Pipe Rack Design Summary PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 64

SAAD AL FARAJ Job No Sheet No Rev

1
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Job Information
Engineer Checked Approved

Name: ABP MEC MEC


Date: 13-Jun-16

Structure Type SPACE FRAME

Number of Nodes 127 Highest Node 175


Number of Elements 337 Highest Beam 553
Number of Plates 110 Highest Plate 481

Number of Basic Load Cases 3


Number of Combina on Load Cases 6

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 DL
Primary 2 WZ
Primary 3 LL
Combina on 4 GENERATED AISC GENERAL 1
Combina on 5 GENERATED AISC GENERAL 2
Combina on 6 GENERATED AISC GENERAL 3
Combina on 7 GENERATED AISC GENERAL 3
Combina on 8 GENERATED AISC GENERAL 4
Combina on 9 GENERATED AISC GENERAL 5

Beams
Beam Node A Node B Length Property
(m) (degrees)
2 3 4 2.200 3 0
3 5 6 2.200 4 0
4 7 8 2.200 4 0
5 9 10 2.200 4 0
6 11 12 2.200 4 0
7 13 14 2.200 4 0
8 15 16 2.200 4 0
9 17 18 2.200 4 0
10 19 20 2.200 4 0
11 21 22 2.200 4 0
12 23 24 2.200 4 0
13 25 26 2.200 4 0
14 27 28 2.200 4 0

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 38
SAAD AL FARAJ Job No Sheet No Rev
2
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
15 29 30 2.200 4 0
16 31 32 2.200 4 0
17 33 34 2.200 4 0
18 35 36 2.200 3 0
19 37 40 1.100 3 0
20 2 4 2.000 2 0
21 1 3 2.000 2 0
23 40 38 1.100 3 0
81 79 4 2.973 3 0
82 4 82 2.663 3 0
83 82 8 2.663 3 0
84 8 84 2.663 3 0
85 84 12 2.663 3 0
86 12 97 2.663 3 0
87 97 16 2.663 3 0
88 16 87 2.663 3 0
89 87 20 2.663 3 0
90 20 96 2.663 3 0
91 96 24 2.663 3 0
92 24 90 2.663 3 0
93 90 28 2.663 3 0
94 28 92 2.663 3 0
95 92 32 2.663 3 0
96 32 94 2.663 3 0
97 94 36 2.663 3 0
98 36 80 2.973 3 0
99 80 35 2.973 3 0
100 35 94 2.663 3 0
101 94 31 2.663 3 0
102 31 92 2.663 3 0
103 92 27 2.663 3 0
104 27 90 2.663 3 0
105 90 23 2.663 3 0
106 23 96 2.663 3 0
107 96 19 2.663 3 0
108 19 87 2.663 3 0
109 87 15 2.663 3 0
110 15 97 2.663 3 0
111 97 11 2.663 3 0
112 11 84 2.663 3 0
113 84 7 2.663 3 0
114 7 82 2.663 3 0
115 82 3 2.663 3 0
116 3 79 2.973 3 0
117 1 79 2.200 3 0

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 38
SAAD AL FARAJ Job No Sheet No Rev
3
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
118 79 2 2.200 3 0
119 37 80 2.200 3 0
120 80 38 2.200 3 0
121 1 2 2.200 3 0
122 100 101 2.200 3 0
123 102 103 2.200 4 0
124 104 105 2.200 4 0
125 106 107 2.200 4 0
126 108 109 2.200 4 0
127 110 111 2.200 4 0
128 112 113 2.200 4 0
129 114 115 2.200 4 0
130 116 117 2.200 4 0
131 118 119 2.200 4 0
132 120 121 2.200 4 0
133 122 123 2.200 4 0
134 124 125 2.200 4 0
135 126 127 2.200 4 0
136 128 129 2.200 4 0
137 130 131 2.200 4 0
138 132 133 2.200 3 0
140 99 101 2.000 2 0
141 98 100 2.000 2 0
143 98 99 2.200 3 0
144 4 103 1.714 3 0
145 103 8 1.714 3 0
146 8 107 1.714 3 0
147 107 12 1.714 3 0
148 12 111 1.714 3 0
149 111 16 1.714 3 0
150 16 115 1.714 3 0
151 115 20 1.714 3 0
152 20 119 1.714 3 0
153 119 24 1.714 3 0
154 24 123 1.714 3 0
155 123 28 1.714 3 0
156 28 127 1.714 3 0
157 127 32 1.714 3 0
158 32 131 1.714 3 0
159 131 36 1.714 3 0
160 3 102 1.714 3 0
161 102 7 1.714 3 0
162 7 106 1.714 3 0
163 106 11 1.714 3 0
164 11 110 1.714 3 0

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 38
SAAD AL FARAJ Job No Sheet No Rev
4
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
165 110 15 1.714 3 0
166 15 114 1.714 3 0
167 114 19 1.714 3 0
168 19 118 1.714 3 0
169 118 23 1.714 3 0
170 23 122 1.714 3 0
171 122 27 1.714 3 0
172 27 126 1.714 3 0
173 126 31 1.714 3 0
174 31 130 1.714 3 0
175 130 35 1.714 3 0
176 130 33 0.830 3 0
177 126 29 0.830 3 0
178 122 25 0.830 3 0
179 118 21 0.830 3 0
180 114 17 0.830 3 0
181 110 13 0.830 3 0
182 106 9 0.830 3 0
183 102 5 0.830 3 0
184 103 6 0.830 3 0
185 107 10 0.830 3 0
186 111 14 0.830 3 0
187 115 18 0.830 3 0
188 119 22 0.830 3 0
189 123 26 0.830 3 0
190 127 30 0.830 3 0
191 131 34 0.830 3 0
192 105 8 0.830 3 0
193 109 12 0.830 3 0
194 113 16 0.830 3 0
195 117 20 0.830 3 0
196 121 24 0.830 3 0
197 125 28 0.830 3 0
198 129 32 0.830 3 0
199 104 7 0.830 3 0
200 108 11 0.830 3 0
201 112 15 0.830 3 0
202 116 19 0.830 3 0
203 120 23 0.830 3 0
205 124 27 0.830 3 0
206 128 31 0.830 3 0
207 135 134 2.200 3 0
208 133 135 2.000 2 0
209 101 103 1.500 2 0
210 132 134 2.000 2 0

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 4 of 38
SAAD AL FARAJ Job No Sheet No Rev
5
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
211 100 102 1.500 2 0
212 98 136 1.250 2 0
213 99 137 1.250 2 0
214 100 138 1.250 2 0
215 101 139 1.250 2 0
216 132 140 1.250 2 0
217 133 141 1.250 2 0
218 134 142 1.250 2 0
219 135 143 1.250 2 0
220 138 139 2.200 3 0
221 140 141 2.200 3 0
222 137 139 2.000 3 0
223 136 138 2.000 3 0
224 136 137 2.200 3 0
225 143 142 2.200 3 0
226 141 143 2.000 3 0
227 140 142 2.000 3 0
228 136 144 1.250 2 0
229 137 145 1.250 2 0
230 138 146 1.250 2 0
231 139 147 1.250 2 0
232 140 148 1.250 2 0
233 141 149 1.250 2 0
234 142 150 1.250 2 0
235 143 151 1.250 2 0
236 146 147 2.200 3 0
237 148 149 2.200 3 0
238 145 147 2.000 3 0
239 144 146 2.000 3 0
240 144 145 2.200 3 0
241 151 150 2.200 3 0
242 149 151 2.000 3 0
243 148 150 2.000 3 0
244 144 152 1.250 2 0
245 145 153 1.250 2 0
246 146 154 1.250 2 0
247 147 155 1.250 2 0
248 148 156 1.250 2 0
249 149 157 1.250 2 0
250 150 158 1.250 2 0
251 151 159 1.250 2 0
252 154 155 2.200 3 0
253 156 157 2.200 3 0
254 153 155 2.000 3 0
255 152 154 2.000 3 0

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 5 of 38
SAAD AL FARAJ Job No Sheet No Rev
6
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
256 152 153 2.200 3 0
257 159 158 2.200 3 0
258 157 159 2.000 3 0
259 156 158 2.000 3 0
260 152 160 1.250 2 0
261 153 161 1.250 2 0
262 154 162 1.250 2 0
263 155 163 1.250 2 0
264 156 164 1.250 2 0
265 157 165 1.250 2 0
266 158 166 1.250 2 0
267 159 167 1.250 2 0
268 162 163 2.200 3 0
269 164 165 2.200 3 0
270 161 163 2.000 3 0
271 160 162 2.000 3 0
272 160 161 2.200 3 0
273 167 166 2.200 3 0
274 165 167 2.000 3 0
275 164 166 2.000 3 0
276 160 168 0.500 2 0
277 161 169 0.500 2 0
278 162 170 0.500 2 0
279 163 171 0.500 2 0
280 164 172 0.500 2 0
281 165 173 0.500 2 0
282 166 174 0.500 2 0
283 167 175 0.500 2 0
284 135 38 0.830 2 0
285 134 37 0.830 2 0
286 132 35 0.830 2 0
287 133 36 0.830 2 0
288 99 2 0.830 2 0
289 98 1 0.830 2 0
290 100 3 0.830 2 0
291 101 4 0.830 2 0
292 36 135 2.165 3 0
297 4 99 2.165 3 0
302 3 98 2.165 3 0
311 134 35 2.165 3 0
315 136 99 2.530 3 0
323 164 157 2.530 3 0
324 157 148 2.530 3 0
325 148 141 2.530 3 0
326 141 132 2.530 3 0

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 6 of 38
SAAD AL FARAJ Job No Sheet No Rev
7
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
327 163 154 2.530 3 0
328 154 147 2.530 3 0
329 147 138 2.530 3 0
330 138 101 2.530 3 0
331 167 158 2.530 3 0
332 158 151 2.530 3 0
333 151 142 2.530 3 0
334 142 135 2.530 3 0
335 135 37 2.351 3 0
336 160 153 2.530 3 0
337 153 144 2.530 3 0
338 144 137 2.530 3 0
339 137 98 2.530 3 0
340 98 2 2.351 3 0
341 79 82 3.500 2 0
342 100 136 2.358 3 0
343 136 146 2.358 3 0
344 146 152 2.358 3 0
345 152 162 2.358 3 0
346 101 137 2.358 3 0
347 137 147 2.358 3 0
348 147 153 2.358 3 0
349 153 163 2.358 3 0
350 132 142 2.358 3 0
351 142 148 2.358 3 0
352 148 158 2.358 3 0
353 158 164 2.358 3 0
482 36 38 2.000 2 0
483 34 36 1.500 2 0
484 32 34 1.500 2 0
485 30 32 1.500 2 0
486 28 30 1.500 2 0
487 26 28 1.500 2 0
488 24 26 1.500 2 0
489 22 24 1.500 2 0
490 20 22 1.500 2 0
491 18 20 1.500 2 0
492 16 18 1.500 2 0
493 14 16 1.500 2 0
494 12 14 1.500 2 0
495 10 12 1.500 2 0
496 8 10 1.500 2 0
497 6 8 1.500 2 0
498 4 6 1.500 2 0
499 35 37 2.000 2 0

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 7 of 38
SAAD AL FARAJ Job No Sheet No Rev
8
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
500 33 35 1.500 2 0
501 31 33 1.500 2 0
502 29 31 1.500 2 0
503 27 29 1.500 2 0
504 25 27 1.500 2 0
505 23 25 1.500 2 0
506 21 23 1.500 2 0
507 19 21 1.500 2 0
508 17 19 1.500 2 0
509 15 17 1.500 2 0
510 13 15 1.500 2 0
511 11 13 1.500 2 0
512 9 11 1.500 2 0
513 7 9 1.500 2 0
514 5 7 1.500 2 0
515 3 5 1.500 2 0
516 131 133 1.500 2 0
517 129 131 1.500 2 0
518 127 129 1.500 2 0
519 125 127 1.500 2 0
520 123 125 1.500 2 0
521 121 123 1.500 2 0
522 119 121 1.500 2 0
523 117 119 1.500 2 0
524 115 117 1.500 2 0
525 113 115 1.500 2 0
526 111 113 1.500 2 0
527 109 111 1.500 2 0
528 107 109 1.500 2 0
529 105 107 1.500 2 0
530 103 105 1.500 2 0
531 130 132 1.500 2 0
532 128 130 1.500 2 0
533 126 128 1.500 2 0
534 124 126 1.500 2 0
535 122 124 1.500 2 0
536 120 122 1.500 2 0
537 118 120 1.500 2 0
538 116 118 1.500 2 0
539 114 116 1.500 2 0
540 112 114 1.500 2 0
541 110 112 1.500 2 0
542 108 110 1.500 2 0
543 106 108 1.500 2 0
544 104 106 1.500 2 0

