DATA QUANTITY

PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)


SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 3.2 (1).(a) TIMBUNAN BIASA DARI SUMBER GALIAN

AREA
JARAK
SKETSA STA. TIMBUNAN
(m) (m 2)

0 + 000.00
0 + 010.00 10.00 1.83
0 + 020.00 10.00 7.20
0 + 025.00 5.00 5.86

0 + 050.00
0 + 060.00 10.00 17.25
0 + 070.00 10.00 5.48
0 + 080.00 10.00 0.32
0 + 090.00 10.00 0.00
0 + 100.00 10.00 0.00
0 + 110.00 10.00 0.00
0 + 120.00 10.00 0.00
0 + 130.00 10.00 0.00
0 + 140.00 10.00 0.00
0 + 150.00 10.00 0.65
0 + 160.00 10.00 0.59
0 + 170.00 10.00 0.59
0 + 180.00 10.00 0.56
TOTAL
AHAP II)

VOLUME
KOMULATIF
TIMBUNAN
(m 3) (m 3)

9.15 9.15
45.15 54.30
32.65 86.95

115.55 202.50
113.65 316.15
29.00 345.15
1.60 346.75
0.00 346.75
0.00 346.75
0.00 346.75
0.00 346.75
0.00 346.75
3.25 350.00
6.20 356.20
5.90 362.10
5.75 367.85
367.85

0.00
AL 0.00
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 3.2 (1).(a) TIMBUNAN BIASA DARI SUMBER GALIAN

AREA
JARAK
SKETSA STA. TIMBUNAN
(m) (m 2)

0 + 000.00
0 + 010.00 10.00 2.80
0 + 020.00 10.00 2.80
0 + 025.00 5.00 2.80

0 + 050.00
0 + 060.00 10.00 2.80
0 + 070.00 10.00 2.80
0 + 080.00 10.00 2.80
0 + 090.00 10.00 2.80
0 + 100.00 10.00 2.80
0 + 110.00 10.00 2.80
0 + 120.00 10.00 2.80
0 + 130.00 10.00 2.80
0 + 140.00 10.00 2.80
0 + 150.00 10.00 2.80
0 + 160.00 10.00 2.80
0 + 170.00 10.00 2.80
0 + 180.00 10.00 2.80
TOTAL
AHAP II)

VOLUME
KOMULATIF
TIMBUNAN
(m 3) (m 3)

14.00 14.00
28.00 42.00
14.00 56.00

28.00 84.00
28.00 112.00
28.00 140.00
28.00 168.00
28.00 196.00
28.00 224.00
28.00 252.00
28.00 280.00
28.00 308.00
28.00 336.00
28.00 364.00
28.00 392.00
28.00 420.00
420.00

0.00
AL 0.00
BACK UP DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 3.2 (2).(a) TIMBUNAN PILIHAN DARI SUMBER GALIAN

AREA
JARAK
SKETSA STA. TIMBUNAN
(m) (m 2)

0 + 000.00
0 + 005.00 5.00 2.80
0 + 010.00 5.00 2.80
0 + 015.00 5.00 2.80
0 + 020.00 5.00 2.80
0 + 025.00 5.00 2.80
0 + 030.00 5.00 2.80
0 + 035.00 5.00 2.80
0 + 040.00 5.00 2.80
0 + 045.00 5.00 2.80
0 + 050.00 5.00 2.80
0 + 055.00 5.00 2.80
0 + 060.00 5.00 2.80
0 + 065.00 5.00 2.80
0 + 070.00 5.00 2.80
0 + 075.00 5.00 2.80
0 + 077.20 2.20 2.80

0 + 107.20
0 + 110.00 2.80 2.80
0 + 115.00 5.00 2.80
0 + 120.00 5.00 2.80
0 + 125.00 5.00 2.80
0 + 130.00 5.00 2.80
0 + 135.00 5.00 2.80
0 + 140.00 5.00 2.80
0 + 145.00 5.00 2.80
0 + 150.00 5.00 2.80
0 + 155.00 5.00 2.80
TOTAL
HAP II)

