2,500 250.0
2,500 1,870.0
2,450 1,351.4
2,400 2,156.9
1,184 1,161.7
2,758 14,573.3
2,951 6,675.2
2,452 4,889.3
2,925 1,553.2
2,953 66.4
3,187 45,612.3
2,618 1,550 26,016.5
2,564 761.5
1,901 4,379.9
1,853 550.3
1,642 4,269.2
1,705 327.4
1,494 695.2
1,805 606.5
1,304 10,562.4
2,135 27,097.4
3365 1

3,336 345,276.0
2334 2
3,336 345,276.0
1272 3
1745 4
2,762 276.2 2034 5
2,455 348.6 2136 6
2,608 204.7 2460 7
1,507 2,411.2 2439 8
2,259 406.6 2321 9
2,282 739.4 2755 10
2,576 7,212.8 2922 11
2,524 10,247.4 2642 12
2,387 823.5 1885 13
2,220 3,268.7 980 14
2,763 3,108.4 1527 15
2,327 1,452.0 2951 16
2,870 568.3 3685 17
3,022 652.8 1674 18
3,099 644.6 2163 19
2,497 7,780.7 1378 20
2,500 1,125.0 2082 21
1,049 2,515.0 2476 22
1,603 10,980.6 1809 23
815 3,080.7 3021 24
1,657 4,630.7 25
2,252 75,232.6 54056 24
2252.3333
2,023 10,177.7

2,482 26,736.1

Grand Total Volume ( m3 )


Calculation #5&6 Area
Date : Apr, 7th 2015

Height Width Area Thickness


No. of
No Name of Building
Building (m) (m) ( m2 ) ( mm )
A B C=AxB D=E-G
1 912 Ash Truck Garage 17 8 136 635
2 909 Fire Fighting Truck Garage 20 15 300 647
3 908 Vehicle maintenance Shop 20 12 240 1,143
4 907 Car Repair Shop 20 12 240 1,103
5 954 Main Parking Area (100 Cars ) 58 36.7 2,129 1,700
6 904 Storage House 77 35 2,695 916
7 903 Work Shop Building 80 35 2,800 2,065
8 901 Main Gate House 10 10 100 1,700
9 462 Transfer Tower - - 306 200
10 463 Transfer Tower - - 2,787 4
11 900 Administration Building 54 32.5 1,755 700
12 905 Outdoor Storage House - - 3,848 1,700
13 914 Utility Vehicle Garage 10 10 100 1,700
14 550 Light Fuel Oil Unloading Station 20 13 260 800
15 551 Light Fuel Oil Tank - - 254.4 800
16 552 Light Fuel Oil Tank Yard 50 23 1,150 800
17 553 Foam Tank Shelter 9 6 54 1,200
18 554 Feul Oil Pump House 16 10 160 1,150
19 464 Crusher House - - 308.9 350
20 701 Waste Water Slude Dewatering Building 44 12 528 900
21 913 Water & Waste Water Treatment Garage 20 15 300 850
22 902 Seconadary Gate House 10 10 100 1,000
23 702 Sewage Treatment Pant 34 22 748 800
24 700 Waste Water Treatment Plant Bldg/Electrical Room - - 551.6 850
25 807 FGD Electrical House 47.3 19 899 1,800
26 808 Compressor/Dust Filter/Ash Handling Control - - 981.2 3,016
27 358 Flue Gas Desulfurization System - - 5,284 1,442
28 351 Fly Ash Silo - - 2,262 1,149
29 352 Induced Draft Fan - - 1,994 748
30 353 Chimney (Reinforcement Concrete ) - - 531 275
31 354 CEMS Room 5 4.5 23 247
32 350 Electrostatic Precipitator - - 14,312 13
33 300 Boiler 174 140 24,360 1,068
34 301 Boiler Drainage Pit 33 9 297 1,586
35 302 Bottom Ash Silo 48 48 2,304 2,799
36 303 DCC Overflow Pit With Setling Basin 33 9 297 2,647
37 800 Central Control & Electrical Swithgear Building 65 40 2,600 342
38 803 Oil Storage Day Tank - - 192 3,295
39 600 Auxilary Boiler & Elctrical Room 22.7 20.5 465 3,106
40 801 Transformer Yard 90 90 8,100 1,796
41 804 500 KV switchyard Area 167 76 12,692 1,265
42 802 Emergency Diesel Generator Area
43 661 Condensate Polishing Plant
230 450 103,500 9,286
44 250 Steam Turbine Building
45 404 Bunker Bay
46 251 H2 Generation Plant Building 10 10 100 938
47 654 Make Up Water Tank - - 142 1,245
48 662 Ammonia Waste Water tank - - 79 283
49 950 Unloading Ramp 80 20 1,600 507
50 651 Multi-Pupose Pump Shelter & Electrical Room 20 9 180 1,541
51 750 Fire Fighting Water Pump House 36 9 324 1,282
52 658 Service/Fire fighting Water Basin 100 28 2,800 1,576
53 650 Water Treatment Plant / Desalination Plant 116 35 4,060 24
54 655 Desalination Plant Filtered Water basins 23 15 345 113
55 656 Seawater Clarifier - - 1,472 930
56 659 Pretreatment 45 25 1,125 1,763
57 653 Electrochlorination System Building 26 24 624 1,273
58 853 Service Water Pumping Station 18 11 198 1,380
59 652 Collection & Neutralization Basin 27 8 216 478
60 657 Regeneration Station 16 13 208 201
61 852 Seawater Screening & Pumping station 76 41 3,116 14,897
62 356 Sea Water FGD Pumping Station 20 22.5 450 800
63 860 Siphon Pits 68.5 35 2,398 2,251
64 355 Seawater FGD Aeration Basin 100 68.5 6,850 1,697
65 359 Aeration Blower Shelter 140 27 3,780 2,785
66 855 Weir Structure 78.5 35.6 2,795 1,643
67 951 Plan Road - - 33,407 898