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 8 of 38
SAAD AL FARAJ Job No Sheet No Rev
9
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
545 102 104 1.500 2 0
546 94 80 3.500 2 0
547 92 94 3.000 2 0
548 90 92 3.000 2 0
549 96 90 3.000 2 0
550 87 96 3.000 2 0
551 97 87 3.000 2 0
552 84 97 3.000 2 0
553 82 84 3.000 2 0

Plates
Plate Node A Node B Node C Node D Property

354 2 4 79 1
355 4 82 79 1
356 4 8 82 1
357 8 84 82 1
358 8 12 84 1
359 12 97 84 1
360 12 16 97 1
361 16 87 97 1
362 16 20 87 1
363 20 96 87 1
364 20 24 96 1
365 24 90 96 1
366 24 28 90 1
367 28 92 90 1
368 28 32 92 1
369 32 94 92 1
370 32 36 94 1
371 36 80 94 1
372 36 38 80 1
373 37 35 80 1
374 35 94 80 1
375 35 31 94 1
376 31 92 94 1
377 31 27 92 1
378 27 90 92 1
379 27 23 90 1
380 23 96 90 1
381 23 19 96 1
382 19 87 96 1
383 19 15 87 1

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 9 of 38
SAAD AL FARAJ Job No Sheet No Rev
10
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Plates Cont...
Plate Node A Node B Node C Node D Property

384 15 97 87 1
385 15 11 97 1
386 11 84 97 1
387 11 7 84 1
388 7 82 84 1
389 7 3 82 1
390 3 79 82 1
391 3 1 79 1
410 99 4 2 1
411 99 101 4 1
412 101 103 4 1
413 4 103 6 1
414 103 8 6 1
415 103 105 8 1
416 105 107 8 1
417 8 107 10 1
418 107 12 10 1
419 107 109 12 1
420 109 111 12 1
421 12 111 14 1
422 111 16 14 1
423 111 113 16 1
424 113 115 16 1
425 16 115 18 1
426 115 20 18 1
427 115 117 20 1
428 117 119 20 1
429 119 22 20 1
430 119 24 22 1
431 119 121 24 1
432 121 123 24 1
433 24 123 26 1
434 123 28 26 1
435 123 125 28 1
436 125 127 28 1
437 28 127 30 1
438 127 32 30 1
439 127 129 32 1
440 129 131 32 1
441 32 131 34 1
442 131 36 34 1
443 131 133 36 1
444 133 135 36 1
445 36 135 38 1
446 134 35 37 1

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 10 of 38
SAAD AL FARAJ Job No Sheet No Rev
11
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Plates Cont...
Plate Node A Node B Node C Node D Property

447 134 132 35 1


448 132 130 35 1
449 35 130 33 1
450 130 31 33 1
451 130 128 31 1
452 128 126 31 1
453 31 126 29 1
454 126 27 29 1
455 126 124 27 1
456 124 122 27 1
457 27 122 25 1
458 122 23 25 1
459 122 120 23 1
460 120 118 23 1
461 23 118 21 1
462 118 19 21 1
463 118 116 19 1
464 116 114 19 1
465 19 114 17 1
466 114 15 17 1
467 114 112 15 1
468 112 110 15 1
469 15 110 13 1
470 110 11 13 1
471 110 108 11 1
472 108 106 11 1
473 106 9 11 1
474 106 7 9 1
475 106 104 7 1
476 104 102 7 1
477 7 102 5 1
478 102 3 5 1
479 102 100 3 1
480 100 98 3 1
481 3 98 1 1

Section Properties
Prop Section Area Iyy Izz J Material
(cm2) (cm4) (cm4) (cm4)
2 219.1X5CHS 33.600 1.93E+3 1.93E+3 3.86E+3 STEEL
3 101.6X4CHS 12.300 146.000 146.000 292.569 STEEL
4 IPE160 20.100 68.000 869.000 3.600 STEEL

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 11 of 38
SAAD AL FARAJ Job No Sheet No Rev
12
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Plate Thickness
Prop Node A Node B Node C Node D Material
(cm) (cm) (cm) (cm)
1 0.120 0.120 0.120 0.120 STEEL

Materials
Mat Name E Density
(kN/mm2) (kg/m3) (/C)
1 STEEL 205.000 0.300 7.83E+3 12E -6
2 STAINLESSSTEEL 197.930 0.300 7.83E+3 18E -6
3 ALUMINUM 68.948 0.330 2.71E+3 23E -6
4 CONCRETE 21.718 0.170 2.4E+3 10E -6

Supports
Node X Y Z rX rY rZ
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
168 Fixed Fixed Fixed Fixed Fixed Fixed
169 Fixed Fixed Fixed Fixed Fixed Fixed
170 Fixed Fixed Fixed Fixed Fixed Fixed
171 Fixed Fixed Fixed Fixed Fixed Fixed
172 Fixed Fixed Fixed Fixed Fixed Fixed
173 Fixed Fixed Fixed Fixed Fixed Fixed
174 Fixed Fixed Fixed Fixed Fixed Fixed
175 Fixed Fixed Fixed Fixed Fixed Fixed

Primary Load Cases


Number Name Type

1 DL Dead
2 WZ Wind
3 LL Live

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 12 of 38
SAAD AL FARAJ Job No Sheet No Rev
13
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Combination Load Cases


Comb. Combination L/C Name Primary Primary L/C Name Factor

4 GENERATED AISC GENERAL 1 1 DL 1.40


5 GENERATED AISC GENERAL 2 1 DL 1.20
3 LL 1.60
6 GENERATED AISC GENERAL 3 1 DL 1.20
2 WZ 0.50
7 GENERATED AISC GENERAL 3 1 DL 1.20
2 WZ 1.00
3 LL 1.00
8 GENERATED AISC GENERAL 4 1 DL 1.20
3 LL 1.00
9 GENERATED AISC GENERAL 5 1 DL 0.90
2 WZ 1.00

1 DL : Beam Loads
Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
2 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
3 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
4 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
5 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
6 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
7 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
8 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 13 of 38
SAAD AL FARAJ Job No Sheet No Rev
14
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

1 DL : Beam Loads Cont...


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
8 CON kN GY -0.330 1.865 - - -
9 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
10 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
11 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
12 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
13 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
14 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
15 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
16 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
17 CON kN GY -0.330 0.355 - - -
CON kN GY -0.825 0.830 - - -
CON kN GY -0.825 1.370 - - -
CON kN GY -0.330 1.865 - - -
122 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
123 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
124 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 14 of 38
SAAD AL FARAJ Job No Sheet No Rev
15
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

1 DL : Beam Loads Cont...


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
124 CON kN GY -0.825 1.640 - - -
125 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
126 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
127 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
128 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
129 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
130 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
131 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
132 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
133 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
134 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
135 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
136 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
137 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -
138 CON kN GY -0.825 0.560 - - -
CON kN GY -0.825 1.100 - - -
CON kN GY -0.825 1.640 - - -

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 15 of 38
SAAD AL FARAJ Job No Sheet No Rev
16
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

1 DL : Selfweight
Direction Factor Assigned Geometry

Y -1.000 ALL

2 WZ : Wind Loading
Direction Type Factor

Z 1 1.000

3 LL : Beam Loads
Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
209 UNI kN/m GY -1.100 - - - -
211 UNI kN/m GY -1.100 - - - -
516 UNI kN/m GY -1.100 - - - -
517 UNI kN/m GY -1.100 - - - -
518 UNI kN/m GY -1.100 - - - -
519 UNI kN/m GY -1.100 - - - -
520 UNI kN/m GY -1.100 - - - -
521 UNI kN/m GY -1.100 - - - -
522 UNI kN/m GY -1.100 - - - -
523 UNI kN/m GY -1.100 - - - -
524 UNI kN/m GY -1.100 - - - -
525 UNI kN/m GY -1.100 - - - -
526 UNI kN/m GY -1.100 - - - -
527 UNI kN/m GY -1.100 - - - -
528 UNI kN/m GY -1.100 - - - -
529 UNI kN/m GY -1.100 - - - -
530 UNI kN/m GY -1.100 - - - -
531 UNI kN/m GY -1.100 - - - -
532 UNI kN/m GY -1.100 - - - -
533 UNI kN/m GY -1.100 - - - -
534 UNI kN/m GY -1.100 - - - -
535 UNI kN/m GY -1.100 - - - -
536 UNI kN/m GY -1.100 - - - -
537 UNI kN/m GY -1.100 - - - -
538 UNI kN/m GY -1.100 - - - -
539 UNI kN/m GY -1.100 - - - -
540 UNI kN/m GY -1.100 - - - -
541 UNI kN/m GY -1.100 - - - -
542 UNI kN/m GY -1.100 - - - -
543 UNI kN/m GY -1.100 - - - -
544 UNI kN/m GY -1.100 - - - -
545 UNI kN/m GY -1.100 - - - -

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 16 of 38
SAAD AL FARAJ Job No Sheet No Rev
17
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Node Displacement Summary


Node L/C X Y Z Resultant rX rY rZ
(mm) (mm) (mm) (mm) (rad) (rad) (rad)
Max X 82 5:GENERATED A 2.083 -2.239 0.249 3.068 0.000 -0.000 -0.001
Min X 94 5:GENERATED A -0.727 -2.231 -0.095 2.348 0.000 0.000 0.001
Max Y 117 2:WZ -0.017 5.596 22.924 23.597 -0.005 0.000 -0.000
Min Y 19 7:GENERATED A 0.556 -12.725 18.801 22.709 -0.005 0.000 0.000
Max Z 116 2:WZ -0.018 -5.594 22.924 23.597 -0.005 0.000 -0.000
Min Z 35 5:GENERATED A 0.647 -0.753 -0.430 1.081 -0.000 -0.000 0.001
Max rX 4 7:GENERATED A 0.016 -0.912 3.845 3.952 0.001 -0.001 -0.000
Min rX 117 9:GENERATED A 0.338 1.296 22.840 22.879 -0.005 0.000 -0.000
Max rY 129 2:WZ 0.032 1.501 9.339 9.459 -0.001 0.002 -0.001
Min rY 104 2:WZ 0.032 -1.501 9.347 9.466 -0.001 -0.002 -0.001
Max rZ 31 7:GENERATED A -0.015 -4.534 8.088 9.272 -0.001 0.002 0.001
Min rZ 7 7:GENERATED A 1.109 -4.623 8.483 9.724 -0.001 -0.002 -0.001
Max Rst 116 7:GENERATED A 0.561 -12.715 22.781 26.095 -0.005 0.000 0.000

Beam Displacement Detail Summary


Displacements shown in italic indicate the presence of an oset
Beam L/C d X Y Z Resultant
(m) (mm) (mm) (mm) (mm)
Max X 82 5:GENERATED A 2.663 2.083 -2.239 0.249 3.068
Min X 96 5:GENERATED A 2.663 -0.727 -2.231 -0.095 2.348
Max Y 195 2:WZ 0.083 -0.017 5.596 22.516 23.201
Min Y 10 7:GENERATED A 0.000 0.557 -12.725 18.801 22.709
Max Z 130 2:WZ 0.880 -0.017 -1.127 22.924 22.952
Min Z 99 5:GENERATED A 2.378 0.455 -0.570 -0.458 0.861
Max Rst 130 7:GENERATED A 0.000 0.561 -12.715 22.781 26.095

Reactions
Horizontal Ver cal Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
168 1:DL 3.482 1.236 -0.190 -0.120 -0.008 -1.772
2:WZ -0.236 -59.684 -9.060 -4.233 0.260 0.317
3:LL 1.231 -1.488 -0.092 -0.038 -0.003 -0.623
4:GENERATED A 4.875 1.730 -0.265 -0.168 -0.012 -2.481
5:GENERATED A 6.148 -0.897 -0.374 -0.205 -0.014 -3.124
6:GENERATED A 4.060 -28.359 -4.757 -2.260 0.120 -1.968
7:GENERATED A 5.174 -59.688 -9.379 -4.415 0.247 -2.432
8:GENERATED A 5.410 -0.005 -0.319 -0.182 -0.012 -2.750
9:GENERATED A 2.898 -58.571 -9.231 -4.341 0.252 -1.277
169 1:DL 3.545 4.535 -0.155 -0.084 0.003 -1.819
2:WZ 0.237 59.651 -4.937 -2.874 0.300 -0.338
3:LL 1.253 -0.273 -0.040 -0.020 0.002 -0.640