VOLUME
KOMULATIF
TIMBUNAN
(m 3) (m 3)

7.00 7.00
14.00 21.00
14.00 35.00
14.00 49.00
14.00 63.00
14.00 77.00
14.00 91.00
14.00 105.00
14.00 119.00
14.00 133.00
14.00 147.00
14.00 161.00
14.00 175.00
14.00 189.00
14.00 203.00
6.16 209.16

7.84 217.00
14.00 231.00
14.00 245.00
14.00 259.00
14.00 273.00
14.00 287.00
14.00 301.00
14.00 315.00
14.00 329.00
14.00 343.00
AL 343.00
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 5.3 (2) PERKERASAN BETON SEMEN DENGAN ANYAMAN TULANGAN TUNGGAL

KODE DIMENSI JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)
Perkerasan Beton Arah Jayapura 01 7 0.2

Perkerasan Beton Arah Mambramo 02 7 0.2

TOTAL
SKETSA
HAP II)
UA (JAYAPURA)

NGAN TUNGGAL

PANJANG VOLUME
(m) (m 3)
77.20 108.08

47.80 66.92

175.00
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.1 (6) BETON MUTU SEDANG f'c 25 Mpa

KODE DIMENSI (m) JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)

Plat Lantai Kendaraan 1 9.5 0.241 1 2.2895


sub. Total 1
Sandaran (Kiri & Kanan) 1 0.25 0.2 2.00 0.05
2 0.05 0.4 2.00 0.01
3 0.2 0.2 2.00 0.04
4 0.05 0.05 2.00 0.0013
5 0.25 0.35 2.00 0.09
sub. Total 2
Trotoar (Kiri & Kanan) 1 1 0.25 2.00 0.25
sub. Total 3

TOTAL
SKETSA
HAP II)
UA (JAYAPURA)

PANJANG VOLUME
(m) (m 3)

25 57.24
sub. Total 1 57.24
25.00 2.5
25.00 0.5
25.00 2
25.00 0.0625
25.00 4.375
sub. Total 2 9.44
27.00 13.5
sub. Total 3 13.50

TOTAL 80.18
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.1 (7).(a) BETON MUTU SEDANG f'c 20 Mpa

DIMENSI (m) JUMLAH


URAIAN KODE LUAS (m 2)
a b c d e (buah)

Abutment (Kiri dan Kanan Jembatan) 1 0.75 0.35 2.00 0.26


2 1.00 0.55 2.00 0.55
3 0.50 1.08 2.00 0.54
4 0.35 1.38 2.00 0.48
5 0.25 0.38 2.00 0.05
6 1.15 1.00 2.00 1.15
7 0.80 4.00 2.00 3.20
sub. Total 1
Wing Wall / Dinding Sayap 1 0.95 3.00 4.00 2.85
2 2.10 2.80 4.00 5.88
3 0.25 0.38 4.00 0.05
4 0.35 1.68 4.00 0.59
5 0.55 1.68 4.00 0.46
6 0.90 1.50 4.00 1.35
sub. Total 2
Plat Injak 1 0.20 7.00 2.00 5.00
2 0.20 0.25 0.05 7.00 2.00
sub. Total 3
Balok Induk

sub. Total 4
Diagfragma

sub. Total 5
Isian Tiang Pancang 1 0.4 36.00
sub. Total 6
TOTAL
SKETSA
HAP II)
UA (JAYAPURA)

PANJANG/ VOLUME
TEBAL (m) (m 3)

10.50 5.51
10.50 11.55
10.50 11.34
10.50 10.14
10.50 1.00
10.50 24.15
10.50 67.20
sub. Total 1 130.89
0.35 3.99
0.35 8.23
0.35 0.07
0.35 0.82
0.35 0.65
0.35 1.89
sub. Total 2 15.65
14.00
0.16
sub. Total 3 14.16
116.20

sub. Total 4 116.20


14.11

sub. Total 5 14.11


7.00 31.67
sub. Total 6 31.67
TOTAL 322.68
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.1 (8) BETON MUTU RENDAH f'c 15 Mpa

