SCHEDULE - A
1 The Site
1.1 Site of the Four-Lane Project Highway shall include the land, buildings, structures and
road works as described in Annex-I of this Schedule-A.
1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II
of this Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road works, trees and
any other immovable property on, or attached to, the Site shall be prepared jointly by
the Authority Representative and the Contractor, and such inventory shall form part of
the memorandum referred to in Clause 8.2.1 of this Agreement.
1.4 The alignment plans of the Project Highway are specified in Annex-III. In the case of
sections where no modification in the existing alignment of the Project Highway is
contemplated, the alignment plan has not been provided. Alignment plans have only
been given for sections where the existing alignment is proposed to be upgraded. The
Proposed profile of the project Highways shall be followed by the contractor with
minimum FRL as indicated in the alignment plan. The contractor, however,
improve/upgrade the road profile as indicated in Annexure-III based on site/design
requirement
1.5 The status of the environment clearances obtained or awaited is given in Annex IV.
Annex - I
(Schedule-A)
Site
Note: Through suitable drawings and description in words, the land, buildings structures and roads works
comprising the site shall be specified briefly but precisely in this Annex-I. All the chainages /Location
referred to in Annex-I to Schedule-A shall be existing chainages.
1. Site
The site of project highway is a section of National Highway -63, which starts from 0.980
km away from Existing km 297.600 of NH 13 (End of Interchange Ramp towards Hospet
Side) and joining at km 284.360 of Existing NH 63. (This stretch act as Bypass to Hospet)
and Terminates at km 368.920 Karnataka/AP Border in the state of Karnataka. The
existing road has two lane undivided carriageway except in Toranangallu it is 4-Lane
divided carriageway (0.6 km) in an aggregate length of 90 km. The land, carriageway
and structures comprising the Site are described below
2. Land
The Site of the Project Highway comprises the land (sum total of land already in
possession and land to be possessed) as described below:
3. Carriageway
The present carriageway of the project highway is a 2 Lane undivided carriageway except in
Toranangallu it is 4-Lane divided carriageway (0.6 km). The type of the existing pavement is
flexible. The present configuration of the carriageway is presented as below:
4. Major Bridges
The Site includes the following ROB (road over railway line)/RUB (road under railway
line):
6. Grade separators
7. Minor bridges
-Nil-
10. Culverts
Sl. No Existing km Type of Culvert Span Arrangement (m) Width of Culvert (m)
Sl. No Existing km Type of Culvert Span Arrangement (m) Width of Culvert (m)
Sl. No Existing km Type of Culvert Span Arrangement (m) Width of Culvert (m)
Sl. No Existing km Type of Culvert Span Arrangement (m) Width of Culvert (m)
Sl. No Existing km Type of Culvert Span Arrangement (m) Width of Culvert (m)
The details of Bus Stop without Busbay on the site are as follows:
Sl. Existing
Side Village name /Leads to Remarks
No km
LHS, Kariganur Railway station
1 287.050 RHS Bus stop
Road
2 288.000 RHS Near Hospet, Leads to Mines Bus stop
3 288.600 RHS P V S Mines Road Bus stop
4 293.600 LHS Papi Nayakanahalli Bus shelter
5 296.600 RHS JSW Factory Bus stop
6 297.300 LHS & RHS Bayiluvaddigere Village Bus shelter
7 301.970 LHS Darmasagara Village Bus Shelter
8 303.975 RHS To Kotaginahallu Bus shelter
9 305.600 RHS Gadiganuru Village Bus shelter
10 307.450 LHS Bavanahalli Village Bus shelter
11 311.100 LHS & RHS Kudathini Village Bus shelter
12 313.450 LHS & RHS Toranagallu Village Bus shelter
13 314.850 LHS Toranagallu Village Bus shelter
14 315.040 RHS Toranagallu Village Bus shelter
JSW Main Gate (to Sandur)
15 315.450 LHS Bus shelter
Toranagallu village
16 319.920 LHS To Sulthanpur Bus shelter
17 323.500 RHS Kudithani Village Bus shelter
18 324.650 LHS Kudithani Village Bus shelter
19 329.400 RHS Towards Veni Verapura Bus shelter
20 335.160 LHS Rameshwari Nagar Bus shelter
21 338.850 RHS To Bangalore Bypass Road Bus shelter
22 339.000 RHS To Village Bus shelter
23 340.520 RHS To Village Bus shelter
