TORRENT POWER LIMITED

DGEN MEGA POWER PROJECT


TAL: VAGRA; DIST: BHARUCH

Message 37/2017 Date/Time 20-05-2017 07:30


No.

From: Shift Manager, Fax: 02641202513


DGEN MEGA POWER PROJECT
To: rtamc_operation@powergrid.co.in Fax:
Copy DGENOPERATIONS Fax:
To:
Message

LCP is requested on 400 KV DGEN Navsari Line No 1 for which details is given below.

Purpose: OFF LINE WASHING OF 406 BAY EQUIPMENTS (ISOLATOR A, B, C & D, CB, CT,
EMVT, CVT, BPI, LA ETC.), GANTRY TOWER INSULATORSWORK WILL INCLUDE
CLIMBMING ON THE GANTRY TOWER FOR THE WASHING OF GANTRY INSULATORS.

Tentative Duration: From - 08:00 hrs. On 20-05-2017 to 18:00 hrs on 20-05-2017.

We request you to issue LCP on the above Line.

Switching and Earthing of the Line to be carried out in co-ordination with DGEN SM after
obtaining grid code from WRLDC.

We require your end Line CB Open, Line Isolator Open, Line Earth Switch Close and render
them inoperative with locks and issue us LCP.

Regards,

Nikhilesh Chauhan
Shift Manager
DGEN1200MW CCPP
Torrent Power Limited,
Phone: 9099006655
Fax : 02641612408
02641618718
E Mail: dgenoperations@torrentpower.com