KODE DIMENSI JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)
Lantai Kerja Abutmen 0.15 4.5 2 0.675
sub. Total 1
Sloof Beton Talud (Kiri) 0.3 0.4 1.00 0.12
Sloof Beton Talud (Kanan) 0.3 0.4 1.00 0.12
sub. Total 2
Balok Beton Talud (Kiri) 0.3 0.3 1.00 0.09
Balok Beton Talud (Kanan) 0.3 0.3 1.00 0.09
sub. Total 3
Tiang Kolom Beton Talud (Kiri) 0.3 0.3 1.00 0.09
Tiang Kolom Beton Talud (Kanan) 0.3 0.3 1.00 0.09
sub. Total 4
Dinding Pengaman (4 Buah) 1 0.2 0.4 0.1 4.00 0.03
2 0.4 0.1 4.00 0.04
3 0.3 0.55 4.00 0.17
4 0.4 0.25 4.00 0.10
sub. Total 5

TOTAL
SKETSA
Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :
Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksan
Pejabat Pembuat Komitmen 10 0 PT. CARIBIAN CITRA PE
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT 0 DANIAL, S.Kom


NIP.19660110 199703 1 002 0 Direktur Utama
HAP II)
UA (JAYAPURA)

PANJANG VOLUME
(m) (m 3)
10.5 14.175
sub. Total 1 14.18
67.80 8.14
57.80 6.94
sub. Total 2 15.07
67.80 6.10
57.80 5.20
sub. Total 3 11.30
51.32 4.62
40.55 3.65
sub. Total 4 8.27
3.00 0.36
3.00 0.48
2.90 1.91
3.00 1.20
sub. Total 5 3.95

TOTAL 52.77
Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
BACK UP DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.3 (1) Baja Tulangan U24 Polos & DIVISI 7.3 (3) Baja Tulangan U32 Ulir

Diameter & Total


No. Kode Panjang Tulangan (cm) Jumlah
Tipe Jarak Panjang
Tulangan Tulangan
Tulangan (mm) Tulangan (m)
a b c d e f kait
WING WALL (4 Buah)

W1 A D 16 - 250 430 30 20 15 35 16 5.46 48.00


W2 B D 16 - 250 35 410 16 4.61 48.00
W2a C D 16 - 250 167 335 290 16 8.08 8.00
W3 D D 13 - 125 20 290 20 13 3.43 124.00
W3a E D 13 - 125 290 13 3.03 124.00
W4 E D 13 - 125 20 13 0.33 720.00
sub total 3
PLAT INJAK (2 Buah)
P1 F D 13 - 200 490 15 10 5 13 5.33 72.00
P2 B D 13 - 200 10 490 13 5.13 72.00
P3 D 12 - 200 10 690 10 12 7.22 52.00
P4 E 12 - 200 690 12 7.02 52.00
sub total 4
TIANG PANCANG (36 Buah)
T1 G D 19 25 690 19 7.34 360.00
T2 H 12 - 200 40 12 1.38 1260.00
sub total 5
TALUD (KIRI DAN KANAN)
S1 E 16 12560.0 64 126.24 6.00
S2 I 12 - 150 20 30 20 30 6 1.06 497.00
K1 E 16 9187 216 94.03 4.00
K2 I 12 - 150 20 20 20 20 6 0.86 416.00
B1 E 16 12560.0 64 126.24 4.00
B2 I 12 - 150 20 20 20 20 6 0.86 497.00
sub total 6
TOTAL BERAT PENULANGAN
SKETSA
5d

d
1.25

TIPE F
3.5d

TIPE D
b

1.25d
b
TIPE C TIPE E
TIPE I TIPE
1.25d

TIPE A TIPE B
G
Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :
Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Pejabat Pembuat Komitmen 10 ..................................................... PT. CARIBIAN CITRA PERK
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT ................................................... DANIAL, S.Kom


NIP.19660110 199703 1 002 .................................... Direktur Utama
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.3 (1) Baja Tulangan U24 Polos & DIVISI 7.3 (3) Baja Tulangan U32 Ulir