514,515,
68 516, 517 Conveyor - - 2,244 1,477

854,859,
69 851 Pipe Line - - 4,724 4,524

70 856 Pipe Line - - 4,051 5,700


71 857 Pipe Line - - 1,997 8,050

Grand Total Area ( m2) 282,227 Grand


Top Elevation Bottom Elevation
Excavation
Actual Site Design Floor Design Thickness of building
Remark
MSL + MSL + MSL ( m3 )
E F G H=CxD I=F-G
3,365 4,300 4,000 86 300
3,353 4,300 4,000 194 300
3,157 4,600 4,300 274 300
2,897 4,300 4,000 265 300
2,300 4,300 4,000 3,619 300
3,084 4,300 4,000 2,469 300
1,935 4,300 4,000 5,782 300
2,300 4,300 4,000 170 300
2,300 3,750 2,100 61 1,650
2,096 3,750 2,100 11 1,650
2,400 4,300 3,100 1,229 1,200
2,300 4,300 4,000 6,542 300
2,300 4,300 4,000 170 300
2,350 4,300 3,150 208 1,150
2,350 4,300 3,150 204 1,150
2,350 4,300 3,150 920 1,150
2,350 4,300 3,550 65 750
2,400 4,300 3,550 184 750
2,400 4,250 2,050 108 2,200
2,400 4,000 3,300 475 700
2,450 4,000 3,300 255 700
2,500 4,000 3,500 100 500
2,500 4,000 3,300 598 700
2,450 4,000 3,300 469 700
2,400 5,300 4,200 1,618 1,100
1,184 5,300 4,200 2,959 1,100
2,758 5,300 4,200 7,620 1,100
2,951 5,300 4,100 2,599 1,200
2,452 5,300 3,200 1,492 2,100
2,925 5,300 3,200 146 2,100
2,953 5,300 3,200 6 2,100
3,187 5,300 3,200 186 2,100
2,618 5,300 1,550 26,016 3,750
2,564 5,300 4,150 471 1,150
1,901 5,300 4,700 6,449 600
1,853 5,300 4,500 786 800
1,642 5,300 1,300 889 4,000
1,705 5,300 5,000 633 300
1,494 5,300 4,600 1,445 700
1,304 5,300 3,100 14,548 2,200
2,135 5,300 3,400 16,055 1,900

3,336 5,300 -5,950 96,110 11,250

2,762 4,000 3,700 94 300


2,455 4,000 3,700 177 300
2,608 4,000 2,325 22 1675
1,507 3,000 1,000 811 2000
2,259 4,300 3,800 277 500
2,282 4,300 1,000 415 3300
2,576 4,300 1,000 4,413 3300
2,524 4,300 2,500 97 1800
2,387 4,300 2,500 39 1800
2,220 4,000 1,290 1,369 2710
2,763 4,300 1,000 1,983 3300
2,327 4,300 3,600 794 700
2,870 4,090 1,490 273 2600
3,022 4,000 3,500 103 500
3,099 4,000 3,300 42 700
2,497 3,950 -12,400 46,419 16350
2,500 4,000 3,300 360 700
1,049 4,000 3,300 5,397 700
1,603 4,000 3,300 11,624 700
815 4,300 3,600 10,527 700
1,657 4,000 3,300 4,592 700
2,252 Vary 3,150 29,999

2,023 4,250 3,500 3,314 750

2,804 4,750 -1,720 21,371 6470

2,500 2,500 -3,200 23,091 5700


2,500 4,200 -5,550 16,076 9750
Grand Total Volume ( m3 ) 388,167
7200
4700
11900
5950

