Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 20-Jun-2017 Tuesday No. of Day Report No. DPR- 650

Proj Start Date 2014 Contract Period 1 Year Calendar Day AM PM Fine
Weather
Estimate Completion Date 14-Nov-2017 Remain Period 148 Calendar Day 6~8 8~10 10 ~12 12~2 2~4 4~6 Rain
Work Force
Office
Trades PM PE SSE Site Engr QA/QC QS Admin Safety Security Site Store Driver Surveyer Geotech Workers Mason Carpenter Smith Welder
Staff
Today 1 3 1 1 3 2 1 27 20 38 50
Steel Roofing D&W Ceiling Water
Trades Scaffolder Painter Aluminium Total
Erector worker Installer worker Proofing
Today 6 3 153

Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
Excavator 60 Ton Crane Car Crane
Dozer 50 Ton Crane 13 tons Back Hole 1
1.5 Ton Roller 25 Ton Crane Rummer 1
Boom Lift Generator Truck
Material Delivery On Site
Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total
Sand (river) suds 2.26
12mm Plywood shts 100

FO-OP-01 REV-00 Page: 1/3


Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 20-Jun-2017 Tuesday No. of Day Report No.
Test Item Remarks
Sampl
e
LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT Conducted
HSE Waste Plan Management For Construction Recycling.
732388 0 0 0 0 0 By Safety Officer

Works Carried out Details


Trades Of Work Location Remark
I Block(A) F&B Building
1 Demolition the Brick Wall at 1st Floor In Progress
2 Kalzip Wall Clading installation.
II Block(B) Aquarium Building
1 Formwork installation & Rebar Fixing work For 2nd Floor Beam. (GL:B9 to B13') In Progress
2 Rebar FIxing For Main Fish Tank (1st floor to 2nd Floor) In Progress
3 Formwork installation For Main Fish Tank Wall In Progress

III External Work


1 Brick Work For Retaining Wall (Near Block - B) In Progress

III Other Work


1 Broken Brick Laying For Site Pass Way
2 Cleaning Work Around the Site
Special Event
Visitors Site
Purpose
on Site Instruction
Project Manager Project Engineer Prepare By: Site Engineer
Name Name Sai Thing Nun Name Lin Naing Soe
FO-OP-01 REV-00 Page: 2/3
Daily Report

Project Name: Myanmar Aquarium Project

Project Code:
Signature 4YG - 04700 Report Date : Signature 20-Jun-2017 Tuesday No. of Day Signature Report No.

Rebar fixing & Formwork installation at 2nd Floor Beam&Slab Rebar Fixing For Main Fish Tank Wall Formwork installation For Main Fish Tank Wall

FO-OP-01 REV-00 Page: 3/3