Professional Documents
Culture Documents
RF Optimisation PDF
RF Optimisation PDF
Safe harbor
Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains
predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the
future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and
does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action
taken on the basis of information contained herein.
For a discussion of the risks and uncertainties that may cause results to differ, you should review GTLs filings with stock exchanges, including the annual report and quarterly disclosures.
Network Planning, Design & Optimisation
Core Offerings
2
Imperatives for Optimisation
3
Optimisation Overview
4
Need for optimisation
5
Network Lifecycle
Licence
Award
Swap Network
Management
Planning
(If required) Network Lifecycle
Continuous Network
Optimisation
Rollout
Pre Launch
Optimisation
6
RF Optimisation
(If required)
- BTS upgrade
Virtual Optimisation
- BTS re-homing Centre
- BSC re-parenting
- Transmission Re-engineering
7
Pre Launch Optimisation
Pre Launch
Optimisation Objectives
Continuous
Optimisation Low traffic (Pre-launch or launch)
Swap
Management
8
Optimisation Process Single site verification
Site
Pre Launch Identification
Optimisation
RF Site Coverage
Audit Verification
Continuous
Optimisation Reconfiguration
Parameter
verification
Fail
Swap Problem
Management Analysis
Site Pass
Acceptance
9
Optimisation Process Drive Test Based
Cluster Cluster
Stimulation Preparation
Continuous
Optimisation Drive Test
Fail
Swap Problem
Management Analysis
Cluster Pass
Analysis
10
Cluster Analysis
Determine clusters for acceptance
Analysis
Remodelling
Reconfiguration
Parameters
Neighbors
Report Hardware
Requirements
11
Cluster Reconfiguration
Pre Launch
Optimisation Hardware Cell parameter
Optimisation optimisation
Masthead Amplifiers
Swap
Performance Monitoring
Management
12
Pre Launch Optimization
Drive Testing
Continuous KPI Definition
Optimisation Drive Analysis
KPI Reporting
Functionality Modelling
Asses
Network
Training Reconfigure
Model Calibration
13
KPIs to be Monitored
Based on performance of a Network & Cell (TBD : To Be Decided)
SDCCH
3% Performance
Blocking
14
KPIs to be Monitored
Based on performance of a Network & Cell (TBA : To Be Accepted)
Data
TBA Performance
Accessibility
TBA
Downlink Rx Qual Performance
TBA
Uplink Rx Qual Performance
TBD upon
TBA checking trend
Cell Level FER Performance to maintain the
performance of
Data Through TBA the network
Performance
output and to improve
15
Reports
Deliverables
Pre Launch
Optimisation Pre Launch Optimization
Swap
Management Cell / cluster Optimisation and tuning to reach acceptance criteria.
16
Reports
Pre Launch
Network Analysis and Optimisation Report.
Optimisation
Cell, cluster, Network drive test reports from post processing tool.
Acceptance Report.
Swap
Interference Measurement.
Management
17
Continuous Optimisation
Continuous
Optimisation Minimisation of integration Issues
18
Continuous Optimisation
Continuous
Optimisation Fault
Performance
Resolution
Cell
Prioritisation
Swap
Management
Fault Reports
19
Optimisation Process Drive Test Based
Determine clusters for acceptance
Characterise performance
Pre Launch
Optimisation Ensure correct site configuration
Parameter Setting
Neighbors
Powered
Stable
Drive tests
Continuous Process data
Optimisation Call statistics
Key measurement events
Neighbor analysis
Key measurement data
Analysis
Remodelling
Swap
Management Reconfiguration
Parameters
Neighbors
Report Hardware
Requirements
20
Cluster Reconfiguration
Pre Launch
Optimisation Hardware Cell parameter
Optimisation optimisation
Masthead Amplifiers
Swap
Management Performance Monitoring
21
Continuous Optimization
Benchmarking
Cell Prioritisation
Continuous Process Control
Optimisation
Config Fault Resolution
Management
KPI Reporting
Swap Change
Functionality recommend
Management
Asses
Training Network
Reconfigure
22
KPIs to be Monitored
Based on performance of a Network & Cell (TBD : To Be Decided)
SDCCH
3% Performance
Blocking
23
KPIs to be Monitored
Based on performance of a Network & Cell (TBA : To Be Accepted)
Data
TBA Performance
Accessibility
TBA
Downlink Rx Qual Performance
TBA
Uplink Rx Qual Performance
TBD upon
TBA checking trend
Cell Level FER Performance to maintain the
performance of
Data Through
TBA the network
output Performance
and to improve
24
Reports
Deliverables
Pre Launch
Optimisation
Continuous Optimisation
25
Reports
Dynamic full and half rate, Cell load sharing,Hierarchy cell structure,
Dynamic allocation of SDCCH.