2668
2798
2947
8413
2804.3333
Calculation #5&6 Area
Date : Apr, 7th 2015

Height Width Area Thickness


No. of
No Name of Building
Building (m) (m) ( m2 ) ( mm )
A B C=AxB D=E-G
1 912 Ash Truck Garage 17 8 136 -635
2 909 Fire Fighting Truck Garage 20 15 300 -647
3 908 Vehicle maintenance Shop 20 12 240 -1,143
4 907 Car Repair Shop 20 12 240 -1,103
5 954 Main Parking Area (100 Cars ) 58 36.7 2,129 -1,700
6 904 Storage House 77 35 2,695 -916
7 903 Work Shop Building 80 35 2,800 -2,065
8 901 Main Gate House 10 10 100 -1,700
9 462 Transfer Tower - - 306 200
10 463 Transfer Tower - - 2,787 -4
11 900 Administration Building 54 32.5 1,755 -700
12 905 Outdoor Storage House - - 3,848 -1,700
13 914 Utility Vehicle Garage 10 10 100 -1,700
14 550 Light Fuel Oil Unloading Station 20 13 260 -800
15 551 Light Fuel Oil Tank - - 254.4 -800
16 552 Light Fuel Oil Tank Yard 50 23 1,150 -800
17 553 Foam Tank Shelter 9 6 54 -1,200
18 554 Feul Oil Pump House 16 10 160 -1,150
19 464 Crusher House - - 308.9 350
20 701 Waste Water Slude Dewatering Building 44 12 528 -900
21 913 Water & Waste Water Treatment Garage 20 15 300 -850
22 902 Seconadary Gate House 10 10 100 -1,000
23 702 Sewage Treatment Pant 34 22 748 -800
24 700 Waste Water Treatment Plant Bldg/Electrical Room - - 551.6 -850
25 807 FGD Electrical House 47.3 19 899 -1,800
26 808 Compressor/Dust Filter/Ash Handling Control - - 981.2 -3,016
27 358 Flue Gas Desulfurization System - - 5,284 -1,442
28 351 Fly Ash Silo - - 2,262 -1,149
29 352 Induced Draft Fan - - 1,994 -748
30 353 Chimney (Reinforcement Concrete ) - - 531 -275
31 354 CEMS Room 5 4.5 23 -247
32 350 Electrostatic Precipitator - - 14,312 -13
33 300 Boiler 174 140 24,360 1,068
34 301 Boiler Drainage Pit 33 9 297 -1,586
35 302 Bottom Ash Silo 48 48 2,304 -2,799
36 303 DCC Overflow Pit With Settling Basin 33 9 297 -2,647
37 800 Central Control & Electrical Swithgear Building 65 40 2,600 342
38 803 Oil Storage Day Tank - - 192 -3,295
39 600 Auxilary Boiler & Elctrical Room 22.7 20.5 465 -3,106
40 801 Transformer Yard 90 90 8,100 -1,796
41 804 500 KV switchyard Area 167 76 12,692 -1,265
42 802 Emergency Diesel Generator Area
43 661 Condensate Polishing Plant
- - 10,348 9,286
44 250 Steam Turbine Building
45 404 Bunker Bay
46 251 H2 Generation Plant Building 10 10 100 -938
47 654 Make Up Water Tank - - 142 -1,245
48 662 Ammonia Waste Water tank - - 79 283
49 950 Unloading Ramp 80 20 1,600 507
50 651 Multi-Pupose Pump Shelter & Electrical Room 20 9 180 -1,541
51 750 Fire Fighting Water Pump House 36 9 324 1,282
52 658 Service/Fire fighting Water Basin 100 28 2,800 1,576
53 650 Water Treatment Plant / Desalination Plant 116 35 4,060 24
54 655 Desalination Plant Filtered Water basins 23 15 345 -113
55 656 Seawater Clarifier - - 1,472 930
56 659 Pretreatment 45 25 1,125 1,763
57 653 Electrochlorination System Building 26 24 624 -1,273
58 853 Service Water Pumping Station 18 11 198 1,380
59 652 Collection & Neutralization Basin 27 8 216 -478
60 657 Regeneration Station 16 13 208 -201
61 852 Seawater Screening & Pumping station 76 41 3,116 14,897
62 356 Sea Water FGD Pumping Station 20 22.5 450 -800
63 860 Siphon Pits 68.5 35 2,398 -2,251
64 355 Seawater FGD Aeration Basin 100 68.5 6,850 903
65 359 Aeration Blower Shelter 140 27 3,780 -2,785
66 855 Weir Structure 78.5 35.6 2,795 -1,643
67 951 Plan Road - - 33,407 -898

514,515,
68 516, 517 Conveyor - - 2,244 -1,477

854,859,
69 851 Pipe Line - - 4,724 4,524

70 856 Cooling Water Outfall Channel - - 4,051 5,700


71 857 Cooling Water oOutfall Structure - - 1,997 8,050

Grand Total Area ( m2) 189,075 Grand To


Top Elevation Bottom Elevation Thickness of
Volume
Actual Site Design Floor Design building
Remark
MSL + MSL + MSL ( m3 ) ( mm )
E F G H=CxD I=F-G
3,365 4,300 4,000 -86 300 Fill
3,353 4,300 4,000 -194 300 Fill
3,157 4,600 4,300 -274 300 Fill
2,897 4,300 4,000 -265 300 Fill
2,300 4,300 4,000 -3,619 300 Fill
3,084 4,300 4,000 -2,469 300 Fill
1,935 4,300 4,000 -5,782 300 Fill
2,300 4,300 4,000 -170 300 Fill
2,300 3,750 2,100 61 1,650 Excavation
2,096 3,750 2,100 -11 1,650 Fill
2,400 4,300 3,100 -1,229 1,200 Fill
2,300 4,300 4,000 -6,542 300 Fill
2,300 4,300 4,000 -170 300 Fill
2,350 4,300 3,150 -208 1,150 Fill
2,350 4,300 3,150 -204 1,150 Fill
2,350 4,300 3,150 -920 1,150 Fill
2,350 4,300 3,550 -65 750 Fill
2,400 4,300 3,550 -184 750 Fill
2,400 4,250 2,050 108 2,200 Excavation
2,400 4,000 3,300 -475 700 Fill
2,450 4,000 3,300 -255 700 Fill
2,500 4,000 3,500 -100 500 Fill
2,500 4,000 3,300 -598 700 Fill
2,450 4,000 3,300 -469 700 Fill
2,400 5,300 4,200 -1,618 1,100 Fill
1,184 5,300 4,200 -2,959 1,100 Fill
2,758 5,300 4,200 -7,620 1,100 Fill
2,951 5,300 4,100 -2,599 1,200 Fill
2,452 5,300 3,200 -1,492 2,100 Fill
2,925 5,300 3,200 -146 2,100 Fill
2,953 5,300 3,200 -6 2,100 Fill
3,187 5,300 3,200 -186 2,100 Fill
2,618 5,300 1,550 26,016 3,750 Excavation
2,564 5,300 4,150 -471 1,150 Fill
1,901 5,300 4,700 -6,449 600 Fill
1,853 5,300 4,500 -786 800 Fill
1,642 5,300 1,300 889 4,000 Excavation
1,705 5,300 5,000 -633 300 Fill
1,494 5,300 4,600 -1,445 700 Fill
1,304 5,300 3,100 -14,548 2,200 Fill
2,135 5,300 3,400 -16,055 1,900 Fill