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 17 of 38
SAAD AL FARAJ Job No Sheet No Rev
18
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Reactions Cont...
Horizontal Ver cal Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
4:GENERATED A 4.963 6.348 -0.217 -0.117 0.005 -2.546
5:GENERATED A 6.260 5.005 -0.250 -0.133 0.007 -3.206
6:GENERATED A 4.372 35.267 -2.655 -1.538 0.154 -2.351
7:GENERATED A 5.744 64.819 -5.163 -2.995 0.306 -3.160
8:GENERATED A 5.508 5.169 -0.226 -0.121 0.006 -2.822
9:GENERATED A 3.427 63.732 -5.077 -2.950 0.303 -1.975
170 1:DL 6.199 42.822 -0.049 0.121 -0.010 -2.655
2:WZ -0.109 -56.374 -11.947 -6.541 0.158 0.253
3:LL 2.237 13.381 -0.033 0.034 -0.003 -0.945
4:GENERATED A 8.678 59.951 -0.069 0.170 -0.014 -3.717
5:GENERATED A 11.018 72.797 -0.112 0.200 -0.016 -4.697
6:GENERATED A 7.384 23.199 -6.032 -3.125 0.067 -3.059
7:GENERATED A 9.566 8.394 -12.039 -6.361 0.143 -3.877
8:GENERATED A 9.676 64.768 -0.092 0.179 -0.015 -4.131
9:GENERATED A 5.470 -17.834 -11.991 -6.432 0.149 -2.136
171 1:DL 6.325 46.889 -0.530 -0.040 -0.005 -2.714
2:WZ 0.091 56.391 -22.519 -9.961 0.260 -0.274
3:LL 2.281 14.777 -0.165 -0.018 -0.001 -0.965
4:GENERATED A 8.854 65.644 -0.742 -0.055 -0.007 -3.800
5:GENERATED A 11.238 79.909 -0.900 -0.076 -0.008 -4.801
6:GENERATED A 7.635 84.462 -11.895 -5.028 0.123 -3.394
7:GENERATED A 9.961 127.434 -23.319 -10.026 0.253 -4.496
8:GENERATED A 9.870 71.043 -0.801 -0.065 -0.007 -4.222
9:GENERATED A 5.783 98.590 -22.996 -9.997 0.255 -2.717
172 1:DL -11.807 33.449 2.008 0.617 0.061 5.135
2:WZ 0.134 -55.843 -22.294 -9.861 -0.260 -0.289
3:LL -4.244 10.264 0.692 0.223 0.022 1.833
4:GENERATED A -16.530 46.829 2.811 0.864 0.085 7.189
5:GENERATED A -20.960 56.562 3.517 1.097 0.108 9.094
6:GENERATED A -14.102 12.217 -8.737 -4.190 -0.057 6.018
7:GENERATED A -18.280 -5.440 -19.192 -8.897 -0.165 7.706
8:GENERATED A -18.413 50.403 3.102 0.963 0.095 7.995
9:GENERATED A -10.493 -25.739 -20.487 -9.305 -0.205 4.333
173 1:DL -0.618 55.213 0.808 0.228 0.037 1.156
2:WZ -0.188 55.978 -11.761 -6.460 -0.190 0.230
3:LL -0.229 18.279 0.302 0.089 0.013 0.414
4:GENERATED A -0.865 77.298 1.131 0.319 0.052 1.619
5:GENERATED A -1.108 95.501 1.453 0.416 0.066 2.049
6:GENERATED A -0.836 94.244 -4.911 -2.956 -0.051 1.503
7:GENERATED A -1.159 140.512 -10.490 -6.097 -0.133 2.031
8:GENERATED A -0.970 84.534 1.272 0.362 0.058 1.801
9:GENERATED A -0.744 105.669 -11.034 -6.255 -0.157 1.271
174 1:DL -6.480 16.692 -0.600 -0.249 0.034 3.422
2:WZ 0.257 -58.694 -4.646 -2.715 -0.313 -0.346

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 18 of 38
SAAD AL FARAJ Job No Sheet No Rev
19
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Reactions Cont...
Horizontal Ver cal Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
3:LL -2.306 4.238 -0.229 -0.098 0.012 1.215
4:GENERATED A -9.071 23.369 -0.840 -0.348 0.048 4.791
5:GENERATED A -11.465 26.811 -1.086 -0.455 0.060 6.051
6:GENERATED A -7.647 -9.317 -3.043 -1.656 -0.116 3.934
7:GENERATED A -9.824 -34.425 -5.595 -3.111 -0.260 4.976
8:GENERATED A -10.081 24.268 -0.949 -0.396 0.053 5.322
9:GENERATED A -5.575 -43.671 -5.186 -2.939 -0.283 2.734
175 1:DL -0.645 -13.206 -1.292 -0.445 0.028 1.156
2:WZ -0.185 58.575 -8.516 -3.988 -0.210 0.233
3:LL -0.223 -6.378 -0.437 -0.163 0.010 0.413
4:GENERATED A -0.904 -18.488 -1.809 -0.623 0.039 1.619
5:GENERATED A -1.132 -26.053 -2.249 -0.794 0.048 2.049
6:GENERATED A -0.867 13.440 -5.808 -2.528 -0.072 1.504
7:GENERATED A -1.183 36.349 -10.503 -4.685 -0.167 2.034
8:GENERATED A -0.998 -22.226 -1.987 -0.697 0.043 1.801
9:GENERATED A -0.766 46.690 -9.679 -4.389 -0.185 1.274

Reaction Summary
Horizontal Ver cal Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 171 5:GENERATED A 11.238 79.909 -0.900 -0.076 -0.008 -4.801
Min FX 172 5:GENERATED A -20.960 56.562 3.517 1.097 0.108 9.094
Max FY 173 7:GENERATED A -1.159 140.512 -10.490 -6.097 -0.133 2.031
Min FY 168 7:GENERATED A 5.174 -59.688 -9.379 -4.415 0.247 -2.432
Max FZ 172 5:GENERATED A -20.960 56.562 3.517 1.097 0.108 9.094
Min FZ 171 7:GENERATED A 9.961 127.434 -23.319 -10.026 0.253 -4.496
Max MX 172 5:GENERATED A -20.960 56.562 3.517 1.097 0.108 9.094
Min MX 171 7:GENERATED A 9.961 127.434 -23.319 -10.026 0.253 -4.496
Max MY 169 7:GENERATED A 5.744 64.819 -5.163 -2.995 0.306 -3.160
Min MY 174 2:WZ 0.257 -58.694 -4.646 -2.715 -0.313 -0.346
Max MZ 172 5:GENERATED A -20.960 56.562 3.517 1.097 0.108 9.094
Min MZ 171 5:GENERATED A 11.238 79.909 -0.900 -0.076 -0.008 -4.801

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 19 of 38
SAAD AL FARAJ Job No Sheet No Rev
20
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
2 101.6X4CHS 101.6X4CHS 0.180 0.950 0.190 Eq. H1-1b 7 12.300 146.000 146.000 292.000
3 IPE160 IPE160 0.114 0.950 0.120 Eq. H1-1b 7 20.100 869.000 68.000 3.600
4 IPE160 IPE160 0.118 0.950 0.125 Eq. H1-1b 7 20.100 869.000 68.000 3.600
5 IPE160 IPE160 0.105 0.950 0.110 Eq. H1-1b 7 20.100 869.000 68.000 3.600
6 IPE160 IPE160 0.109 0.950 0.115 Eq. H1-1b 7 20.100 869.000 68.000 3.600
7 IPE160 IPE160 0.085 0.950 0.090 Eq. H1-1b 7 20.100 869.000 68.000 3.600
8 IPE160 IPE160 0.068 0.950 0.072 Eq. H1-1b 7 20.100 869.000 68.000 3.600
9 IPE160 IPE160 0.049 0.950 0.052 Eq. H1-1b 7 20.100 869.000 68.000 3.600
10 IPE160 IPE160 0.047 0.950 0.049 Eq. H1-2 5 20.100 869.000 68.000 3.600
11 IPE160 IPE160 0.050 0.950 0.052 Eq. H1-1b 7 20.100 869.000 68.000 3.600
12 IPE160 IPE160 0.068 0.950 0.072 Eq. H1-1b 7 20.100 869.000 68.000 3.600
13 IPE160 IPE160 0.085 0.950 0.089 Eq. H1-1b 7 20.100 869.000 68.000 3.600
14 IPE160 IPE160 0.108 0.950 0.113 Eq. H1-1b 7 20.100 869.000 68.000 3.600
15 IPE160 IPE160 0.101 0.950 0.106 Eq. H1-1b 7 20.100 869.000 68.000 3.600
16 IPE160 IPE160 0.110 0.950 0.116 Eq. H1-1b 7 20.100 869.000 68.000 3.600
17 IPE160 IPE160 0.099 0.950 0.104 Eq. H1-1b 9 20.100 869.000 68.000 3.600
18 101.6X4CHS 101.6X4CHS 0.121 0.950 0.127 Eq. H1-1b 7 12.300 146.000 146.000 292.000
19 101.6X4CHS 101.6X4CHS 0.047 0.950 0.050 Sec. E1 5 12.300 146.000 146.000 292.000
20 219.1X5CHS 219.1X5CHS 0.073 0.950 0.077 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
21 219.1X5CHS 219.1X5CHS 0.114 0.950 0.120 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
23 101.6X4CHS 101.6X4CHS 0.047 0.950 0.050 Sec. E1 5 12.300 146.000 146.000 292.000
81 101.6X4CHS 101.6X4CHS 0.044 0.950 0.046 Sec. E1 5 12.300 146.000 146.000 292.000
82 101.6X4CHS 101.6X4CHS 0.102 0.950 0.107 Sec. E1 7 12.300 146.000 146.000 292.000
83 101.6X4CHS 101.6X4CHS 0.093 0.950 0.098 Eq. H1-1b 7 12.300 146.000 146.000 292.000
84 101.6X4CHS 101.6X4CHS 0.098 0.950 0.103 Sec. E1 7 12.300 146.000 146.000 292.000
85 101.6X4CHS 101.6X4CHS 0.074 0.950 0.078 Eq. H1-1b 7 12.300 146.000 146.000 292.000
86 101.6X4CHS 101.6X4CHS 0.064 0.950 0.068 Sec. E1 7 12.300 146.000 146.000 292.000
87 101.6X4CHS 101.6X4CHS 0.049 0.950 0.052 Eq. H1-1b 7 12.300 146.000 146.000 292.000
88 101.6X4CHS 101.6X4CHS 0.035 0.950 0.037 Eq. H1-1b 7 12.300 146.000 146.000 292.000
89 101.6X4CHS 101.6X4CHS 0.042 0.950 0.044 Eq. H1-1b 2 12.300 146.000 146.000 292.000
90 101.6X4CHS 101.6X4CHS 0.041 0.950 0.043 Eq. H1-1b 2 12.300 146.000 146.000 292.000
91 101.6X4CHS 101.6X4CHS 0.031 0.950 0.033 Eq. H1-1b 7 12.300 146.000 146.000 292.000
92 101.6X4CHS 101.6X4CHS 0.046 0.950 0.049 Eq. H1-1b 7 12.300 146.000 146.000 292.000
93 101.6X4CHS 101.6X4CHS 0.059 0.950 0.062 Sec. E1 7 12.300 146.000 146.000 292.000
94 101.6X4CHS 101.6X4CHS 0.074 0.950 0.078 Eq. H1-1b 7 12.300 146.000 146.000 292.000
95 101.6X4CHS 101.6X4CHS 0.093 0.950 0.098 Sec. E1 7 12.300 146.000 146.000 292.000
96 101.6X4CHS 101.6X4CHS 0.095 0.950 0.100 Eq. H1-1b 7 12.300 146.000 146.000 292.000
97 101.6X4CHS 101.6X4CHS 0.098 0.950 0.103 Sec. E1 7 12.300 146.000 146.000 292.000
98 101.6X4CHS 101.6X4CHS 0.040 0.950 0.042 Sec. E1 5 12.300 146.000 146.000 292.000
99 101.6X4CHS 101.6X4CHS 0.070 0.950 0.073 Eq. H1-1b 7 12.300 146.000 146.000 292.000
100 101.6X4CHS 101.6X4CHS 0.068 0.950 0.072 Sec. E1 5 12.300 146.000 146.000 292.000
101 101.6X4CHS 101.6X4CHS 0.071 0.950 0.074 Eq. H1-1b 2 12.300 146.000 146.000 292.000
102 101.6X4CHS 101.6X4CHS 0.074 0.950 0.078 Sec. E1 5 12.300 146.000 146.000 292.000
103 101.6X4CHS 101.6X4CHS 0.054 0.950 0.057 Eq. H1-1b 2 12.300 146.000 146.000 292.000
104 101.6X4CHS 101.6X4CHS 0.052 0.950 0.055 Sec. E1 5 12.300 146.000 146.000 292.000

