Professional Documents
Culture Documents
Bill of Materials: Table of Contents Will Be Inserted Here On Update
Bill of Materials: Table of Contents Will Be Inserted Here On Update
PROJECT : _________________________________
Adress : _________________________________
_________________________________
_________________________________
_________________________________
_________________________________
_________________________________
Details of elements
Level 1 (+3.00m) 1 1
Total 1 1
This table contains the details of selected structural elements. The selection is partial.
CONCRETE
Detailed list
Level 1 (+3.00m)
Price
CONCRETE
Formwork