3,336 5,300 -5,950 96,092 11,250 Excavation

2,762 4,000 3,700 -94 300 Fill


2,455 4,000 3,700 -177 300 Fill
2,608 4,000 2,325 22 1,675 Excavation
1,507 3,000 1,000 811 2,000 Excavation
2,259 4,300 3,800 -277 500 Fill
2,282 4,300 1,000 415 3,300 Excavation
2,576 4,300 1,000 4,413 3,300 Excavation
2,524 4,300 2,500 97 1,800 Excavation
2,387 4,300 2,500 -39 1,800 Fill
2,220 4,000 1,290 1,369 2,710 Excavation
2,763 4,300 1,000 1,983 3,300 Excavation
2,327 4,300 3,600 -794 700 Fill
2,870 4,090 1,490 273 2,600 Excavation
3,022 4,000 3,500 -103 500 Fill
3,099 4,000 3,300 -42 700 Fill
2,497 3,950 -12,400 46,419 16,350 Excavation
2,500 4,000 3,300 -360 700 Fill
1,049 4,000 3,300 -5,397 700 Fill
1,603 4,000 700 6,186 3,300 Fill
815 4,300 3,600 -10,527 700 Fill
1,657 4,000 3,300 -4,592 700 Fill
2,252 Vary 3,150 -29,999 315 Fill

2,023 4,250 3,500 -3,314 750 Fill

2,804 4,750 -1,720 21,371 6,470 Excavation

2,500 2,500 -3,200 23,091 5,700 Excavation


2,500 4,200 -5,550 16,076 9,750 Excavation
Grand Total Volume ( m3 ) 108,679 239,508
148579
-90,929

2668
2798
2947
8413
2804.3333333
Calculation #5&6 Area
Date : Apr, 7th 2015

Height Width Area Thickness


No. of
No Name of Building
Building (m) (m) ( m2 ) ( mm )
A B C=AxB D=E-G
1 912 Ash Truck Garage 17 8 136 365
2 909 Fire Fighting Truck Garage 20 15 300 353
3 908 Vehicle maintenance Shop 20 12 240 -143
4 907 Car Repair Shop 20 12 240 -103
5 954 Main Parking Area (100 Cars ) 58 36.7 2,129 -700
6 904 Storage House 77 35 2,695 84
7 903 Work Shop Building 80 35 2,800 -1,065
8 901 Main Gate House 10 10 100 -700
9 462 Transfer Tower - - 306 1,200
10 463 Transfer Tower - - 2,787 996
11 900 Administration Building 54 32.5 1,755 300
12 905 Outdoor Storage House - - 3,848 -700
13 914 Utility Vehicle Garage 10 10 100 -700
14 550 Light Fuel Oil Unloading Station 20 13 260 200
15 551 Light Fuel Oil Tank - - 254.4 200
16 552 Light Fuel Oil Tank Yard 50 23 1,150 200
17 553 Foam Tank Shelter 9 6 54 -200
18 554 Feul Oil Pump House 16 10 160 -150
19 464 Crusher House - - 308.9 1,350
20 701 Waste Water Slude Dewatering Building 44 12 528 100
21 913 Water & Waste Water Treatment Garage 20 15 300 150
22 902 Seconadary Gate House 10 10 100 0
23 702 Sewage Treatment Pant 34 22 748 200
24 700 Waste Water Treatment Plant Bldg/Electrical Room - - 551.6 150
25 807 FGD Electrical House 47.3 19 899 -800
26 808 Compressor/Dust Filter/Ash Handling Control - - 981.2 -2,016
27 358 Flue Gas Desulfurization System - - 5,284 -442
28 351 Fly Ash Silo - - 2,262 -149
29 352 Induced Draft Fan - - 1,994 252
30 353 Chimney (Reinforcement Concrete ) - - 531 725
31 354 CEMS Room 5 4.5 23 753
32 350 Electrostatic Precipitator - - 14,312 987
33 300 Boiler 174 140 24,360 2,068
34 301 Boiler Drainage Pit 33 9 297 -586
35 302 Bottom Ash Silo 48 48 2,304 -1,799
36 303 DCC Overflow Pit With Settling Basin 33 9 297 -1,647
37 800 Central Control & Electrical Swithgear Building 65 40 2,600 1,342
38 803 Oil Storage Day Tank - - 192 -2,295
39 600 Auxilary Boiler & Elctrical Room 22.7 20.5 465 -2,106
40 801 Transformer Yard 90 90 8,100 -796
41 804 500 KV switchyard Area 167 76 12,692 -265
42 802 Emergency Diesel Generator Area
43 661 Condensate Polishing Plant
- - 10,348 9,286
44 250 Steam Turbine Building
45 404 Bunker Bay
46 251 H2 Generation Plant Building 10 10 100 62
47 654 Make Up Water Tank - - 142 -245
48 662 Ammonia Waste Water tank - - 79 1,283
49 950 Unloading Ramp 80 20 1,600 1,507
50 651 Multi-Pupose Pump Shelter & Electrical Room 20 9 180 -541
51 750 Fire Fighting Water Pump House 36 9 324 2,282
52 658 Service/Fire fighting Water Basin 100 28 2,800 2,576
53 650 Water Treatment Plant / Desalination Plant 116 35 4,060 1,024
54 655 Desalination Plant Filtered Water basins 23 15 345 887
55 656 Seawater Clarifier - - 1,472 1,930
56 659 Pretreatment 45 25 1,125 2,763
57 653 Electrochlorination System Building 26 24 624 -273
58 853 Service Water Pumping Station 18 11 198 2,380
59 652 Collection & Neutralization Basin 27 8 216 522
60 657 Regeneration Station 16 13 208 799
61 852 Seawater Screening & Pumping station 76 41 3,116 15,897
62 356 Sea Water FGD Pumping Station 20 22.5 450 200
63 860 Siphon Pits 68.5 35 2,398 -1,251
64 355 Seawater FGD Aeration Basin 100 68.5 6,850 1,903
65 359 Aeration Blower Shelter 140 27 3,780 -1,785
66 855 Weir Structure 78.5 35.6 2,795 -643
67 951 Plan Road - - 33,407 102