Diameter & Total


No. Kode Panjang Tulangan (cm) Jumlah
Tipe Jarak Panjang
Tulangan Tulangan
Tulangan (mm) Tulangan (m)
a b c d e f kait
ABUTMEN (2 Buah)
A1 A D 16 - 110 215 25 195 16 4.51 190.00
A2 F D 16 - 150 1030 16 10.46 16.00
A3 B D 16 - 150 85 177 45 16 3.23 140.00
A4 F D 16 - 150 1030 16 10.46 20.00
B1 C D 25 - 150 60 270 65 270 60 25 7.50 140.00
B2 F D 25 - 150 1030 25 10.55 24.00
B3 F D 16 - 150 103 16 1.19 140.00
C1 D D 16 - 150 128 150 16 2.94 140.00
C2a F D 16 - 300 128 16 1.44 140.00
C2 F D 16 - 300 90 16 1.06 210.00
C3 F D 16 - 150 1030 16 10.46 24.00
D1 F D 25 - 150 390 25 4.15 140.00
D2 F D 16 - 300 1030 16 10.46 40.00
D3 F D 16 - 300 70 16 0.86 1260.00
D4 E D 25 - 150 70 390 70 25 5.55 140.00
D5 F D 16 - 300 1030 16 10.46 40.00
sub total 1
PLAT LANTAI KENDARAAN, BALOK INDUK, DIAGFRAGMA, SANDARAN & TROTOAR
PL1(d,f,h) F 16 - 200 1050 8 10.58 198.00
PL2 (c,e,g) F 16 - 200 1050 8 10.58 198.00
PL3 (b) F 16 - 150 940 16 9.56 204.00
PL4 (a) G 16 - 150 22 900 22 16 9.60 204.00
S1 H 16 - 200 20 43 36 16 16 1.31 408.00
S2 I 16 - 200 13 7 63 21 15 16 1.35 408.00
S3 F 16 - 200 15 16 0.31 1224.00
BI1 D 25 - 150 25
BI2
D1
T1 F 16 - 200 1050 8 10.58 60.00
T2 J 16 - 200 14 90 15 90 16 2.25 408.00
sub total 2
SKETSA

TIPE G

TIPE H
TIPE H
TIPE D
TIPE A TIPE B
TIPE C

TIPE E TIPE F TIPE J

Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Pejabat Pembuat Komitmen 10 PT. CAKRA BUANA TOTALMANDIRI KONSULTAN PT. CARIBIAN CITRA PER
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT MASDAR M.SYAM,ST DANIAL, S.Kom


NIP.19660110 199703 1 002 Site Engineer Direktur Utama
(TAHAP II)
NSI PAPUA (JAYAPURA)

ngan U32 Ulir

Berat Per Berat Total Tulangan


Meter (kg)
(kg/m)
U32 U24
###

1.58 414.09
1.58 349.62
1.58 102.13
1.58 672.01
1.58 593.64
1.58 375.41
sub total 3 2506.89

1.04 399.11
1.04 384.13
1.04 390.46
1.04 379.64
sub total 4 783.24 770.10

2.23 5892.55
0.89 1543.7608
sub total 5 5892.55 1543.76

1.58 1196.7552
0.89 468.8698
1.58 594.2696
0.89 318.4064
1.58 797.8368
0.89 380.4038
sub total 6 3756.54
L BERAT PENULANGAN 46271.00 32713.55
5d

d
1.25

3.5d

a
b

Diameter

1.25d
a

Diameter
1.25d

TIPE TIPE H
G
Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
(TAHAP II)
NSI PAPUA (JAYAPURA)

ngan U32 Ulir

Berat Per Berat Total Tulangan


Meter (kg)
(kg/m)
U32 U24
###
1.58 1353.90
1.58 264.43
1.58 714.48
1.58 330.54
3.85 4042.50
3.85 974.82
1.58 263.23
1.58 650.33
1.58 318.53
1.58 351.71
1.58 396.64
3.85 2236.85
1.58 661.07
1.58 1712.09
3.85 2991.45
1.58 661.07
sub total 1 37088.31
AN & TROTOAR
1.58 3309.8472
1.58 3309.8472
1.58 3081.3792
1.58 3094.272
1.58 844.4784
1.58 870.264
1.58 599.5152
19164.68
7870.28
1209.84
1.58 1002.984
1.58 1450.44
sub total 2 26643.15

