Professional Documents
Culture Documents
Zwf22!02!051 Atm Over E1
Zwf22!02!051 Atm Over E1
Zwf22!02!051 Atm Over E1
ATM Over E1
Feature ID: ZWF22-02-051
V3.11.10
ZTE CORPORATION
NO. 55, Hi-tech Road South, ShenZhen, P.R.China
Postcode: 518057
Tel: +86-755-26771900
Fax: +86-755-26770801
URL: http://ensupport.zte.com.cn
E-mail: support@zte.com.cn
LEGAL INFORMATION
Copyright 2012 ZTE CORPORATION.
The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by
contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE
CORPORATION or of their respective owners.
This document is provided as is, and all express, implied, or statutory warranties, representations or conditions
are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,
title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the
use of or reliance on the information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications
covering the subject matter of this document. Except as expressly provided in any written license between ZTE
CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter
herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.
Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.
The ultimate right to interpret this product resides in ZTE CORPORATION.
Revision History
1-1
1-2
Hardware Requirement
Hardware Requirement is shown inTable 2-1.
NE Requirement
NodeB SA board
Software Requirement
Software Requirement is shown inTable 2-2.
GGSN NO
HLR NO
Topology
Topology is shown inFigure 2-1.
2-1
2-2
MSC/MGW - ZTE
None
HLR ZTE
None
RNC
1. Create a NODEB office
Path: View > Configuration Management > RNC Managed Element > RNC
Ground Resource Management > Transmission Configuration > Network
Element Information > Create
Path: View > Configuration Management > RNC Managed Element > RNC
Ground Resource Management > Transmission Configuration > Network
Element Information > Create > Basic Configuration
l NE office Id: 160(This ID must be unique for one RNC)
l MNC: 460(This is mobile network code)
l MCC: 15 (This is mobile country code)
l Net Element ID: 160(This is nodeb ID)
3-1
3-2
6. E1 Link configuration
Path: View > Configuration Management > RNC Managed Element > RNC
Ground Resource Management > Transmission Configuration > IMA Group
Configuration > IMA Link configuration
3-3
7. PVC configuration
Path: View > Configuration Management > RNC Managed Element > RNC
Ground Resource Management > Transmission Configuration > Network
Element Information > Node B XXX > PVC configuration
l PVC ID: 1(PVC identifier)
l Unit No: 5(the physics board slot number)
l ATM port NO :(The same with UTOPIA physics address)
l CVPI: 1(Integration parameter the same with NODEB parameter)
l CVCI: 40(Integration parameter the same with NODEB parameter)
l PVC Config-1->Service Type: CBR (Constant Bit Rate (CBR), Real-time-VBR
(RT-VBR), Non-Real-time VBR (NRT-VBR), Available Bit Rate (ABR), Unspecified
Bit Rate (UBR), Unspecified Bit Rate Plus (UBR+))
3-4
9. Path configuration
Path: View > Configuration Management > RNC Managed Element > RNC
Ground Resource Management > Transmission Configuration > Network
Element Information > Node B XXX > Path configuration
3-5
3-6
l Service Type: MIX(RT prefer bear SRB and real time service;NRT1 prefer bear
R99 non-real time;NRT2 prefer bear HSUPA non-real time service;NRT3 prefer
bear HSDPA non-real time service; MIX bear all service type)
l Owner identifier: Location office (If select location office it allocates CID values
from CID value 8 upwards; If select adjacent office it allocation CID values from
CID value 255 downwards)
3-7
3-8
3-9
Path: View > Configuration Management > RNC Managed Element > RNC Radio
Resource Management > Qos configuration > Basic Priority Transport Bearer
Type
3-10
NodeB
The NodeB data should be imported from configuration file. The following steps just show
the parameters scanned from LMT which are already imported to the SDR.
Figure 1-21 transmission configurations for ATM and IP.
3-11
4. AAL2 configuration
l PCV No.:1
l AAL2 Link ID: 1(integration parameter the same of the Path ID)
l VPI/VCI: 2/50(integration parameter the same of NODEB network configuration)
l Bandwidth: 14976(Same of NODEB network configuration parameter)
l Service Type: SRVC_CBR (integration parameter the same of NODEB network
configuration parameter)
5. SaalUNI configuration
l PVC No.:64501/64502/64503
3-12
7. NODEB ID configuration
3-13
3-14
12. USecter
3-15
3-16
4-1
4-2
5-1