514,515,
68 516, 517 Conveyor - - 2,244 -477

854,859,
69 851 Pipe Line - - 4,724 4,524

70 856 Cooling Water Outfall Channel - - 4,051 5,700


71 857 Cooling Water oOutfall Structure - - 1,997 8,050

Grand Total Area ( m2) 189,075 Grand To


Top Elevation Bottom Elevation Thickness of
Volume
Actual Site Design Floor Design building
Remark
MSL + MSL + MSL ( m3 ) ( mm )
E F G H=CxD I=F-G
3,365 3,300 3,000 50 300 Excavation -25,282
3,353 3,300 3,000 106 300 Excavation 301,916
3,157 3,600 3,300 -34 300 Fill 43092
2,897 3,300 3,000 -25 300 Fill 345,008
2,300 3,300 3,000 -1,490 300 Fill
3,084 3,300 3,000 226 300 Excavation
1,935 3,300 3,000 -2,982 300 Fill
2,300 3,300 3,000 -70 300 Fill
2,300 2,750 1,100 367 1,650 Excavation
2,096 2,750 1,100 2,776 1,650 Excavation
2,400 3,300 2,100 527 1,200 Excavation
2,300 3,300 3,000 -2,694 300 Fill
2,300 3,300 3,000 -70 300 Fill
2,350 3,300 2,150 52 1,150 Excavation
2,350 3,300 2,150 51 1,150 Excavation
2,350 3,300 2,150 230 1,150 Excavation
2,350 3,300 2,550 -11 750 Fill
2,400 3,300 2,550 -24 750 Fill
2,400 3,250 1,050 417 2,200 Excavation
2,400 3,000 2,300 53 700 Excavation
2,450 3,000 2,300 45 700 Excavation
2,500 3,000 2,500 0 500 Excavation
2,500 3,000 2,300 150 700 Excavation
2,450 3,000 2,300 83 700 Excavation
2,400 4,300 3,200 -719 1,100 Fill
1,184 4,300 3,200 -1,978 1,100 Fill
2,758 4,300 3,200 -2,336 1,100 Fill
2,951 4,300 3,100 -337 1,200 Fill
2,452 4,300 2,200 502 2,100 Excavation
2,925 4,300 2,200 385 2,100 Excavation
2,953 4,300 2,200 17 2,100 Excavation
3,187 4,300 2,200 14,126 2,100 Excavation
2,618 4,300 550 50,376 3,750 Excavation
2,564 4,300 3,150 -174 1,150 Fill
1,901 4,300 3,700 -4,145 600 Fill
1,853 4,300 3,500 -489 800 Fill
1,642 4,300 300 3,489 4,000 Excavation
1,705 4,300 4,000 -441 300 Fill
1,494 4,300 3,600 -980 700 Fill
1,304 4,300 2,100 -6,448 2,200 Fill
2,135 4,300 2,400 -3,363 1,900 Fill

3,336 4,300 -6,950 96,092 11,250 Excavation

2,762 3,000 2,700 6 300 Excavation


2,455 3,000 2,700 -35 300 Fill
2,608 3,000 1,325 101 1,675 Excavation
1,507 2,000 0 2,411 2,000 Excavation
2,259 3,300 2,800 -97 500 Fill
2,282 3,300 0 739 3,300 Excavation
2,576 3,300 0 7,213 3,300 Excavation
2,524 3,300 1,500 4,157 1,800 Excavation
2,387 3,300 1,500 306 1,800 Excavation
2,220 3,000 290 2,842 2,710 Excavation
2,763 3,300 0 3,108 3,300 Excavation
2,327 3,300 2,600 -170 700 Fill
2,870 3,090 490 471 2,600 Excavation
3,022 3,000 2,500 113 500 Excavation
3,099 3,000 2,300 166 700 Excavation
2,497 2,950 -13,400 49,535 16,350 Excavation
2,500 3,000 2,300 90 700 Excavation
1,049 3,000 2,300 -2,999 700 Fill
1,603 3,000 -300 13,036 3,300 Fill
815 3,300 2,600 -6,747 700 Fill
1,657 3,000 2,300 -1,797 700 Fill
2,252 Vary 2,150 3,408 315 Fill