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 20 of 38
SAAD AL FARAJ Job No Sheet No Rev
21
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
105 101.6X4CHS 101.6X4CHS 0.049 0.950 0.052 Eq. H1-1b 2 12.300 146.000 146.000 292.000
106 101.6X4CHS 101.6X4CHS 0.040 0.950 0.042 Eq. H1-1b 7 12.300 146.000 146.000 292.000
107 101.6X4CHS 101.6X4CHS 0.047 0.950 0.049 Eq. H1-1b 7 12.300 146.000 146.000 292.000
108 101.6X4CHS 101.6X4CHS 0.048 0.950 0.051 Eq. H1-1b 7 12.300 146.000 146.000 292.000
109 101.6X4CHS 101.6X4CHS 0.039 0.950 0.041 Eq. H1-1b 7 12.300 146.000 146.000 292.000
110 101.6X4CHS 101.6X4CHS 0.048 0.950 0.051 Eq. H1-1b 2 12.300 146.000 146.000 292.000
111 101.6X4CHS 101.6X4CHS 0.051 0.950 0.054 Eq. H1-1b 7 12.300 146.000 146.000 292.000
112 101.6X4CHS 101.6X4CHS 0.055 0.950 0.058 Eq. H1-1b 2 12.300 146.000 146.000 292.000
113 101.6X4CHS 101.6X4CHS 0.067 0.950 0.071 Sec. E1 5 12.300 146.000 146.000 292.000
114 101.6X4CHS 101.6X4CHS 0.072 0.950 0.076 Eq. H1-1b 2 12.300 146.000 146.000 292.000
115 101.6X4CHS 101.6X4CHS 0.067 0.950 0.070 Sec. E1 5 12.300 146.000 146.000 292.000
116 101.6X4CHS 101.6X4CHS 0.064 0.950 0.067 Eq. H1-1b 7 12.300 146.000 146.000 292.000
117 101.6X4CHS 101.6X4CHS 0.043 0.950 0.045 Eq. H1-1b 7 12.300 146.000 146.000 292.000
118 101.6X4CHS 101.6X4CHS 0.040 0.950 0.042 Eq. H1-1b 7 12.300 146.000 146.000 292.000
119 101.6X4CHS 101.6X4CHS 0.043 0.950 0.045 Eq. H1-1b 7 12.300 146.000 146.000 292.000
120 101.6X4CHS 101.6X4CHS 0.035 0.950 0.036 Eq. H1-1b 7 12.300 146.000 146.000 292.000
121 101.6X4CHS 101.6X4CHS 0.076 0.950 0.080 Sec. E1 7 12.300 146.000 146.000 292.000
122 101.6X4CHS 101.6X4CHS 0.182 0.950 0.192 Eq. H1-1b 7 12.300 146.000 146.000 292.000
123 IPE160 IPE160 0.183 0.950 0.192 Eq. H1-1b 7 20.100 869.000 68.000 3.600
124 IPE160 IPE160 0.181 0.950 0.190 Eq. H1-1b 7 20.100 869.000 68.000 3.600
125 IPE160 IPE160 0.168 0.950 0.176 Eq. H1-1b 7 20.100 869.000 68.000 3.600
126 IPE160 IPE160 0.150 0.950 0.158 Eq. H1-1b 7 20.100 869.000 68.000 3.600
127 IPE160 IPE160 0.130 0.950 0.136 Eq. H1-1b 7 20.100 869.000 68.000 3.600
128 IPE160 IPE160 0.099 0.950 0.104 Eq. H1-1b 7 20.100 869.000 68.000 3.600
129 IPE160 IPE160 0.068 0.950 0.071 Eq. H1-1b 7 20.100 869.000 68.000 3.600
130 IPE160 IPE160 0.047 0.950 0.049 Eq. H1-1b 4 20.100 869.000 68.000 3.600
131 IPE160 IPE160 0.069 0.950 0.073 Eq. H1-1b 7 20.100 869.000 68.000 3.600
132 IPE160 IPE160 0.100 0.950 0.105 Eq. H1-1b 7 20.100 869.000 68.000 3.600
133 IPE160 IPE160 0.130 0.950 0.136 Eq. H1-1b 7 20.100 869.000 68.000 3.600
134 IPE160 IPE160 0.148 0.950 0.155 Eq. H1-1b 7 20.100 869.000 68.000 3.600
135 IPE160 IPE160 0.162 0.950 0.171 Eq. H1-1b 7 20.100 869.000 68.000 3.600
136 IPE160 IPE160 0.170 0.950 0.178 Eq. H1-1b 9 20.100 869.000 68.000 3.600
137 IPE160 IPE160 0.165 0.950 0.174 Eq. H1-1b 2 20.100 869.000 68.000 3.600
138 101.6X4CHS 101.6X4CHS 0.165 0.950 0.174 Eq. H1-1b 7 12.300 146.000 146.000 292.000
140 219.1X5CHS 219.1X5CHS 0.115 0.950 0.121 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
141 219.1X5CHS 219.1X5CHS 0.150 0.950 0.158 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
143 101.6X4CHS 101.6X4CHS 0.031 0.950 0.033 Eq. H1-1b 7 12.300 146.000 146.000 292.000
144 101.6X4CHS 101.6X4CHS 0.086 0.950 0.091 Eq. H1-1b 7 12.300 146.000 146.000 292.000
145 101.6X4CHS 101.6X4CHS 0.066 0.950 0.070 Sec. E1 5 12.300 146.000 146.000 292.000
146 101.6X4CHS 101.6X4CHS 0.053 0.950 0.056 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
147 101.6X4CHS 101.6X4CHS 0.042 0.950 0.044 Eq. H1-1b 2 12.300 146.000 146.000 292.000
148 101.6X4CHS 101.6X4CHS 0.052 0.950 0.054 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
149 101.6X4CHS 101.6X4CHS 0.040 0.950 0.042 Eq. H1-1b 7 12.300 146.000 146.000 292.000
150 101.6X4CHS 101.6X4CHS 0.054 0.950 0.057 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
151 101.6X4CHS 101.6X4CHS 0.047 0.950 0.050 Eq. Sec. D2 7 12.300 146.000 146.000 292.000

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 21 of 38
SAAD AL FARAJ Job No Sheet No Rev
22
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
152 101.6X4CHS 101.6X4CHS 0.050 0.950 0.052 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
153 101.6X4CHS 101.6X4CHS 0.053 0.950 0.056 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
154 101.6X4CHS 101.6X4CHS 0.042 0.950 0.044 Eq. H1-1b 7 12.300 146.000 146.000 292.000
155 101.6X4CHS 101.6X4CHS 0.051 0.950 0.054 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
156 101.6X4CHS 101.6X4CHS 0.041 0.950 0.044 Eq. H1-1b 2 12.300 146.000 146.000 292.000
157 101.6X4CHS 101.6X4CHS 0.053 0.950 0.056 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
158 101.6X4CHS 101.6X4CHS 0.056 0.950 0.059 Sec. E1 5 12.300 146.000 146.000 292.000
159 101.6X4CHS 101.6X4CHS 0.077 0.950 0.081 Eq. H1-1b 7 12.300 146.000 146.000 292.000
160 101.6X4CHS 101.6X4CHS 0.072 0.950 0.076 Eq. H1-1b 7 12.300 146.000 146.000 292.000
161 101.6X4CHS 101.6X4CHS 0.090 0.950 0.094 Sec. E1 7 12.300 146.000 146.000 292.000
162 101.6X4CHS 101.6X4CHS 0.059 0.950 0.062 Eq. H1-1b 7 12.300 146.000 146.000 292.000
163 101.6X4CHS 101.6X4CHS 0.057 0.950 0.060 Eq. H1-1b 7 12.300 146.000 146.000 292.000
164 101.6X4CHS 101.6X4CHS 0.047 0.950 0.049 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
165 101.6X4CHS 101.6X4CHS 0.041 0.950 0.043 Eq. H1-1b 9 12.300 146.000 146.000 292.000
166 101.6X4CHS 101.6X4CHS 0.039 0.950 0.041 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
167 101.6X4CHS 101.6X4CHS 0.031 0.950 0.032 Eq. H1-1b 2 12.300 146.000 146.000 292.000
168 101.6X4CHS 101.6X4CHS 0.031 0.950 0.032 Eq. H1-1b 2 12.300 146.000 146.000 292.000
169 101.6X4CHS 101.6X4CHS 0.040 0.950 0.043 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
170 101.6X4CHS 101.6X4CHS 0.042 0.950 0.045 Eq. H1-1b 7 12.300 146.000 146.000 292.000
171 101.6X4CHS 101.6X4CHS 0.047 0.950 0.050 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
172 101.6X4CHS 101.6X4CHS 0.059 0.950 0.062 Eq. H1-1b 7 12.300 146.000 146.000 292.000
173 101.6X4CHS 101.6X4CHS 0.059 0.950 0.062 Eq. H1-1b 7 12.300 146.000 146.000 292.000
174 101.6X4CHS 101.6X4CHS 0.099 0.950 0.104 Sec. E1 7 12.300 146.000 146.000 292.000
175 101.6X4CHS 101.6X4CHS 0.071 0.950 0.074 Eq. H1-1b 7 12.300 146.000 146.000 292.000
176 101.6X4CHS 101.6X4CHS 0.057 0.950 0.060 Eq. H1-1b 2 12.300 146.000 146.000 292.000
177 101.6X4CHS 101.6X4CHS 0.060 0.950 0.063 Eq. H1-1b 7 12.300 146.000 146.000 292.000
178 101.6X4CHS 101.6X4CHS 0.057 0.950 0.060 Eq. H1-1b 7 12.300 146.000 146.000 292.000
179 101.6X4CHS 101.6X4CHS 0.051 0.950 0.053 Eq. H1-1b 7 12.300 146.000 146.000 292.000
180 101.6X4CHS 101.6X4CHS 0.050 0.950 0.053 Eq. H1-1b 7 12.300 146.000 146.000 292.000
181 101.6X4CHS 101.6X4CHS 0.056 0.950 0.059 Eq. H1-1b 7 12.300 146.000 146.000 292.000
182 101.6X4CHS 101.6X4CHS 0.058 0.950 0.061 Eq. H1-1b 7 12.300 146.000 146.000 292.000
183 101.6X4CHS 101.6X4CHS 0.060 0.950 0.063 Eq. H1-1b 2 12.300 146.000 146.000 292.000
184 101.6X4CHS 101.6X4CHS 0.083 0.950 0.087 Eq. H1-1b 7 12.300 146.000 146.000 292.000
185 101.6X4CHS 101.6X4CHS 0.046 0.950 0.049 Eq. H1-1b 4 12.300 146.000 146.000 292.000
186 101.6X4CHS 101.6X4CHS 0.047 0.950 0.049 Eq. H1-1b 4 12.300 146.000 146.000 292.000
187 101.6X4CHS 101.6X4CHS 0.045 0.950 0.047 Eq. H1-1b 4 12.300 146.000 146.000 292.000
188 101.6X4CHS 101.6X4CHS 0.045 0.950 0.047 Eq. H1-1b 4 12.300 146.000 146.000 292.000
189 101.6X4CHS 101.6X4CHS 0.047 0.950 0.049 Eq. H1-1b 4 12.300 146.000 146.000 292.000
190 101.6X4CHS 101.6X4CHS 0.046 0.950 0.049 Eq. H1-1b 4 12.300 146.000 146.000 292.000
191 101.6X4CHS 101.6X4CHS 0.070 0.950 0.073 Eq. H1-1b 7 12.300 146.000 146.000 292.000
192 101.6X4CHS 101.6X4CHS 0.043 0.950 0.045 Eq. H1-1b 7 12.300 146.000 146.000 292.000
193 101.6X4CHS 101.6X4CHS 0.046 0.950 0.048 Eq. H1-1b 4 12.300 146.000 146.000 292.000
194 101.6X4CHS 101.6X4CHS 0.047 0.950 0.049 Eq. H1-1b 4 12.300 146.000 146.000 292.000
195 101.6X4CHS 101.6X4CHS 0.045 0.950 0.047 Eq. H1-1b 4 12.300 146.000 146.000 292.000
196 101.6X4CHS 101.6X4CHS 0.046 0.950 0.049 Eq. H1-1b 4 12.300 146.000 146.000 292.000