24 341.000 RHS To Village Bus shelter
25 355.200 RHS To Budhihallu Bus shelter
26 357.600 LHS Paramadevanahalli Village Bus stop
27 358.450 RHS To Roopanagudi Bus stop
Right Hand
Sl. No Existing km Length (m) Left Hand Side
Side
Nil
Existing Km TYPE
Length in Masonry/CC Earthern
Sl. No Side
From To km
(Pucca) (Kutcha)
1 280.650 281.600 0.950 Both Pucca
2 282.550 282.570 0.020 RHS Pucca
3 284.200 284.260 0.060 RHS Pucca
4 284.280 284.400 0.120 Both Pucca
5 284.530 284.620 0.090 RHS Pucca
6 284.800 284.940 0.140 LHS Pucca
7 284.870 284.890 0.020 RHS Pucca
8 285.000 285.030 0.030 LHS Pucca
9 285.030 285.800 0.770 RHS Pucca
10 285.230 285.400 0.170 LHS Pucca
11 286.300 286.630 0.330 RHS Pucca
12 286.750 286.820 0.070 LHS Pucca
13 286.970 287.020 0.050 RHS Pucca
14 287.160 287.180 0.020 RHS Pucca
15 287.310 287.350 0.040 LHS Pucca
16 288.450 288.570 0.120 RHS Pucca
17 290.250 290.700 0.450 LHS Pucca
18 291.500 291.760 0.260 RHS Pucca
19 292.050 292.100 0.050 LHS Pucca
20 292.150 292.200 0.050 RHS Pucca
21 292.300 292.800 0.500 LHS Pucca
22 292.520 292.720 0.200 RHS Pucca
23 293.300 293.550 0.250 Both Pucca
24 293.850 293.905 0.055 LHS Pucca
25 293.850 294.215 0.365 RHS Pucca
26 294.680 295.520 0.840 Both Pucca
27 295.820 295.970 0.150 RHS Pucca
28 296.000 296.150 0.150 LHS Pucca
29 296.000 296.520 0.520 RHS Pucca
30 296.570 296.670 0.100 LHS Pucca
31 296.620 297.260 0.640 RHS Pucca
32 297.950 298.080 0.130 LHS Pucca
33 298.880 298.900 0.020 RHS Pucca
34 298.900 299.550 0.650 LHS Pucca
35 300.800 301.040 0.240 RHS Pucca
Existing Km TYPE
Length in Masonry/CC Earthern
Sl. No Side
From To km
(Pucca) (Kutcha)
36 301.080 301.455 0.375 LHS Pucca
37 301.650 302.640 0.990 RHS Pucca
38 302.180 302.220 0.040 LHS Pucca
39 303.070 303.270 0.200 RHS Pucca
40 303.230 303.430 0.200 LHS Pucca
41 303.400 303.900 0.500 RHS Pucca
42 303.890 304.550 0.660 LHS Pucca
43 304.600 305.200 0.600 RHS Pucca
44 305.530 305.850 0.320 Both Pucca
45 307.120 308.430 1.310 Both Pucca
46 309.750 309.880 0.130 RHS Pucca
47 310.900 310.920 0.020 RHS Pucca
48 312.900 313.600 0.700 Both Pucca
49 314.750 323.200 8.450 Both Pucca
50 324.750 333.000 8.250 Both Pucca
51 333.000 335.000 2.000 Both Pucca
52 335.800 335.900 0.100 RHS Pucca
53 357.600 357.620 0.020 RHS Pucca
54 361.330 362.050 0.720 LHS Pucca
55 362.850 363.300 0.450 LHS Pucca
56 365.050 365.100 0.050 RHS Pucca
57 365.600 365.900 0.300 RHS Pucca
Category of Cross
Grade
Sl. At Type of Leads Road
Existing km Separ Side Remarks
No grade Junction to N S MD Othe
ated
H H R rs
Junction from
Existing
Hospet 0.22 km away
1 Hospet 3 Legged LHS
Town from start of the
Bypass
project stretch
Junction from
Existing
Sandur, 1.914 km away
2 Hospet 4 Legged Both
Hospet from start of the
Bypass
project stretch
3 293.300 3 Legged LHS Hampi
Category of Cross
Grade
Sl. At Type of Leads Road
Existing km Separ Side Remarks
No grade Junction to N S MD Othe
ated
H H R rs
JSW
4 296.530 3 Legged RHS
Factory
5 357.585 3 Legged LHS Kurnool 1 357.585
Veeera
pura,
6 364.960 4 Legged Both 2 364.960
Anatha
pur
(NH: National Highway, SH: State Highway, MDR: Major District Road)
Sl. Type of
Existing km Side Leads to Remarks
No junction
Existing Junction from 4.190
1 Hospet 3 Legged LHS Hospet Town km away from start of
Bypass the project stretch
2 284.360 3 Legged LHS Hospet Town
3 285.530 3 Legged RHS Sankalpuram
4 287.050 3 Legged LHS Kariganur
5 304.010 3 Legged RHS Kotaginahallu
Kurekuppa,
6 311.110 4 Legged BOTH
Mud road
7 319.920 3 Legged RHS Sulthanpur
8 327.910 3 Legged RHS Hothur
9 328.900 3 Legged RHS MBT steel Factory
10 329.340 3 Legged LHS Veniverapua
11 330.110 3 Legged RHS Janekunte
12 330.630 3 Legged RHS Matta
13 355.200 3 Legged LHS Budhihallu
14 355.370 3 Legged RHS Godehal
15 356.000 3 Legged RHS Godehal
16 358.500 3 Legged RHS Roopangudi
16. Bypasses
The details of the existing road sections proposed to be bypassed are as follows:
Name of
Sl. Chainage (km) Length
bypass to Remarks
No From Km to Km (in Km)
town
Nil
Kilometre stones exist along the entire length of the project highway (Excluding existing
Hospet Bypass and some of the location km Stone is not available). The relationship
between the Existing Chainage and the Design Chainage as per field surveys is given
below.