2,023 3,250 2,500 -1,070 750 Fill

2,804 3,750 -2,720 21,371 6,470 Excavation

2,500 1,500 -4,200 23,091 5,700 Excavation


2,500 3,200 -6,550 16,076 9,750 Excavation
Grand Total Volume ( m3 ) 276,634

2668
2798
2947
8413
2804.3333333
Calculation #5&6 Area
Date : Apr, 7th 2015

Height Width Area Thickness


No. of
No Name of Building
Building (m) (m) ( m2 ) ( mm )
A B C=AxB D=E-G
1 912 Ash Truck Garage 17 8 136 865
2 909 Fire Fighting Truck Garage 20 15 300 853
3 908 Vehicle maintenance Shop 20 12 240 357
4 907 Car Repair Shop 20 12 240 397
5 954 Main Parking Area (100 Cars ) 58 36.7 2,129 -200
6 904 Storage House 77 35 2,695 584
7 903 Work Shop Building 80 35 2,800 -565
8 901 Main Gate House 10 10 100 -200
9 462 Transfer Tower - - 306 1,700
10 463 Transfer Tower - - 2,787 1,496
11 900 Administration Building 54 32.5 1,755 800
12 905 Outdoor Storage House - - 3,848 -200
13 914 Utility Vehicle Garage 10 10 100 -200
14 550 Light Fuel Oil Unloading Station 20 13 260 700
15 551 Light Fuel Oil Tank - - 254.4 700
16 552 Light Fuel Oil Tank Yard 50 23 1,150 700
17 553 Foam Tank Shelter 9 6 54 300
18 554 Feul Oil Pump House 16 10 160 350
19 464 Crusher House - - 308.9 1,850
20 701 Waste Water Slude Dewatering Building 44 12 528 600
21 913 Water & Waste Water Treatment Garage 20 15 300 650
22 902 Seconadary Gate House 10 10 100 500
23 702 Sewage Treatment Pant 34 22 748 700
24 700 Waste Water Treatment Plant Bldg/Electrical Room - - 551.6 650
25 807 FGD Electrical House 47.3 19 899 -300
26 808 Compressor/Dust Filter/Ash Handling Control - - 981.2 -1,516
27 358 Flue Gas Desulfurization System - - 5,284 58
28 351 Fly Ash Silo - - 2,262 351
29 352 Induced Draft Fan - - 1,994 752
30 353 Chimney (Reinforcement Concrete ) - - 531 1,225
31 354 CEMS Room 5 4.5 23 1,253
32 350 Electrostatic Precipitator - - 14,312 1,487
33 300 Boiler 174 140 24,360 2,568
34 301 Boiler Drainage Pit 33 9 297 -86
35 302 Bottom Ash Silo 48 48 2,304 -1,299
36 303 DCC Overflow Pit With Settling Basin 33 9 297 -1,147
37 800 Central Control & Electrical Swithgear Building 65 40 2,600 1,842
38 803 Oil Storage Day Tank - - 192 -1,795
39 600 Auxilary Boiler & Elctrical Room 22.7 20.5 465 -1,606
40 801 Transformer Yard 90 90 8,100 -296
41 804 500 KV switchyard Area 167 76 12,692 235
42 802 Emergency Diesel Generator Area
43 661 Condensate Polishing Plant
- - 10,348 9,286
44 250 Steam Turbine Building
45 404 Bunker Bay
46 251 H2 Generation Plant Building 10 10 100 562
47 654 Make Up Water Tank - - 142 255
48 662 Ammonia Waste Water tank - - 79 1,783
49 950 Unloading Ramp 80 20 1,600 2,007
50 651 Multi-Pupose Pump Shelter & Electrical Room 20 9 180 -41
51 750 Fire Fighting Water Pump House 36 9 324 2,782
52 658 Service/Fire fighting Water Basin 100 28 2,800 3,076
53 650 Water Treatment Plant / Desalination Plant 116 35 4,060 1,524
54 655 Desalination Plant Filtered Water basins 23 15 345 1,387
55 656 Seawater Clarifier - - 1,472 2,430
56 659 Pretreatment 45 25 1,125 3,263
57 653 Electrochlorination System Building 26 24 624 227
58 853 Service Water Pumping Station 18 11 198 2,880
59 652 Collection & Neutralization Basin 27 8 216 1,022
60 657 Regeneration Station 16 13 208 1,299
61 852 Seawater Screening & Pumping station 76 41 3,116 16,397
62 356 Sea Water FGD Pumping Station 20 22.5 450 700
63 860 Siphon Pits 68.5 35 2,398 -751
64 355 Seawater FGD Aeration Basin 100 68.5 6,850 2,403
65 359 Aeration Blower Shelter 140 27 3,780 -1,285
66 855 Weir Structure 78.5 35.6 2,795 -143
67 951 Plan Road - - 33,407 602

514,515,
68 516, 517 Conveyor - - 2,244 23

854,859,
69 851 Pipe Line - - 4,724 4,524

70 856 Cooling Water Outfall Channel - - 4,051 5,700


71 857 Cooling Water oOutfall Structure - - 1,997 8,050

Grand Total Area ( m2) 189,075 Grand To


Top Elevation Bottom Elevation Thickness of
Volume
Actual Site Design Floor Design building
Remark
MSL + MSL + MSL ( m3 ) ( mm )
E F G H=CxD I=F-G
3,365 2,800 2,500 118 300 Excavation -2,007
3,353 2,800 2,500 256 300 Excavation
3,157 3,100 2,800 86 300 Excavation 380863
2,897 2,800 2,500 95 300 Excavation
2,300 2,800 2,500 -426 300 Fill
3,084 2,800 2,500 1,574 300 Excavation
1,935 2,800 2,500 -1,582 300 Fill
2,300 2,800 2,500 -20 300 Excavation
2,300 2,250 600 520 1,650 Excavation
2,096 2,250 600 4,169 1,650 Excavation
2,400 2,800 1,600 1,404 1,200 Excavation
2,300 2,800 2,500 -770 300 Fill
2,300 2,800 2,500 -20 300 Fill
2,350 2,800 1,650 182 1,150 Excavation
2,350 2,800 1,650 178 1,150 Excavation
2,350 2,800 1,650 805 1,150 Excavation
2,350 2,800 2,050 16 750 Excavation
2,400 2,800 2,050 56 750 Excavation
2,400 2,750 550 571 2,200 Excavation
2,400 2,500 1,800 317 700 Excavation
2,450 2,500 1,800 195 700 Excavation
2,500 2,500 2,000 50 500 Excavation
2,500 2,500 1,800 524 700 Excavation
2,450 2,500 1,800 359 700 Excavation
2,400 3,800 2,700 -270 1,100 Fill
1,184 3,800 2,700 -1,487 1,100 Fill
2,758 3,800 2,700 306 1,100 Excavation
2,951 3,800 2,600 794 1,200 Excavation
2,452 3,800 1,700 1,499 2,100 Excavation
2,925 3,800 1,700 650 2,100 Excavation
2,953 3,800 1,700 28 2,100 Excavation
3,187 3,800 1,700 21,282 2,100 Excavation
2,618 3,800 50 62,556 3,750 Excavation
2,564 3,800 2,650 -26 1,150 Fill
1,901 3,800 3,200 -2,993 600 Fill
1,853 3,800 3,000 -341 800 Fill
1,642 3,800 -200 4,789 4,000 Excavation
1,705 3,800 3,500 -345 300 Fill
1,494 3,800 3,100 -747 700 Fill
1,304 3,800 1,600 -2,398 2,200 Fill
2,135 3,800 1,900 2,983 1,900 Excavation