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 22 of 38
SAAD AL FARAJ Job No Sheet No Rev
23
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
197 101.6X4CHS 101.6X4CHS 0.046 0.950 0.049 Eq. H1-1b 4 12.300 146.000 146.000 292.000
198 101.6X4CHS 101.6X4CHS 0.039 0.950 0.041 Eq. H1-1b 7 12.300 146.000 146.000 292.000
199 101.6X4CHS 101.6X4CHS 0.041 0.950 0.043 Eq. H1-1b 4 12.300 146.000 146.000 292.000
200 101.6X4CHS 101.6X4CHS 0.060 0.950 0.063 Eq. H1-1b 7 12.300 146.000 146.000 292.000
201 101.6X4CHS 101.6X4CHS 0.055 0.950 0.058 Eq. H1-1b 7 12.300 146.000 146.000 292.000
202 101.6X4CHS 101.6X4CHS 0.052 0.950 0.054 Eq. H1-1b 7 12.300 146.000 146.000 292.000
203 101.6X4CHS 101.6X4CHS 0.055 0.950 0.058 Eq. H1-1b 7 12.300 146.000 146.000 292.000
205 101.6X4CHS 101.6X4CHS 0.060 0.950 0.063 Eq. H1-1b 7 12.300 146.000 146.000 292.000
206 101.6X4CHS 101.6X4CHS 0.047 0.950 0.050 Eq. H1-1b 4 12.300 146.000 146.000 292.000
207 101.6X4CHS 101.6X4CHS 0.017 0.950 0.018 Eq. H1-1b 2 12.300 146.000 146.000 292.000
208 219.1X5CHS 219.1X5CHS 0.110 0.950 0.115 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
209 219.1X5CHS 219.1X5CHS 0.186 0.950 0.196 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
210 219.1X5CHS 219.1X5CHS 0.152 0.950 0.160 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
211 219.1X5CHS 219.1X5CHS 0.255 0.950 0.268 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
212 219.1X5CHS 219.1X5CHS 0.101 0.950 0.106 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
213 219.1X5CHS 219.1X5CHS 0.055 0.950 0.058 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
214 219.1X5CHS 219.1X5CHS 0.171 0.950 0.180 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
215 219.1X5CHS 219.1X5CHS 0.143 0.950 0.151 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
216 219.1X5CHS 219.1X5CHS 0.189 0.950 0.199 Eq. H1-2 7 33.600 1.93E+3 1.93E+3 3.86E+3
217 219.1X5CHS 219.1X5CHS 0.153 0.950 0.161 Eq. H1-1b 5 33.600 1.93E+3 1.93E+3 3.86E+3
218 219.1X5CHS 219.1X5CHS 0.101 0.950 0.106 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
219 219.1X5CHS 219.1X5CHS 0.069 0.950 0.073 Eq. H1-1b 5 33.600 1.93E+3 1.93E+3 3.86E+3
220 101.6X4CHS 101.6X4CHS 0.057 0.950 0.060 Eq. H1-1b 9 12.300 146.000 146.000 292.000
221 101.6X4CHS 101.6X4CHS 0.056 0.950 0.059 Eq. H1-1b 2 12.300 146.000 146.000 292.000
222 101.6X4CHS 101.6X4CHS 0.018 0.950 0.019 Eq. H1-1b 7 12.300 146.000 146.000 292.000
223 101.6X4CHS 101.6X4CHS 0.022 0.950 0.024 Eq. H1-1b 7 12.300 146.000 146.000 292.000
224 101.6X4CHS 101.6X4CHS 0.028 0.950 0.029 Eq. H1-1b 7 12.300 146.000 146.000 292.000
225 101.6X4CHS 101.6X4CHS 0.017 0.950 0.018 Eq. H1-1b 2 12.300 146.000 146.000 292.000
226 101.6X4CHS 101.6X4CHS 0.030 0.950 0.032 Eq. H1-1b 7 12.300 146.000 146.000 292.000
227 101.6X4CHS 101.6X4CHS 0.030 0.950 0.032 Eq. H1-2 7 12.300 146.000 146.000 292.000
228 219.1X5CHS 219.1X5CHS 0.081 0.950 0.085 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
229 219.1X5CHS 219.1X5CHS 0.061 0.950 0.064 Sec. E1 2 33.600 1.93E+3 1.93E+3 3.86E+3
230 219.1X5CHS 219.1X5CHS 0.138 0.950 0.146 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
231 219.1X5CHS 219.1X5CHS 0.144 0.950 0.152 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
232 219.1X5CHS 219.1X5CHS 0.142 0.950 0.149 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
233 219.1X5CHS 219.1X5CHS 0.143 0.950 0.150 Sec. E1 7 33.600 1.93E+3 1.93E+3 3.86E+3
234 219.1X5CHS 219.1X5CHS 0.074 0.950 0.078 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
235 219.1X5CHS 219.1X5CHS 0.067 0.950 0.071 Eq. H1-1b 5 33.600 1.93E+3 1.93E+3 3.86E+3
236 101.6X4CHS 101.6X4CHS 0.037 0.950 0.039 Eq. H1-1b 7 12.300 146.000 146.000 292.000
237 101.6X4CHS 101.6X4CHS 0.033 0.950 0.034 Eq. H1-1b 2 12.300 146.000 146.000 292.000
238 101.6X4CHS 101.6X4CHS 0.025 0.950 0.026 Eq. H1-1b 7 12.300 146.000 146.000 292.000
239 101.6X4CHS 101.6X4CHS 0.026 0.950 0.028 Eq. H1-1b 7 12.300 146.000 146.000 292.000
240 101.6X4CHS 101.6X4CHS 0.022 0.950 0.023 Eq. H1-1b 7 12.300 146.000 146.000 292.000
241 101.6X4CHS 101.6X4CHS 0.018 0.950 0.019 Eq. H1-1b 9 12.300 146.000 146.000 292.000
242 101.6X4CHS 101.6X4CHS 0.039 0.950 0.041 Eq. H1-1b 7 12.300 146.000 146.000 292.000

