START FINISH Schedule Hydrotest Welder

Incoming Jambo Bale CPP-MTR 5/23/2017 10/19/2017 API 1104 for Material API 1104 for Material ASME IX for Material
Material Actual 142.6 hari 149 hari Sales Gas 1A-1E welder API 5L Gr.X60 API 5l Gr.X60 API 5l Gr.B A106 Gr.B
10/20/2017 10/31/2017
10/7/2017 10/18/2017 1A Orang 2A Orang 3A Orang
Actual 9.12 hari 11 hari Piping sales gas 3A welder ASME IX 1B Orang 2B Orang 3B Orang
5/20/2017
Jambo Bale MTR-PTG 8/29/2017 9/11/2017 1C Orang 2C Orang
9/12/2017 9/16/2017
Actual 12.24 hari 13 hari Sales Gas 1F welder API 5L Gr.X60 1D Orang 2D Orang
JR-01 6/22/2017 7/25/2017 7/31/2017 2A,2B,2E, 1E Orang 2E Orang
9/4/2017 9/24/2017
Actual 33 hari 39 hari Trunkline 2F welder API 5L Gr.B 1F Orang 2F Orang
8/1/2017 8/10/2017 2A,2B,2E,
Actual 8.28 hari 9 hari Flowline 2F welder API 5L Gr.B
9/12/2017 9/16/2017
8/9/2017 9/11/2017
Actual 32.4 hari 33 hari Piping 3B welder ASME IX
JR-02 6/22/2017 9/1/2017 9/7/2017 2C,2D,2A,
9/20/2017 10/11/2017
Actual 54.05 hari 77 hari Trunkline 2B,2E welder API 5L Gr.B
8/11/2017 8/14/2017
Actual 1.44 hari 3 hari Flowline 2F welder API 5L Gr.B
6/20/2017 9/20/2017 9/24/2017
8/18/2017 9/19/2017
Actual 32.4 hari 32 hari Piping 3A welder ASME IX
JR-38A 9/20/2017 9/26/2017
Actual 6 hari 6 hari Pipeline 2C,2D welder API 5L Gr.B
9/12/2017 9/14/2017
Actual 1.98 hari 2 hari Piping 3B welder ASME IX
10/31/2017
JR-40A 9/27/2017 10/6/2017
Actual 8.52 hari 9 hari Pipeline 2C,2D welder API 5L Gr.B
9/20/2017 9/23/2017
Actual 2.22 hari 3 hari Piping 3A welder ASME IX