3,336 3,800 -7,450 96,092 11,250 Excavation

2,762 2,500 2,200 56 300 Excavation


2,455 2,500 2,200 36 300 Excavation
2,608 2,500 825 140 1,675 Excavation
1,507 1,500 -500 3,211 2,000 Excavation
2,259 2,800 2,300 -7 500 Fill
2,282 2,800 -500 901 3,300 Excavation
2,576 2,800 -500 8,613 3,300 Excavation
2,524 2,800 1,000 6,187 1,800 Excavation
2,387 2,800 1,000 479 1,800 Excavation
2,220 2,500 -210 3,578 2,710 Excavation
2,763 2,800 -500 3,671 3,300 Excavation
2,327 2,800 2,100 142 700 Excavation
2,870 2,590 -10 570 2,600 Excavation
3,022 2,500 2,000 221 500 Excavation
3,099 2,500 1,800 270 700 Excavation
2,497 2,450 -13,900 51,093 16,350 Excavation
2,500 2,500 1,800 315 700 Excavation
1,049 2,500 1,800 -1,801 700 Fill
1,603 2,500 -800 16,461 3,300 Fill
815 2,800 2,100 -4,857 700 Fill
1,657 2,500 1,800 -400 700 Fill
2,252 Vary 1,650 20,111 315 Excavation

2,023 2,750 2,000 52 750 Excavation

2,804 3,250 -3,220 21,371 6,470 Excavation

2,500 1,000 -4,700 23,091 5,700 Excavation


2,500 2,700 -7,050 16,076 9,750 Excavation
Grand Total Volume ( m3 ) 360,612

2668
2798
2947
8413
2804.3333333
Calculation #5&6 Area
Date : Apr, 7th 2015

Height Width Area Thickness


No. of
No Name of Building
Building (m) (m) ( m2 ) ( mm )
A B C=AxB D=E-G
1 912 Ash Truck Garage 17 8 136 865
2 909 Fire Fighting Truck Garage 20 15 300 853
3 908 Vehicle maintenance Shop 20 12 240 357
4 907 Car Repair Shop 20 12 240 397
5 954 Main Parking Area (100 Cars ) 58 36.7 2,129 -200
6 904 Storage House 77 35 2,695 584
7 903 Work Shop Building 80 35 2,800 -565
8 901 Main Gate House 10 10 100 -200
9 462 Transfer Tower - - 306 1,700
10 463 Transfer Tower - - 2,787 1,496
11 900 Administration Building 54 32.5 1,755 800
12 905 Outdoor Storage House - - 3,848 -200
13 914 Utility Vehicle Garage 10 10 100 -200
14 550 Light Fuel Oil Unloading Station 20 13 260 700
15 551 Light Fuel Oil Tank - - 254.4 700
16 552 Light Fuel Oil Tank Yard 50 23 1,150 700
17 553 Foam Tank Shelter 9 6 54 300
18 554 Feul Oil Pump House 16 10 160 350
19 464 Crusher House - - 308.9 1,850
20 701 Waste Water Slude Dewatering Building 44 12 528 600
21 913 Water & Waste Water Treatment Garage 20 15 300 650
22 902 Seconadary Gate House 10 10 100 500
23 702 Sewage Treatment Pant 34 22 748 700
24 700 Waste Water Treatment Plant Bldg/Electrical Room - - 551.6 650
25 807 FGD Electrical House 47.3 19 899 -300
26 808 Compressor/Dust Filter/Ash Handling Control - - 981.2 -1,516
27 358 Flue Gas Desulfurization System - - 5,284 58
28 351 Fly Ash Silo - - 2,262 351
29 352 Induced Draft Fan - - 1,994 752
30 353 Chimney (Reinforcement Concrete ) - - 531 1,225
31 354 CEMS Room 5 4.5 23 1,253
32 350 Electrostatic Precipitator - - 14,312 1,487
33 300 Boiler 174 140 24,360 2,568
34 301 Boiler Drainage Pit 33 9 297 -86
35 302 Bottom Ash Silo 48 48 2,304 -1,299
36 303 DCC Overflow Pit With Settling Basin 33 9 297 -1,147
37 800 Central Control & Electrical Swithgear Building 65 40 2,600 1,842
38 803 Oil Storage Day Tank - - 192 -1,795
39 600 Auxilary Boiler & Elctrical Room 22.7 20.5 465 -1,606
40 801 Transformer Yard 90 90 8,100 -296
41 804 500 KV switchyard Area 167 76 12,692 235
42 802 Emergency Diesel Generator Area
43 661 Condensate Polishing Plant
- - 10,348 9,286
44 250 Steam Turbine Building
45 404 Bunker Bay
46 251 H2 Generation Plant Building 10 10 100 562
47 654 Make Up Water Tank - - 142 255
48 662 Ammonia Waste Water tank - - 79 1,783
49 950 Unloading Ramp 80 20 1,600 2,007
50 651 Multi-Pupose Pump Shelter & Electrical Room 20 9 180 -41
51 750 Fire Fighting Water Pump House 36 9 324 2,782
52 658 Service/Fire fighting Water Basin 100 28 2,800 3,076
53 650 Water Treatment Plant / Desalination Plant 116 35 4,060 1,524
54 655 Desalination Plant Filtered Water basins 23 15 345 1,387
55 656 Seawater Clarifier - - 1,472 2,430
56 659 Pretreatment 45 25 1,125 3,263
57 653 Electrochlorination System Building 26 24 624 227
58 853 Service Water Pumping Station 18 11 198 2,880
59 652 Collection & Neutralization Basin 27 8 216 1,022
60 657 Regeneration Station 16 13 208 1,299
61 852 Seawater Screening & Pumping station 76 41 3,116 16,397
62 356 Sea Water FGD Pumping Station 20 22.5 450 700
63 860 Siphon Pits 68.5 35 2,398 -751
64 355 Seawater FGD Aeration Basin 100 68.5 6,850 2,403
65 359 Aeration Blower Shelter 140 27 3,780 -1,285
66 855 Weir Structure 78.5 35.6 2,795 -143
67 951 Plan Road - - 33,407 602

