The document is a log of material submittals for an MEP project. It includes 9 initial submittals for items like air terminals, flexible ducts, refrigerant pipes, and drainage pipes. These were submitted on June 18, 2017 for a proposed 1+3 villa project by M/s Adnan Saffarini for M/s AL Fazeela Technical services. The log tracks review status and dates for the initial and possible resubmissions of each submittal.
The document is a log of material submittals for an MEP project. It includes 9 initial submittals for items like air terminals, flexible ducts, refrigerant pipes, and drainage pipes. These were submitted on June 18, 2017 for a proposed 1+3 villa project by M/s Adnan Saffarini for M/s AL Fazeela Technical services. The log tracks review status and dates for the initial and possible resubmissions of each submittal.
The document is a log of material submittals for an MEP project. It includes 9 initial submittals for items like air terminals, flexible ducts, refrigerant pipes, and drainage pipes. These were submitted on June 18, 2017 for a proposed 1+3 villa project by M/s Adnan Saffarini for M/s AL Fazeela Technical services. The log tracks review status and dates for the initial and possible resubmissions of each submittal.
EMPLOYER: M/s AL Fazeela Technical services APP APPROVED
ENGINEER: M/s Adnan Saffarini AAN APPROVED AS NOTED
PROJECT: Proposed B+G+1 villa UCR UNDER CONSULTANT REVIEW Date: 18.6.2017 AANR APPROVED AS NOTED RESUBMIT NAR NOT APPROVED, RESUBMIT MATERIAL SUBMITTALS - MEP LOG 1ST SUBMISSION 2nd SUBMISSION DATE APPROVAL DATE APPROVAL APPROVAL SL No: REF. DESCRIPTION REV. DATE REPLIED DATE REPLIED DATE REPLIED DATE REPLIED SUBMITTED STATUS SUBMITTED STATUS STATUS