TIPE H
TIPE H

TIPE I

Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER :
KEGIATAN :
PAKET PEKERJAAN :
TAHUN ANGGARAN :
NOMOR KONTRAK :
TANGGAL KONTRAK :
PENYEDIA JASA :

ITEM : DIVISI 7.4.(3).d Penyediaan Struktur Jembatan Rangka Baja Panjang 30 m, Lebar 9 m

KODE DIMENSI JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)

Peyediaan Struktur Jembatan Rangka Baja 1.00


Bentang 30 m

TOTAL
SKETSA
JEMBATAN KALI SENGGI
HAP II)

PANJANG VOLUME
(m) (buah)

30.40 1.00

TOTAL 1.00
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.4.(4).d Pemasangan Jembatan Rangka Baja Standar Panjang 30 m, Lebar 9 m

KODE DIMENSI JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)

Pemasangan Jembatan Rangka Baja Standar 1.00


Bentang 30 m

TOTAL
SKETSA
JEMBATAN KALI SENGGI

Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksan
Pejabat Pembuat Komitmen 10 PT. CAKRA BUANA TOTALMANDIRI KONSULTAN PT. CARIBIAN CITRA PE
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT MASDAR M.SYAM,ST DANIAL, S.Kom


NIP.19660110 199703 1 002 Site Engineer Direktur Utama
HAP II)
UA (JAYAPURA)

m, Lebar 9 m

PANJANG VOLUME
(m) (buah)

30.40 1.00

TOTAL 1.00
Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.9 (1) PASANGAN BATU

AREA TIMBUNAN
JARAK
SKETSA STA. KIRI KANAN
(m) (m )
2
(m 2)

0 + 000.00
0 + 005.00 5.00 0.00 0.00
0 + 010.00 5.00 0.00 0.00
0 + 015.00 5.00 0.00 0.00
0 + 020.00 5.00 0.00 0.00
0 + 025.00 5.00 0.00 0.00
0 + 030.00 5.00 0.00 0.00
0 + 035.00 5.00 0.00 0.00
0 + 040.00 5.00 2.24 0.00
0 + 045.00 5.00 2.58 0.00
0 + 050.00 5.00 2.80 2.11
0 + 055.00 5.00 3.00 2.80
0 + 060.00 5.00 2.80 2.80
0 + 065.00 5.00 3.31 3.48
0 + 070.00 5.00 3.64 3.70
0 + 075.00 5.00 3.64 3.70
0 + 077.20 2.20 0.00 0.00

0 + 107.20
0 + 110.00 2.80 4.93 4.07
0 + 115.00 5.00 4.93 4.07
0 + 120.00 5.00 4.93 3.53
0 + 125.00 5.00 4.93 3.63
0 + 130.00 5.00 3.89 3.07
0 + 135.00 5.00 2.80 2.80
0 + 140.00 5.00 0.00 0.00
0 + 145.00 5.00 0.00 0.00
0 + 150.00 5.00 0.00 0.00
0 + 155.00 5.00 0.00 0.00
TOTAL

Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Pejabat Pembuat Komitmen 10 PT. CAKRA BUANA TOTALMANDIRI KONSULTAN PT. CARIBIAN CITRA PERK
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT MASDAR M.SYAM,ST DANIAL, S.Kom


NIP.19660110 199703 1 002 Site Engineer Direktur Utama
AHAP II)

VOLUME
KOMULATIF
TIMBUNAN
(m 3) (m 3)

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
5.60 5.60
12.06 17.66
18.74 36.40
26.78 63.17
28.50 91.67
30.97 122.64
35.31 157.95
36.69 194.64
8.07 202.71