514,515,
68 516, 517 Conveyor - - 2,244 23

854,859,
69 851 Pipe Line - - 4,724 4,524

70 856 Cooling Water Outfall Channel - - 4,051 5,700


71 857 Cooling Water oOutfall Structure - - 1,997 8,050

Grand Total Area ( m2) 189,075 Grand To


Top Elevation Bottom Elevation
Volume
Actual Site Design Floor Design
Compare Remark
MSL + MSL + MSL ( m3 )
E F G H=CxD
3,365 2,800 2,500 118 78 40
3,353 2,800 2,500 256 204 52
3,157 3,100 2,800 86 210 -124
2,897 2,800 2,500 95 186 -91
2,300 2,800 2,500 -426 -
3,084 2,800 2,500 1,574 300 1,274
1,935 2,800 2,500 -1,582 297 -1,879
2,300 2,800 2,500 -20 181 -201
2,300 2,250 600 520 - -
2,096 2,250 600 4,169 - -
2,400 2,800 1,600 1,404 1,756 -352
2,300 2,800 2,500 -770 1,224 -1,994
2,300 2,800 2,500 -20 66 -86
2,350 2,800 1,650 182 84 98
2,350 2,800 1,650 178
1,734 -751
2,350 2,800 1,650 805
2,350 2,800 2,050 16 - -
2,400 2,800 2,050 56 84 -28
2,400 2,750 550 571 467 104
2,400 2,500 1,800 317 363 -46
2,450 2,500 1,800 195 210 -15
2,500 2,500 2,000 50 120 -70
2,500 2,500 1,800 524 181 343
2,450 2,500 1,800 359 424 -65
2,400 3,800 2,700 -270 348 -618
1,184 3,800 2,700 -1,487 533 -2,020
2,758 3,800 2,700 306 4,702 -4,396
2,951 3,800 2,600 794 587 207
2,452 3,800 1,700 1,499 3,457 -1,958
2,925 3,800 1,700 650 9,820 -9,170
2,953 3,800 1,700 28 36 -8
3,187 3,800 1,700 21,282 5,770 15,512
2,618 3,800 50 62,556 51,182 11,374
2,564 3,800 2,650 -26 1,624 -1,650
1,901 3,800 3,200 -2,993 180 -3,173
1,853 3,800 3,000 -341 - -
1,642 3,800 -200 4,789 10,071 -5,282
1,705 3,800 3,500 -345 - -
1,494 3,800 3,100 -747 179 -926
1,304 3,800 1,600 -2,398 10,276 -12,674
2,135 3,800 1,900 2,983 11,578 -8,595

3,336 3,800 -7,450 96,092 83,236 12,856

2,762 2,500 2,200 56 154 -98


2,455 2,500 2,200 36 134 -98
2,608 2,500 825 140 4,004 -3,864
1,507 1,500 -500 3,211 - -
2,259 2,800 2,300 -7 459 -466
2,282 2,800 -500 901 - -
2,576 2,800 -500 8,613 - -
2,524 2,800 1,000 6,187 3,024 3,163
2,387 2,800 1,000 479 3,983 -3,504
2,220 2,500 -210 3,578 1,557 2,021
2,763 2,800 -500 3,671 8,519 -4,848
2,327 2,800 2,100 142 357 -215
2,870 2,590 -10 570 1,369 -799
3,022 2,500 2,000 221 3,365 -3,144
3,099 2,500 1,800 270 2,802 -2,532
2,497 2,450 -13,900 51,093 81,877 -30,784
2,500 2,500 1,800 315 - -
1,049 2,500 1,800 -1,801 - -
1,603 2,500 -800 16,461 57,047 -40,586
815 2,800 2,100 -4,857 4,775 -9,632
1,657 2,500 1,800 -400 - -
2,252 Vary 1,650 20,111 1,774 18,337

2,023 2,750 2,000 52 - -

2,804 3,250 -3,220 21,371 32,388 -11,017

2,500 1,000 -4,700 23,091


19,155 20,012
2,500 2,700 -7,050 16,076

Grand Total Volume ( m3 ) 360,612

680896
320,284
47.0386782
2668
2798
2947
8413
2804.3333333
0.56
102.5
57.4
7000
2.2
0.5
0.3
1.4
0.21
In Ash Yard Unit #1&2

In Front of Administration Buliding Unit @1&2