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 23 of 38
SAAD AL FARAJ Job No Sheet No Rev
24
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
243 101.6X4CHS 101.6X4CHS 0.027 0.950 0.028 Eq. H1-1b 7 12.300 146.000 146.000 292.000
244 219.1X5CHS 219.1X5CHS 0.096 0.950 0.101 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
245 219.1X5CHS 219.1X5CHS 0.061 0.950 0.064 Sec. E1 2 33.600 1.93E+3 1.93E+3 3.86E+3
246 219.1X5CHS 219.1X5CHS 0.111 0.950 0.117 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
247 219.1X5CHS 219.1X5CHS 0.154 0.950 0.162 Sec. E1 7 33.600 1.93E+3 1.93E+3 3.86E+3
248 219.1X5CHS 219.1X5CHS 0.096 0.950 0.101 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
249 219.1X5CHS 219.1X5CHS 0.143 0.950 0.151 Sec. E1 7 33.600 1.93E+3 1.93E+3 3.86E+3
250 219.1X5CHS 219.1X5CHS 0.073 0.950 0.077 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
251 219.1X5CHS 219.1X5CHS 0.069 0.950 0.073 Sec. E1 2 33.600 1.93E+3 1.93E+3 3.86E+3
252 101.6X4CHS 101.6X4CHS 0.029 0.950 0.031 Eq. H1-1b 7 12.300 146.000 146.000 292.000
253 101.6X4CHS 101.6X4CHS 0.027 0.950 0.028 Eq. H1-1b 7 12.300 146.000 146.000 292.000
254 101.6X4CHS 101.6X4CHS 0.021 0.950 0.022 Eq. H1-1b 7 12.300 146.000 146.000 292.000
255 101.6X4CHS 101.6X4CHS 0.018 0.950 0.019 Eq. H1-1b 7 12.300 146.000 146.000 292.000
256 101.6X4CHS 101.6X4CHS 0.019 0.950 0.020 Eq. H1-1b 9 12.300 146.000 146.000 292.000
257 101.6X4CHS 101.6X4CHS 0.023 0.950 0.024 Eq. H1-1b 7 12.300 146.000 146.000 292.000
258 101.6X4CHS 101.6X4CHS 0.039 0.950 0.041 Eq. H1-1b 7 12.300 146.000 146.000 292.000
259 101.6X4CHS 101.6X4CHS 0.026 0.950 0.028 Eq. H1-1b 7 12.300 146.000 146.000 292.000
260 219.1X5CHS 219.1X5CHS 0.070 0.950 0.073 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
261 219.1X5CHS 219.1X5CHS 0.086 0.950 0.091 Sec. E1 7 33.600 1.93E+3 1.93E+3 3.86E+3
262 219.1X5CHS 219.1X5CHS 0.111 0.950 0.117 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
263 219.1X5CHS 219.1X5CHS 0.155 0.950 0.163 Sec. E1 7 33.600 1.93E+3 1.93E+3 3.86E+3
264 219.1X5CHS 219.1X5CHS 0.097 0.950 0.102 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
265 219.1X5CHS 219.1X5CHS 0.188 0.950 0.198 Sec. E1 7 33.600 1.93E+3 1.93E+3 3.86E+3
266 219.1X5CHS 219.1X5CHS 0.078 0.950 0.082 Eq. Sec. D2 2 33.600 1.93E+3 1.93E+3 3.86E+3
267 219.1X5CHS 219.1X5CHS 0.069 0.950 0.073 Sec. E1 2 33.600 1.93E+3 1.93E+3 3.86E+3
268 101.6X4CHS 101.6X4CHS 0.043 0.950 0.045 Eq. H1-1b 7 12.300 146.000 146.000 292.000
269 101.6X4CHS 101.6X4CHS 0.047 0.950 0.049 Sec. E1 2 12.300 146.000 146.000 292.000
270 101.6X4CHS 101.6X4CHS 0.029 0.950 0.031 Eq. H1-2 7 12.300 146.000 146.000 292.000
271 101.6X4CHS 101.6X4CHS 0.025 0.950 0.026 Eq. H1-1b 7 12.300 146.000 146.000 292.000
272 101.6X4CHS 101.6X4CHS 0.023 0.950 0.024 Eq. H1-1b 7 12.300 146.000 146.000 292.000
273 101.6X4CHS 101.6X4CHS 0.027 0.950 0.029 Eq. H1-1b 7 12.300 146.000 146.000 292.000
274 101.6X4CHS 101.6X4CHS 0.017 0.950 0.018 Eq. H1-1b 7 12.300 146.000 146.000 292.000
275 101.6X4CHS 101.6X4CHS 0.045 0.950 0.047 Eq. H1-1b 7 12.300 146.000 146.000 292.000
276 219.1X5CHS 219.1X5CHS 0.172 0.950 0.181 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
277 219.1X5CHS 219.1X5CHS 0.162 0.950 0.171 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
278 219.1X5CHS 219.1X5CHS 0.204 0.950 0.215 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
279 219.1X5CHS 219.1X5CHS 0.366 0.950 0.386 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
280 219.1X5CHS 219.1X5CHS 0.326 0.950 0.343 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
281 219.1X5CHS 219.1X5CHS 0.251 0.950 0.264 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
282 219.1X5CHS 219.1X5CHS 0.180 0.950 0.189 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
283 219.1X5CHS 219.1X5CHS 0.154 0.950 0.163 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
284 219.1X5CHS 219.1X5CHS 0.065 0.950 0.068 Eq. H1-1b 5 33.600 1.93E+3 1.93E+3 3.86E+3
285 219.1X5CHS 219.1X5CHS 0.118 0.950 0.124 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
286 219.1X5CHS 219.1X5CHS 0.119 0.950 0.126 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
287 219.1X5CHS 219.1X5CHS 0.113 0.950 0.119 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 24 of 38
SAAD AL FARAJ Job No Sheet No Rev
25
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
288 219.1X5CHS 219.1X5CHS 0.057 0.950 0.060 Eq. H1-1b 5 33.600 1.93E+3 1.93E+3 3.86E+3
289 219.1X5CHS 219.1X5CHS 0.121 0.950 0.127 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
290 219.1X5CHS 219.1X5CHS 0.106 0.950 0.111 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
291 219.1X5CHS 219.1X5CHS 0.167 0.950 0.176 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
292 101.6X4CHS 101.6X4CHS 0.060 0.950 0.063 Sec. E1 2 12.300 146.000 146.000 292.000
297 101.6X4CHS 101.6X4CHS 0.059 0.950 0.062 Sec. E1 2 12.300 146.000 146.000 292.000
302 101.6X4CHS 101.6X4CHS 0.080 0.950 0.084 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
311 101.6X4CHS 101.6X4CHS 0.080 0.950 0.085 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
315 101.6X4CHS 101.6X4CHS 0.030 0.950 0.032 Eq. H1-1b 7 12.300 146.000 146.000 292.000
323 101.6X4CHS 101.6X4CHS 0.138 0.950 0.146 Eq. Sec. D2 2 12.300 146.000 146.000 292.000
324 101.6X4CHS 101.6X4CHS 0.176 0.950 0.185 Sec. E1 2 12.300 146.000 146.000 292.000
325 101.6X4CHS 101.6X4CHS 0.128 0.950 0.135 Eq. Sec. D2 2 12.300 146.000 146.000 292.000
326 101.6X4CHS 101.6X4CHS 0.178 0.950 0.187 Sec. E1 2 12.300 146.000 146.000 292.000
327 101.6X4CHS 101.6X4CHS 0.197 0.950 0.207 Sec. E1 7 12.300 146.000 146.000 292.000
328 101.6X4CHS 101.6X4CHS 0.134 0.950 0.141 Eq. Sec. D2 2 12.300 146.000 146.000 292.000
329 101.6X4CHS 101.6X4CHS 0.185 0.950 0.195 Sec. E1 7 12.300 146.000 146.000 292.000
330 101.6X4CHS 101.6X4CHS 0.140 0.950 0.148 Eq. H1-1b 2 12.300 146.000 146.000 292.000
331 101.6X4CHS 101.6X4CHS 0.085 0.950 0.089 Sec. E1 7 12.300 146.000 146.000 292.000
332 101.6X4CHS 101.6X4CHS 0.059 0.950 0.062 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
333 101.6X4CHS 101.6X4CHS 0.066 0.950 0.070 Sec. E1 7 12.300 146.000 146.000 292.000
334 101.6X4CHS 101.6X4CHS 0.052 0.950 0.054 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
335 101.6X4CHS 101.6X4CHS 0.066 0.950 0.070 Sec. E1 7 12.300 146.000 146.000 292.000
336 101.6X4CHS 101.6X4CHS 0.057 0.950 0.060 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
337 101.6X4CHS 101.6X4CHS 0.065 0.950 0.069 Sec. E1 7 12.300 146.000 146.000 292.000
338 101.6X4CHS 101.6X4CHS 0.042 0.950 0.044 Eq. Sec. D2 7 12.300 146.000 146.000 292.000
339 101.6X4CHS 101.6X4CHS 0.039 0.950 0.041 Sec. E1 2 12.300 146.000 146.000 292.000
340 101.6X4CHS 101.6X4CHS 0.052 0.950 0.054 Eq. H1-1b 7 12.300 146.000 146.000 292.000
341 219.1X5CHS 219.1X5CHS 0.046 0.950 0.049 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
342 101.6X4CHS 101.6X4CHS 0.086 0.950 0.090 Eq. H1-1b 7 12.300 146.000 146.000 292.000
343 101.6X4CHS 101.6X4CHS 0.068 0.950 0.072 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
344 101.6X4CHS 101.6X4CHS 0.097 0.950 0.103 Sec. E1 5 12.300 146.000 146.000 292.000
345 101.6X4CHS 101.6X4CHS 0.071 0.950 0.075 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
346 101.6X4CHS 101.6X4CHS 0.082 0.950 0.087 Sec. E1 5 12.300 146.000 146.000 292.000
347 101.6X4CHS 101.6X4CHS 0.070 0.950 0.074 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
348 101.6X4CHS 101.6X4CHS 0.100 0.950 0.106 Sec. E1 5 12.300 146.000 146.000 292.000
349 101.6X4CHS 101.6X4CHS 0.072 0.950 0.076 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
350 101.6X4CHS 101.6X4CHS 0.151 0.950 0.159 Sec. E1 5 12.300 146.000 146.000 292.000
351 101.6X4CHS 101.6X4CHS 0.134 0.950 0.141 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
352 101.6X4CHS 101.6X4CHS 0.182 0.950 0.192 Sec. E1 5 12.300 146.000 146.000 292.000
353 101.6X4CHS 101.6X4CHS 0.137 0.950 0.144 Eq. Sec. D2 5 12.300 146.000 146.000 292.000
482 219.1X5CHS 219.1X5CHS 0.076 0.950 0.080 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
483 219.1X5CHS 219.1X5CHS 0.079 0.950 0.083 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
484 219.1X5CHS 219.1X5CHS 0.058 0.950 0.061 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
485 219.1X5CHS 219.1X5CHS 0.045 0.950 0.047 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3
486 219.1X5CHS 219.1X5CHS 0.040 0.950 0.042 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 25 of 38
SAAD AL FARAJ Job No Sheet No Rev
26
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
487 219.1X5CHS 219.1X5CHS 0.075 0.950 0.079 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
488 219.1X5CHS 219.1X5CHS 0.073 0.950 0.077 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
489 219.1X5CHS 219.1X5CHS 0.092 0.950 0.097 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
490 219.1X5CHS 219.1X5CHS 0.091 0.950 0.096 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
491 219.1X5CHS 219.1X5CHS 0.090 0.950 0.095 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
492 219.1X5CHS 219.1X5CHS 0.092 0.950 0.096 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
493 219.1X5CHS 219.1X5CHS 0.070 0.950 0.074 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
494 219.1X5CHS 219.1X5CHS 0.073 0.950 0.077 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
495 219.1X5CHS 219.1X5CHS 0.040 0.950 0.042 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3
496 219.1X5CHS 219.1X5CHS 0.046 0.950 0.048 Eq. H3-1 7 33.600 1.93E+3 1.93E+3 3.86E+3
497 219.1X5CHS 219.1X5CHS 0.060 0.950 0.064 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
498 219.1X5CHS 219.1X5CHS 0.078 0.950 0.082 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
499 219.1X5CHS 219.1X5CHS 0.114 0.950 0.120 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
500 219.1X5CHS 219.1X5CHS 0.145 0.950 0.152 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
501 219.1X5CHS 219.1X5CHS 0.046 0.950 0.049 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3
502 219.1X5CHS 219.1X5CHS 0.045 0.950 0.048 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3
503 219.1X5CHS 219.1X5CHS 0.049 0.950 0.052 Sec. E1 7 33.600 1.93E+3 1.93E+3 3.86E+3
504 219.1X5CHS 219.1X5CHS 0.066 0.950 0.069 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
505 219.1X5CHS 219.1X5CHS 0.072 0.950 0.075 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
506 219.1X5CHS 219.1X5CHS 0.080 0.950 0.084 Sec. E1 2 33.600 1.93E+3 1.93E+3 3.86E+3
507 219.1X5CHS 219.1X5CHS 0.082 0.950 0.086 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
508 219.1X5CHS 219.1X5CHS 0.082 0.950 0.086 Sec. E1 2 33.600 1.93E+3 1.93E+3 3.86E+3
509 219.1X5CHS 219.1X5CHS 0.080 0.950 0.084 Sec. E1 2 33.600 1.93E+3 1.93E+3 3.86E+3
510 219.1X5CHS 219.1X5CHS 0.071 0.950 0.074 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
511 219.1X5CHS 219.1X5CHS 0.066 0.950 0.069 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
512 219.1X5CHS 219.1X5CHS 0.045 0.950 0.048 Sec. E1 7 33.600 1.93E+3 1.93E+3 3.86E+3
513 219.1X5CHS 219.1X5CHS 0.045 0.950 0.047 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3
514 219.1X5CHS 219.1X5CHS 0.045 0.950 0.047 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3
515 219.1X5CHS 219.1X5CHS 0.136 0.950 0.143 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
516 219.1X5CHS 219.1X5CHS 0.171 0.950 0.180 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
517 219.1X5CHS 219.1X5CHS 0.075 0.950 0.079 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
518 219.1X5CHS 219.1X5CHS 0.061 0.950 0.064 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
519 219.1X5CHS 219.1X5CHS 0.069 0.950 0.072 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
520 219.1X5CHS 219.1X5CHS 0.081 0.950 0.085 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
521 219.1X5CHS 219.1X5CHS 0.094 0.950 0.099 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
522 219.1X5CHS 219.1X5CHS 0.099 0.950 0.104 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
523 219.1X5CHS 219.1X5CHS 0.104 0.950 0.109 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
524 219.1X5CHS 219.1X5CHS 0.104 0.950 0.109 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
525 219.1X5CHS 219.1X5CHS 0.096 0.950 0.101 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
526 219.1X5CHS 219.1X5CHS 0.090 0.950 0.095 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
527 219.1X5CHS 219.1X5CHS 0.079 0.950 0.083 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
528 219.1X5CHS 219.1X5CHS 0.063 0.950 0.066 Eq. Sec. D2 7 33.600 1.93E+3 1.93E+3 3.86E+3
529 219.1X5CHS 219.1X5CHS 0.059 0.950 0.062 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
530 219.1X5CHS 219.1X5CHS 0.062 0.950 0.066 Eq. H1-1b 9 33.600 1.93E+3 1.93E+3 3.86E+3
531 219.1X5CHS 219.1X5CHS 0.274 0.950 0.288 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 26 of 38
SAAD AL FARAJ Job No Sheet No Rev
27
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
532 219.1X5CHS 219.1X5CHS 0.059 0.950 0.062 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
533 219.1X5CHS 219.1X5CHS 0.044 0.950 0.047 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3
534 219.1X5CHS 219.1X5CHS 0.048 0.950 0.050 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
535 219.1X5CHS 219.1X5CHS 0.064 0.950 0.067 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
536 219.1X5CHS 219.1X5CHS 0.081 0.950 0.085 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
537 219.1X5CHS 219.1X5CHS 0.090 0.950 0.095 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
538 219.1X5CHS 219.1X5CHS 0.096 0.950 0.101 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
539 219.1X5CHS 219.1X5CHS 0.096 0.950 0.101 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
540 219.1X5CHS 219.1X5CHS 0.092 0.950 0.096 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
541 219.1X5CHS 219.1X5CHS 0.083 0.950 0.088 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
542 219.1X5CHS 219.1X5CHS 0.067 0.950 0.070 Eq. H1-1b 7 33.600 1.93E+3 1.93E+3 3.86E+3
543 219.1X5CHS 219.1X5CHS 0.054 0.950 0.057 Eq. Sec. D2 5 33.600 1.93E+3 1.93E+3 3.86E+3
544 219.1X5CHS 219.1X5CHS 0.044 0.950 0.047 Eq. H3-1 2 33.600 1.93E+3 1.93E+3 3.86E+3
545 219.1X5CHS 219.1X5CHS 0.066 0.950 0.070 Eq. H1-1b 2 33.600 1.93E+3 1.93E+3 3.86E+3
546 219.1X5CHS 219.1X5CHS 0.046 0.950 0.048 Eq. H1-1b 5 33.600 1.93E+3 1.93E+3 3.86E+3
547 219.1X5CHS 219.1X5CHS 0.047 0.950 0.050 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
548 219.1X5CHS 219.1X5CHS 0.132 0.950 0.139 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
549 219.1X5CHS 219.1X5CHS 0.183 0.950 0.193 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
550 219.1X5CHS 219.1X5CHS 0.212 0.950 0.223 Eq. H1-1a 5 33.600 1.93E+3 1.93E+3 3.86E+3
551 219.1X5CHS 219.1X5CHS 0.183 0.950 0.193 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
552 219.1X5CHS 219.1X5CHS 0.132 0.950 0.139 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3
553 219.1X5CHS 219.1X5CHS 0.048 0.950 0.050 Sec. E1 5 33.600 1.93E+3 1.93E+3 3.86E+3

Failed Members
There is no data of this type.

