Operation of Bilge System: Engine Room
Operation of Bilge System: Engine Room
Operation of Bilge System: Engine Room
ENGINE ROOM:
1. OPEN INLET V/V FOR 100PPM SEPARATORE TANK
2. OPEN V/V 80V294008 100PPM CLEAN BILGE TANK INLET
3. OPEN 100A114001 100PPM SEPARATOR PUMP INLET
4. OPEN RESPECTIVE BILGE WELL .
5. RUN THE BILGE PUMP,CHECK THE PRESSURE.
NOTE: All engine room bilge must pass through 100ppm and
15ppm separators.
CARGO HOLDS:
1. IN PORT BILGE PUMPING TO OVERBOARD SHOULD BE
AVOIDED
2. BILGE WATER PUMPED TO BILGE HOLDING TANK
USING BILGE EJECTOR
3. THIS WILL BE DONE BY USING G/S PUMP
3. START PS SW PUMP