6 Station: Ref - No.cHN/Poc - Rripping/c-4"00

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

,/

Ref.No.cHN/Poc.rripping/c-4"00 05 8U Date: .l 7 FEB ?fII5'


EVENT ANALYSIS REPORT
UNIT NO : 6 ITPS: Chandrapur Super Thermal Power Station Unit Capacity: 500 MW
1. *HO Code: Station Code: CSTPS U6 Time- Date- No. of days from last
T07 2014-15 18:25 Hrs 01/0 LlzDLs sync.:- 70.5

Last Overhaul (AOH) synchronisation Date 2310812012 861 .5 Days 2.36 Years
2. Operating conditions at the time of Event a-
r

Load MW Coal Cycles in seryice Oil Suppoft


360 A,B,D,E,H NiI
3. Nature of Event :
Unit tripped manually due to sudden tripping of Unit Board-6A on under voltage because of heavy jerk on 400KV
Bus-I (System Problem)

4. Name of First Up, Main Protections & protection on which GCB tripped:
Boiler hand tripped, Turbine tripped on interlock, Generator tripped on reverse power protection,

5 A) Obseruations :-
Unit was running at 360 MW load with coal mill A,B,D,F,H. CEP- A & B, in service. At 18:23 Hrs Heavy jerk noticed
causing tripping of Unit board-6A on under voltage. Due to this auxilliaries on Unit board-6A such as FD-6A, BCW-
6A, CEP-6A & 68, Coal Mill 6A & 6E tripped. Due to this load variation observed and unit withdrawn by Boiler manual
tripping.

5 B) Remedial Action/work done :-


On Inspection Unit board-6A found charged and voltages were normal. SE-13 board through which Unit Board-6A &
6D was charged checked and found normal. SAT-4A & 48 transformers and all station boards found checked found
charged and voltages found normal,
t
6. Root Cause Analysis :-
Heavy jerk on 400 KV Bus:I causes tripping of Unit board-6A on under voltage.

7. Preventive action suggested (Shoft Term) :- Nil

8. Preventive action suggested (Long Term) :- Nil

9. Similar event occurred last time:


u# ---- Time r rrrr Date:
Nil

9A. Implementation Status of Long Term/Shoft Term measures stated at Sr No 9:- r


Shoft Term:
Long Term:

10. Boiler lighted up Time - 20:37 Hrs Date- 0U0L|20L5


11. T-A Set Synchronised Time - 00:06 Hrs Date- 0210L120L5
L2. Remark :- Nil

I
i
i

chiert ineer (O&M)


CSTP /Chandrapur.

13. Recomendations of Works Section:


1. Procurement/Replacement plan:
2. Operational Error:
3. Delay in Maintenance:
4. Delay in bringing back the Unit:
5. Training of Staff:

6. whether remedial action is completed satisfactory & point is ctosed :

CEIDy C E (Works)
*HO Code will be given by Works Section.