12.59 215.30
44.98 260.28
43.65 303.92
42.55 346.47
38.80 385.27
31.41 416.68
14.00 430.68
0.00 430.68
0.00 430.68
0.00 430.68
430.68
AL 430.68

Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.14.(1) Papan Nama Jembatan

KODE DIMENSI (m) JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)

Pengadaan dan Pemasangan Papan Nama 0.4 0.6 2.00


Jembatan

TOTAL
SKETSA
Papan Nama Jembatan

Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksan
Pejabat Pembuat Komitmen 10 PT.CAKRA BUANA TOTALMANDIRI KONSULTAN PT. CARIBIAN CITRA PE
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT MASDAR M.SYAM,ST DANIAL, S.Kom


NIP.19660110 199703 1 002 Site Engineer Direktur Utama
HAP II)
UA (JAYAPURA)

PANJANG VOLUME
(m) (buah)

2.00

TOTAL 2.00
Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
BACK UP DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.15.(5) Pembongkaran Rangka Baja

KODE DIMENSI (m) JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)

Pembongkaran Jembatan Lama

TOTAL
SKETSA
Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :
Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksan
Pejabat Pembuat Komitmen 10 PT. CAKRA BUANA TOTALMANDIRI KONSULTAN PT. CARIBIAN CITRA PE
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT MASDAR M.SYAM,ST DANIAL, S.Kom


NIP.19660110 199703 1 002 Site Engineer Direktur Utama
HAP II)
UA (JAYAPURA)

PANJANG VOLUME
(m) (m 2)

125.00

TOTAL 125.00
Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
BDATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km

KODE DIMENSI (m) JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)

Pengangkutan hasil bongkaran jembatan lama

TOTAL
SKETSA
Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :
Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksan
Pejabat Pembuat Komitmen 10 PT. CAKRA BUANA TOTALMANDIRI KONSULTAN PT. CARIBIAN CITRA PE
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT MASDAR M.SYAM,ST DANIAL, S.Kom


NIP.19660110 199703 1 002 Site Engineer Direktur Utama
HAP II)
UA (JAYAPURA)

PANJANG VOLUME
(m) (m 3/km)

125.00

TOTAL 125.00
Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
DATA QUANTITY
PAKET PENINGKATAN JEMBATAN KALI SENGGI (TAHAP II)
SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI PAPUA (JAYAPURA)
KEGIATAN :
PAKET PEKERJAAN : PENINGKATAN JEMABTAN KALI SENGGI (TAHAP II)
TAHUN ANGGARAN : 2016
NOMOR KONTRAK : 05/JB.SENGGI-THP.II/PPK.10/2016
TANGGAL KONTRAK : 06 JANUARI 2016
PENYEDIA JASA : PT. CARIBIAN CITRA PERKASA

ITEM : DIVISI 8.4.(5) Patok Pengarah

KODE DIMENSI (m) JUMLAH


URAIAN LUAS (m 2)
AREA a b c d e (buah)

Patok Pengarah 120.00

TOTAL
SKETSA
Disetujui oleh : Diperiksa Oleh : Dibuat Oleh :
Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksan
Pejabat Pembuat Komitmen 10 PT. CAKRA BUANA TOTALMANDIRI KONSULTAN PT. CARIBIAN CITRA PE
Provinsi Papua (Jayapura)

ANDARIAS TANGKE, ST, MT MASDAR M.SYAM,ST DANIAL, S.Kom


NIP.19660110 199703 1 002 Site Engineer Direktur Utama
HAP II)
UA (JAYAPURA)

PANJANG VOLUME
(m) (buah)

120.00

TOTAL 120.00
Dibuat Oleh :
Kontraktor Pelaksana
PT. CARIBIAN CITRA PERKASA

DANIAL, S.Kom
Direktur Utama
PEKERJAAN TAMBAHAN

3.1.1 Galian Biasa


3.1.3 Galian Struktur dengan Kedalaman 0 - 2 meter
7.12.(2) Perletakan Elastomer jenis 1 (300 x 350 x 36)
7.13. Sandaran (Railing)