Swap
Management
26
Swap Management
Pre Launch
Optimisation Objectives
Continuous
Optimisation
High traffic (Pre-Cut and Post Cut)
Swap
Management
27
Swap Management
Pre Launch
Optimisation Swap Planning
Default Parameter
Continuous
Optimisation Parameter Mapping
Swap
Management
28
Swap Process Pre / Post verification
Site
Pre Launch Identification
Optimisation
RF Site Coverage
Audit Verification
Continuous
Optimisation Reconfiguration
Parameter
verification
Fail
Swap Problem
Management Analysis
Site Pass
Acceptance
29
Swap Process Cluster Based
Cluster Cluster
Stimulation Preparation
Continuous
Optimisation Drive Test
Fail
Swap Problem
Management Analysis
Cluster Pass
Analysis
30
Cluster Analysis
Determine clusters for acceptance
Drive Test
Results Characterise performance
Call statistics
Key measurement events
Neighbor analysis
Key measurement data
Analysis
Remodelling
Reconfiguration
Parameters
Neighbors
Report Hardware
Requirements
31
Cluster Reconfiguration
Pre Launch
Optimisation Hardware Cell parameter
Optimisation optimisation
Masthead Amplifiers
Swap
Management Performance Monitoring
32
Swap Optimization
Functionality Modelling
Asses
Network
Training Reconfigure
Swap
Management Cluster Monitoring
Config Management
Model Calibration
33
KPIs to be Monitored
Based on performance of a Network & Cell (TBA : To Be Accepted)
SDCCH
Improve Performance
Blocking
Improve
CSR (%) Performance
Improve
CSSR (%) Performance
TBD upon
Improve checking trend
Cell Level DCR (%) Performance to maintain the
performance of
TCH Blocking
Improve the network
Performance
and to improve
34
KPIs to be Monitored
Based on performance of a Network & Cell
Data
Improve Performance
Accessibility
Improve
Downlink Rx Qual Performance
Improve
Uplink Rx Qual Performance
TBD upon
Improve checking trend
Cell Level FER Performance to maintain the
performance of
Data Through
Improve the network
output Performance
and to improve
35
Reports
Deliverables
Pre Launch Swap Management
Optimisation
Swap Planning Report.
36
Subjects to Investigate
Non-Working sites/sectors or TRXs
Coverage holes
Continuous
Optimisation C/I, C/A analysis
Drop Calls
Missing Neighbors
37
Subjects to Investigate
One-way neighbors
Pre Launch
Ping-Pong Handovers
Optimisation
Not happening handovers
Faulty Installations
Continuous
Optimisation
Sites not operational
Faulty TRX
BA list error
Swap
BSIC, HSN, MAIO Plan
Management
Hopping ON or OFF
38
Recommendations
Defining missing neighbor relations
Adjusting HO Margins
MHA/TMA adds
39
Virtual Optimisation Centre
40
Virtual Optimisation Centre
Pre Launch
Optimisation
Activities Off shore On shore
Benchmarking
Data Collection
Continuous
Optimisation RF and Transmission Planning
Transmission Network Verification
RF / Line of Sight Surveys
CW Testing and Model Tuning
Nominal Cell Planning
Swap
Management Frequency Scanning
Optimisation
41
Virtual Optimisation Centre
Benefits
Pre Launch
Optimisation Low fixed Cost regardless of the project location.
42
Value Proposition
43
Case Studies & Capabilities
44
Case Study 1
45
Case Study 2
Project Scope :
SoW conferred and accepted by GTL have been as follows:
About the Client : Perform pre swap drive test for all 41 sites.
Hutch is one of the leading gsm operator in India Prepared proficient database for Nokia
having licenses spanning all over India. Hutch is Add and delete Neighbor list.
working with gsm 900 band and wants to expand their Verification of antenna locations and azimuth.
network as the demand grow. So to meet quality and Verifies existing Frequency Plan, recommend the changes
coverage there is need to swap old ZTE system with required.
some new updated system, which can support the Download the database to OMC and verify the dump.
gsm, gprs, edge and easily upgraded to 3G. Perform Drive Tests for sites verification on Swap night.
Hutch selected Nokia as OEM for the core part of their Perform the post swap drive test for all 45 sites.
network. Conduct Acceptance Test Procedure (ATP) with end customer.
Nominal Cell Planning for New 417 sites
Business Challenge : RF survey, LOS survey and Drive Test for New Sites.
Nokia wanted to have resources in the outsourcing MW radio link planning for MW transmission links.
domain increase their strength. As GTL had done lots Provide a solution for the Hutch subscribers complaints.
of work with Nokia in India so GTL seems to be Preparation of 2 Mbit/s transmission plan including link capacity
perfectly poised to rise to the need. We became calculations, timeslot allocation and ET planning
partner of choicer for Nokia to perform RF tasks in the Maintain the Network quality by daily monitoring KPI.
swap roll out process. From March 2005 to Till Date
for performed allocated tasks creditably. A few points Value Delivered :
of project: All swaps are mostly conducted at night there is around 6 sites
GSM 900 Networks. swap per day. As soon as swap sites bring on air our drive test
45 sites to be swap from ZTE to Nokia. is ask to conduct the site verification drive test at each cell the
342 New Nokia Ultra BTS test includes database verification, sector swapping, handover
Coverage includes cities and boundaries. testing, neighbor list verification, call termination. After
Network with 19 BSCs and two switch AXE 10 from finishing the swap now optimization is started on network level,
Nokia.- to meet the KPI daily statistic report are generated with the
CSSR 94%, SDCCH Drop 2%, Handover success help of Business object and results are discussed with the
rate 94%, Call drop rate 2.5%. customer and also suggest the necessary changes.
46
GTL's Network Customer Engagement
47
International Presence
Europe:
UK
France
Middle East: AsiaPacific:
Ireland
UAE Malaysia
Sweden
KSA Thailand
Switzerland
Oman China
Americas: Taiwan
Qatar
US Indonesia
Kuwait
Australia
Singapore
Philippines
New Zealand
South Asia
India
Nepal
Africa: Bhutan
Maldives
Nigeria
Sri Lanka
South Africa
Bangladesh
Guinea Conakry
Mauritius
International Office
Projects Undertaken