Statics Check Results


L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
1:DL Loads -0.000 -187.629 0.000 205.517 0.000 -2.58E+3
1:DL Reac ons 0.000 187.629 -0.000 -205.517 -0.000 2.58E+3
Dierence 0.000 0.000 0.000 0.000 -0.000 -0.000
2:WZ Loads -0.000 -0.000 95.680 601.779 -1.32E+3 -0.000
2:WZ Reac ons 0.000 0.000 -95.680 -601.779 1.32E+3 -0.000
Dierence 0.000 -0.000 0.000 -0.000 -0.000 -0.000
3:LL Loads 0.000 -52.800 0.000 58.080 0.000 -739.200
3:LL Reac ons 0.000 52.800 0.000 -58.080 -0.000 739.200
Dierence 0.000 0.000 0.000 0.000 -0.000 -0.000

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 27 of 38
SAAD AL FARAJ Job No Sheet No Rev
28
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

MAIN FRAME (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 28 of 38
SAAD AL FARAJ Job No Sheet No Rev
29
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

MAIN FRAME COVER (Input data was modied a er picture taken)

Y
X
Z Load 1

MAIN MEMBERS-D219X5 CHS (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 29 of 38
SAAD AL FARAJ Job No Sheet No Rev
30
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

SECONDARY MEMBERS-D101X4 CHS (Input data was modied a er picture taken)

Y
X
Z Load 1

PIPE SUPPORTS-IPE 160 (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 30 of 38
SAAD AL FARAJ Job No Sheet No Rev
31
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

FLUID LOAD-D160 (0.33 kN) (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 31 of 38
SAAD AL FARAJ Job No Sheet No Rev
32
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

FLUID LOAD-D160 (0.33 kN) (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 32 of 38
SAAD AL FARAJ Job No Sheet No Rev
33
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

FLUID LOAD-D250 (0.825kN) (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 33 of 38
SAAD AL FARAJ Job No Sheet No Rev
34
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

FLUID LOAD-D250 (0.825kN) (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 34 of 38
SAAD AL FARAJ Job No Sheet No Rev
35
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

FLUID LOAD-D250 (0.825kN) (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 35 of 38
SAAD AL FARAJ Job No Sheet No Rev
36
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

FLUID LOAD-D250 (0.825kN) (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 36 of 38
SAAD AL FARAJ Job No Sheet No Rev
37
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 1

FLUID LOAD-D250 (0.825kN) (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 37 of 38
SAAD AL FARAJ Job No Sheet No Rev
38
ENGINEERING COSULTANCY
Part
Software licensed to Toshiba
Job Title PIPE RACK BRIDGE Ref

By ABP Date13-Jun-16 Chd MEC


Client SHAS DESALINATION PLANT File PIPE RACK BRIDGE.std Date/Time 23-Jun-2016 01:15

Y
X
Z Load 3

MAINTENANCE LIVE LOAD-(1.10 kN/m) (Input data was modied a er picture taken)

Print Time/Date: 23/06/2016 01:21 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 38 of 38
Job Number Sheet
1 1
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
E-Mail : mail@prokon.com Calcs by Checked by Date
ABP MEC 13-JUNE-2016

Base plate design by PROKON. (Basepl Ver W2.4.01 - 01 Apr 2008)

Design code : BS5950 - 1990


Title :
S11
Input Data

Column on Base Plate:


32x2.5

Base Plate Geometry

Plate Length L (mm) 450


Plate Width W (mm) 450
Offset L1 (mm) 115.45
Offset W1 (mm) 115.45
Bolt distance a1 (mm) 40
Bolt distance a2 (mm) 40
Bolt distance a3 (mm) 40
Bolt distance a4 (mm) 40

General Parameters

Concrete: fcu (MPa) 35


Plate: fy (MPa) 250
Welds: fuw (MPa) 500
Bolt Grade 4.8
Use studs (Y/N) Y

Loads

Load P Mx My Load
Case (kN) (kNm) (kNm) Factor
1 140.512 9.094 10.026
2 -59.688 9.094 10.026
Job Number Sheet
1 2
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
Calcs by Checked by Date
E-Mail : mail@prokon.com ABP MEC 13-JUNE-2016

Sketch of base plate

BS5950 - 1990 X

a4=40.0
L=450.0
L1=115.5 219.1

W=450.0
219.1
Y Y

a3=40.0
W1=115.5

a1=40.0 a2=40.0

Bending Moments & Design Output for (Critical) Load Case 1

2M22 or UNSTIFFENEDPLATE Load2M


Case
22 or1
3M18 or 3M18 or
4M16 4M16

19 kN 19 kN
20.2 mm 8

Design axis: Y-Y My=18.8 kNm BS5950 - 1990

Bending Moments Moment max = 20.30kNm/m@324 mm


20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440

2.00
Bending Moment (kNm/m)

4.00
6.00
8.00
10.0
12.0
14.0
16.0
18.0
20.0
Distance (mm)
Job Number Sheet
1 3
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
E-Mail : mail@prokon.com Calcs by Checked by Date
ABP MEC 13-JUNE-2016
Bending Moments & Design Output for (Critical) Load Case 1

2M22 or STIFFENEDPLATE Load2M


Case
22 or1
3M18 or 3M18 or
4M16 4M16

19 kN 19 kN 2.0 mm
8
12.3 mm

Design axis: Y-Y My=18.8 kNm BS5950 - 1990

Bending Moments Moment max = 19.69kNm/m@324 mm


20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440

2.00
Bending Moment (kNm/m)

4.00
6.00
8.00
10.0
12.0
14.0
16.0
18.0

Distance (mm)
Job Number Sheet
1 4
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
Calcs by Checked by Date
E-Mail : mail@prokon.com ABP MEC 13-JUNE-2016

Design Drawing of base plate

450
115 219

219x5CHS

450
219

370
4M22 gr 4.8

Bolt hole size:24 mm


115

40
40 40
Plan

6
5 mmstiffeners
110
14

Elevation

DETAIL 1
Job Number Sheet
1 5
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
E-Mail : mail@prokon.com Calcs by Checked by Date
ABP MEC 13-JUNE-2016

Base plate design by PROKON. (Basepl Ver W2.4.01 - 01 Apr 2008)

Design code : BS5950 - 1990


Title :
S11
Input Data

Column on Base Plate:


32x2.5

Base Plate Geometry

Plate Length L (mm) 450


Plate Width W (mm) 450
Offset L1 (mm) 115.45
Offset W1 (mm) 115.45
Bolt distance a1 (mm) 40
Bolt distance a2 (mm) 40
Bolt distance a3 (mm) 40
Bolt distance a4 (mm) 40

General Parameters

Concrete: fcu (MPa) 35


Plate: fy (MPa) 250
Welds: fuw (MPa) 500
Bolt Grade 4.8
Use studs (Y/N) Y

Loads

Load P Mx My Load
Case (kN) (kNm) (kNm) Factor
1 140.512 9.094 10.026
2 -59.688 9.094 10.026
Job Number Sheet
1 6
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
Calcs by Checked by Date
E-Mail : mail@prokon.com ABP MEC 13-JUNE-2016

Sketch of base plate

BS5950 - 1990 X

a4=40.0
L=450.0
L1=115.5 219.1

W=450.0
219.1
Y Y

a3=40.0
W1=115.5

a1=40.0 a2=40.0

Bending Moments & Design Output for (Critical) Load Case 1

2M22 or UNSTIFFENEDPLATE Load2M


Case
22 or1
3M18 or 3M18 or
4M16 4M16

19 kN 19 kN
20.2 mm 8

Design axis: Y-Y My=18.8 kNm BS5950 - 1990

Bending Moments Moment max = 20.30kNm/m@324 mm


20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440

2.00
Bending Moment (kNm/m)

4.00
6.00
8.00
10.0
12.0
14.0
16.0
18.0
20.0
Distance (mm)
Job Number Sheet
1 7
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
E-Mail : mail@prokon.com Calcs by Checked by Date
ABP MEC 13-JUNE-2016
Bending Moments & Design Output for (Critical) Load Case 1

2M22 or STIFFENEDPLATE Load2M


Case
22 or1
3M18 or 3M18 or
4M16 4M16

19 kN 19 kN 2.0 mm
8
12.3 mm

Design axis: Y-Y My=18.8 kNm BS5950 - 1990

Bending Moments Moment max = 19.69kNm/m@324 mm


20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440

2.00
Bending Moment (kNm/m)

4.00
6.00
8.00
10.0
12.0
14.0
16.0
18.0

Distance (mm)
Job Number Sheet
1 8
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
Calcs by Checked by Date
E-Mail : mail@prokon.com ABP MEC 13-JUNE-2016
Bending Moments & Design Output for Load Case 2

2M18 or UNSTIFFENEDPLATE Load2M


Case
18 or2
3M16 or 3M16 or
4M14 4M14

6
16.5 mm82 kN 82 kN

Design axis: Y-Y My=19.1 kNm BS5950 - 1990

Bending Moments Moment max = -13.67kNm/m@115 mm


-14.0
Bending Moment (kNm/m)

-12.0
-10.0
-8.00
-6.00
-4.00
20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440

-2.00

2.00

Distance (mm)
Job Number Sheet
1 9
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
E-Mail : mail@prokon.com Calcs by Checked by Date
ABP MEC 13-JUNE-2016
Bending Moments & Design Output for Load Case 2

2M18 or STIFFENEDPLATE Load2M


Case
18 or2
3M16 or 3M16 or
4M14 4M14
5

2.0 mm
6
10.1 mm82 kN 82 kN

Design axis: Y-Y My=19.1 kNm BS5950 - 1990

Bending Moments Moment max = -13.40kNm/m@115 mm


-14.0
Bending Moment (kNm/m)

-12.0
-10.0
-8.00
-6.00
-4.00
20.0
40.0
60.0
80.0
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440

-2.00

2.00
4.00
Distance (mm)
Job Number Sheet
1 10
Job Title
DESIGN OF BASEPLATE
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com SDP
Calcs by Checked by Date
E-Mail : mail@prokon.com ABP MEC 13-JUNE-2016

Design Drawing of base plate

450
115 219

219x5CHS

450
219

370
4M22 gr 4.8

Bolt hole size:24 mm


115

40
40 40
Plan

6
5 mmstiffeners
110
14

Elevation

DETAIL 1
SAFE Analysis & Design Report

PIPE RACK FTG


PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Model Definition 29 June 2016

Model Definition

Figure 1: Finite element model

Page 2 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Model geometry 29 June 2016

Model geometry
This section provides model geometry information, including items such as joint coordinates, joint restraints, and
element connectivity.

Connectivity

Concrete Slab Design Summary 02 - Span Definition Data

Strip SpanID SpanLength StartDist GlobalX1 GlobalY1 GlobalX2 GlobalY2


m m m m m m
CSA2 Span 1 1.50000 0.00000 0.00000 -0.75000 0.00000 0.75000
CSA3 Span 1 1.50000 0.00000 0.00000 1.25000 0.00000 2.75000
CSA5 Span 1 1.50000 0.00000 2.20000 0.75000 2.20000 -0.75000
CSA6 Span 1 1.50000 0.00000 2.20000 2.75000 2.20000 1.25000
CSB1 Span 1 2.20000 0.75000 0.00000 0.00000 2.20000 0.00000
CSB2 Span 1 2.20000 0.75000 0.00000 2.00000 2.20000 2.00000
MSA1 Span 1 1.50000 0.00000 1.10000 1.25000 1.10000 2.75000
MSA2 Span 1 1.50000 0.00000 1.10000 -0.75000 1.10000 0.75000

Model properties
This section provides model properties, including items such as material properties, section properties, and support
properties.

Material properties

Material Properties 03 - Concrete

Material E U A UnitWt Fc LtWtConc


N/mm2 1/C kN/m3 N/mm2
C30 25742.96000 0.200000 9.9000E-06 2.3563E+01 30.00000 No

Material Properties 04 - Rebar

Material E UnitWt Fy Fu
N/mm2 kN/m3 N/mm2 N/mm2
G60 200000 7.6973E+01 414.00000 620.00000

Page 3 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Model assignments 29 June 2016

Section properties
Slab Properties 02 - Solid Slabs
Slab Properties 02 - Solid Slabs
Slab Type MatProp Thickness Ortho
mm
F350 Footing C30 350.000 No

Support properties

Soil Properties
Soil Properties
Soil Subgrade
kN/m3
21K 2.1000E+04

Model assignments
This section provides model assignments, including assignments to slabs, beams, and joints.

Slab assignments

Slab Property Assignments

Area SlabProp

5 F350
6 F350

Support assignments

Soil Property Assignments


Soil Property Assignments

Area SoilProp

5 21K
6 21K

Page 4 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Model loading 29 June 2016

Model loading
This section provides model loading information, including load patterns, load cases, and load combinations.

