The document provides details on a cement plug job completed on April 5, 2011 using Rig EM E-1500 No. 14. It lists the interval, formation, date, and characteristics of the single cement plug placed between 2723-2786 meters in the Shuaiba formation, including the cement type, amount pumped, additive used, displacement fluid properties, and maximum pressure reached during the job.
The document provides details on a cement plug job completed on April 5, 2011 using Rig EM E-1500 No. 14. It lists the interval, formation, date, and characteristics of the single cement plug placed between 2723-2786 meters in the Shuaiba formation, including the cement type, amount pumped, additive used, displacement fluid properties, and maximum pressure reached during the job.
The document provides details on a cement plug job completed on April 5, 2011 using Rig EM E-1500 No. 14. It lists the interval, formation, date, and characteristics of the single cement plug placed between 2723-2786 meters in the Shuaiba formation, including the cement type, amount pumped, additive used, displacement fluid properties, and maximum pressure reached during the job.
Head (Prod) Latest and Updated Green Signal Programme For Tank No. I, II & VI From 11.09.2010 To 20.09.2010 (This Is in Line With Latest Production Plan Finalised With MKTG On 09-09-2010)