Load patterns

Load Patterns

LoadPat Type SelfWtMult

DEAD DEAD 1.000000


LIVE LIVE 0.000000
WZ WIND 0.000000

Load Assignments - Point Loads, Part 1 of 2

Point LoadPat Fx Fy Fgrav


kN kN kN
29 DEAD -11.807 2.008 33.449
29 WZ 0.134 -22.294 -55.483
29 LIVE -4.244 0.692 10.264
30 DEAD -6.480 -0.600 16.692
30 LIVE -2.306 -0.229 4.238
30 WZ 0.257 -4.646 -58.694
31 DEAD -0.645 -1.292 -13.206
31 LIVE -0.223 -0.437 -3.378
31 WZ -0.185 -8.516 58.575
32 WZ -0.188 -11.761 55.978
32 DEAD -0.618 0.808 55.213
32 LIVE -0.229 0.302 18.279

Load Assignments - Point Loads, Part 2 of 2

Point Mx My Mz XDim YDim


kN-m kN-m kN-m mm mm
29 0.6170 5.1350 0.0610 500.000 500.000
29 -9.8610 -0.2890 -0.0260 500.000 500.000
29 0.2230 1.8330 0.0220 500.000 500.000
30 -0.2490 3.4220 0.0340 500.000 500.000
30 -0.0980 1.2150 0.0120 500.000 500.000
30 -2.7150 -0.3130 -0.3146 500.000 500.000
31 -0.4450 1.1560 0.0280 500.000 500.000
31 -0.1630 0.4130 0.0100 500.000 500.000
31 -3.9880 -0.2100 0.2330 500.000 500.000
32 -6.4600 0.2300 -0.1900 500.000 500.000
32 0.2280 1.1560 0.0370 500.000 500.000
32 0.0890 0.4140 0.0130 500.000 500.000

Page 5 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Model loading 29 June 2016

Load cases
Load Cases 02 - Static
LoadCase InitialCond AType

DEAD Zero Linear


LIVE Zero Linear
WZ Zero Linear

Table 16: Load Cases 06 - Loads Applied


Table 16: Load Cases 06 - Loads Applied
LoadCase LoadPat SF

DEAD DEAD 1.000000


LIVE LIVE 1.000000
WZ WZ 1.000000

4.3. Load combinations

Table 17: Load Combinations


Table 17: Load Combinations
Combo Load SF Type DSStrength DSServInit DSServNorm DSServLong

SERVICE-1 DEAD 1.00000 Linear Add No No Yes No


0
SERVICE-2 DEAD 1.00000 Linear Add No No Yes No
0
SERVICE-2 LIVE 1.00000
0
UDCONU1 DEAD 1.40000 Linear Add Yes No No No
0
UDCONU2 DEAD 1.20000 Linear Add Yes No No No
0
UDCONU2 LIVE 1.60000
0
UDCONU3 DEAD 1.20000 Linear Add Yes No No No
0
UDCONU3 LIVE 1.00000
0
UDCONU3 WZ 1.60000
0
UDCONU4 DEAD 1.20000 Linear Add Yes No No No
0
UDCONU4 LIVE 1.00000
0
UDCONU4 WZ -1.60000
0
UDCONU5 DEAD 0.90000 Linear Add Yes No No No
0
UDCONU5 WZ 1.60000
0
UDCONU6 DEAD 0.90000 Linear Add Yes No No No
0

Page 6 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Model loading 29 June 2016

Table 17: Load Combinations


Combo Load SF Type DSStrength DSServInit DSServNorm DSServLong

UDCONU6 WZ -1.60000
0

Footing Properties (t=350mm)

Page 7 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Model loading 29 June 2016

Soil Subgrade (21000 kN/cum)

Page 8 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Analysis results 29 June 2016

Analysis results
Support results
This section provides support results, including items such as column, support, and spring reactions, .

Soil Pressures - Summary


Table 18: Soil Pressures - Summary
Panel OutputCase MaxPress MinPress GlobalXMax GlobalYMax GlobalXMin GlobalYMin
N/mm2 N/mm2 m m m m
1 DEAD -0.004099 -0.027810 2.02500 0.75000 0.00000 0.75000
1 LIVE 0.001004 -0.006471 2.02500 0.75000 0.00000 0.75000
1 WZ 0.027020 -0.025990 1.10000 2.00000 2.02500 0.75000

Structure results
Sum Of Reactions, Part 1 of 2

OutputCase GlobalFX GlobalFY GlobalFZ GlobalMX GlobalMY GlobalMZ


kN kN kN kN-m kN-m kN-m
DEAD 19.550 -0.924 183.691 191.6737 -119.2352 -32.5716
LIVE 7.002 -0.328 29.403 28.9530 -5.7670 -11.6918
WZ -0.018 47.217 0.376 -205.3300 0.8438 30.0360

Sum Of Reactions, Part 2 of 2


Sum Of Reactions, Part 2 of 2
OutputCase GlobalX GlobalY GlobalZ
m m m
DEAD 0.00000 0.00000 0.00000
LIVE 0.00000 0.00000 0.00000
WZ 0.00000 0.00000 0.00000

Page 9 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Design 29 June 2016

Design

Figure 3: Finite element model

Page 10 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Design summary 29 June 2016

Design summary
This section provides design information for beams, strips, and punching checks.

Overwrites
Slab Design Overwrites 01 - Strip Based

Strip Layer DesignType RLLF IgnorePT RebarMat

CSA2 A Column 1.000000 No G60


CSA3 A Column 1.000000 No G60
CSA5 A Column 1.000000 No G60
CSA6 A Column 1.000000 No G60
CSB1 B Column 1.000000 No G60
CSB2 B Column 1.000000 No G60
MSA1 A Middle 1.000000 No G60
MSA2 A Middle 1.000000 No G60

Slab Design Overwrites 02 - Finite Element Based, Part 1 of 2

Area RebarMat

5 G60
6 G60

Slab Design Overwrites 02 - Finite Element Based, Part 2 of 2

Area RLLF Design IgnorePT

5 1.000000 Yes No
6 1.000000 Yes No

Slab design

Concrete Slab Design Summary 01 - Flexural And Shear Data, Part 1 of 3

Strip SpanID Location FTopCombo FTopMomen FTopArea


t
kN-m mm2
CSA2 Span 1 Start UDCONU3 -4.7496 39.131
CSA2 Span 1 Middle UDCONU6 -12.6004 104.535
CSA2 Span 1 End UDCONU3 -7.0545 69.075
CSA3 Span 1 Start UDCONU4 -5.5785 73.216
CSA3 Span 1 Middle UDCONU5 -16.4455 135.743
CSA3 Span 1 End UDCONU5 -1.2599 63.357
CSA5 Span 1 Start UDCONU4 -5.2714 43.434

Page 11 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Design summary 29 June 2016

Strip SpanID Location FTopCombo FTopMomen FTopArea


t
kN-m mm2
CSA5 Span 1 Middle UDCONU4 -21.3548 176.964
CSA5 Span 1 End UDCONU4 -3.1499 34.740
CSA6 Span 1 Start UDCONU3 -2.6502 29.281
CSA6 Span 1 Middle UDCONU5 -15.1606 125.112
CSA6 Span 1 End UDCONU4 -4.1967 41.041
CSB1 Span 1 Start UDCONU6 -8.4584 92.548
CSB1 Span 1 Middle UDCONU3 -22.9162 205.358
CSB1 Span 1 End UDCONU4 -26.8454 251.904
CSB2 Span 1 Start UDCONU5 -12.7814 114.510
CSB2 Span 1 Middle UDCONU4 -23.4612 237.047
CSB2 Span 1 End UDCONU3 -16.9044 154.028
MSA1 Span 1 Start UDCONU4 -6.6211 59.188
MSA1 Span 1 Middle UDCONU5 -8.7127 81.072
MSA1 Span 1 End UDCONU4 -3.7719 37.771
MSA2 Span 1 Start UDCONU3 -2.5142 28.054
MSA2 Span 1 Middle UDCONU6 -6.4401 55.601
MSA2 Span 1 End UDCONU3 -4.5889 44.165

Concrete Slab Design Summary 01 - Flexural And Shear Data, Part 2 of 3

Strip SpanID Location FBotCombo FBotMomen FBotArea


t
kN-m mm2
CSA2 Span 1 Start UDCONU4 3.2329 39.554
CSA2 Span 1 Middle UDCONU3 32.6877 285.546
CSA2 Span 1 End UDCONU3 8.7465 83.034
CSA3 Span 1 Start UDCONU4 8.9551 101.054
CSA3 Span 1 Middle UDCONU4 28.6170 268.338
CSA3 Span 1 End UDCONU3 4.3770 60.714
CSA5 Span 1 Start UDCONU5 4.3310 46.318
CSA5 Span 1 Middle UDCONU5 17.4737 157.190
CSA5 Span 1 End UDCONU4 2.8419 32.202
CSA6 Span 1 Start UDCONU4 5.2764 45.267
CSA6 Span 1 Middle UDCONU4 23.1917 196.898
CSA6 Span 1 End UDCONU4 5.3659 50.679
CSB1 Span 1 Start UDCONU3 37.9154 348.983
CSB1 Span 1 Middle UDCONU6 13.3475 121.198
CSB1 Span 1 End UDCONU5 12.8787 131.333
CSB2 Span 1 Start UDCONU4 31.9265 309.475
CSB2 Span 1 Middle UDCONU5 14.9305 153.810
CSB2 Span 1 End UDCONU4 22.3262 204.672
MSA1 Span 1 Start UDCONU5 5.4962 52.808
MSA1 Span 1 Middle UDCONU4 13.9769 121.974
MSA1 Span 1 End UDCONU6 0.7242 16.211
MSA2 Span 1 Start UDCONU3 2.5615 28.443
MSA2 Span 1 Middle UDCONU3 9.4905 78.584
MSA2 Span 1 End UDCONU4 3.8994 39.468

Page 12 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Design summary 29 June 2016

Table 28: Concrete Slab Design Summary 01 - Flexural And Shear Data, Part 3 of 3
Table 28: Concrete Slab Design Summary 01 - Flexural And Shear Data, Part 3 of 3
Strip SpanID Location VCombo VForce VArea Status Layer
kN mm2/m
CSA2 Span 1 Start 0.000 0.000 OK A
CSA2 Span 1 Middle UDCONU3 38.676 0.000 OK A
CSA2 Span 1 End UDCONU3 44.599 0.000 OK A
CSA3 Span 1 Start 0.000 0.000 OK A
CSA3 Span 1 Middle UDCONU4 31.684 0.000 OK A
CSA3 Span 1 End UDCONU4 25.987 0.000 OK A
CSA5 Span 1 Start 0.000 0.000 OK A
CSA5 Span 1 Middle UDCONU4 30.543 0.000 OK A
CSA5 Span 1 End UDCONU4 23.148 0.000 OK A
CSA6 Span 1 Start 0.000 0.000 OK A
CSA6 Span 1 Middle UDCONU4 20.698 0.000 OK A
CSA6 Span 1 End UDCONU4 31.655 0.000 OK A
CSB1 Span 1 Start UDCONU3 49.527 0.000 OK B
CSB1 Span 1 Middle UDCONU3 48.922 0.000 OK B
CSB1 Span 1 End UDCONU4 61.046 0.000 OK B
CSB2 Span 1 Start UDCONU4 33.064 0.000 OK B
CSB2 Span 1 Middle UDCONU4 48.108 0.000 OK B
CSB2 Span 1 End UDCONU4 32.857 0.000 OK B
MSA1 Span 1 Start 0.000 0.000 OK A
MSA1 Span 1 Middle UDCONU4 20.781 0.000 OK A
MSA1 Span 1 End UDCONU4 11.898 0.000 OK A
MSA2 Span 1 Start 0.000 0.000 OK A
MSA2 Span 1 Middle UDCONU3 4.358 0.000 OK A
MSA2 Span 1 End UDCONU3 12.340 0.000 OK A

Page 13 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Design summary 29 June 2016

Soil Pressure-Service Load-1

Soil Pressure-Service Load-2

Page 14 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Design summary 29 June 2016

Punching Shear Ratio

Top Reinforcement (T16)

Page 15 of 16
PIPE RACK FTG.fdb SAFE v12.3.0 - License #
Design summary 29 June 2016

Bottom Reinforcement (T16)

Page 16 of 16

You might also like