Annex - II
(Schedule-A)
The dates on which the Authority shall provide Right of Way to the Contractor on different
stretches of the Site are stated below:
Annex - III
(Schedule-A)
Alignment Plans
The existing alignment of the Project Highway shall be modified in the following sections as per
the alignment plan indicated below:
Annex - IV
(Schedule-A)
Environment Clearances
1. Environmental clearance is obtained from MoEF for this project, Vide Letter Ministry of
Environment & Forest Letter F.No.10-40/2011-IA-III, dated 08.03.2013.
2. Under para 6(i) of MoEF clearance letter mentioned at para 1 above proposal. Since the
project road is within 10 km of Daroji Bear Sanctuary. Hence prior clearance from the
Standing Committee of NBWL should be obtained. The proposal for obtaining clearance
from NBWL already submitted to PCCF (wild life, Karnataka). After obtaining
recommendations of SBWL Karnataka in its 7th meeting dated 15.07.2014.
3. The SBWL while recommending the alignment have suggested mitigation measures that
the user agency shall construct 7-8 under passes for Bear crossing in addition to chain
link mesh along the stretch of Daroji Bear Sanctuary. These mitigation measures are
included in the proposal Under clause 15 of Schedule-B.
SCHEDULE - B
(See Clause 2.1)
Development of the Project Highway shall include design and construction of the Project
Highway as described in this Schedule-B and in Schedule-C.
Rehabilitation and augmentation shall include four laning and strengthening of the
Project Highway as described in Annex-I of this Schedule-B and in Schedule-C.
The Project Highway shall be designed and constructed in conformity with the
Specifications and Standards specified in Annex-I of Schedule-D.
Annex - I
(Schedule-B)
Description of Four-Laning
1.1 The Project Highway shall follow the existing alignment unless otherwise specified by
the Authority and shown in the alignment plans specified in Annex III of Schedule-A.
Geometric deficiencies, if any, in the existing horizontal and vertical profiles shall be
corrected as per the prescribed standards for [Plain/Rolling] terrain to the extent land is
available.
1.2 Four lane divided Carriageway shall be undertaken. The paved carriageway shall be
18.0m (Eighteen), 19m (Nineteen) and 23 m (Twenty Three) wide in excluding the
Median & Service Road in accordance with the typical cross sections drawings enclosed
under Schedule-B Annex-I.
Provided that in the built-up areas the width of the carriageway shall be as specified in
the following table:
Location Typical
Sl. Built-up Section Width
Cross Remarks
No (Township) From To in m
section
1 292+820 293+700 23.0 4 (i) & 4 (ii)
Papinayakanahalli
293+700 293+900 19.0 2
2 Bayiluvadigere 297+126 297+526 19.0 2
305+322 305+555 19.0 2
TCS as per clause
3 Gadiganuru 305+555 305+980 23.0 4 2.11, Annex-I of
305+980 306+082 19.0 2 Schedule-B
307+382 307+540 19.0 2A
4 Bavanahalli 307+540 307+900 19.0 2B
307+900 307+912 19.0 2
363+760 363+900 19.0 2
5 Paramadevanahalli
363+900 364+500 23.0 4 (i) & 4 (ii)
1.2.2 Except as otherwise provided in this Agreement, the width of the paved carriageway and
cross-sectional features shall conform to paragraph 1.1 above.
2.1 General
Geometric design and general features of the Project Highway shall be in accordance
with Section 2 of the Manual.
The design speed shall be the minimum design speed of 80 km per hr for plain/ rolling
terrain.
In the following sections, where improvement of the existing road geometrics to the
prescribed standards is not possible, the existing road geometrics shall be improved to
the extent possible within the given right of way and proper road signs and safety
measures shall be provided:
Design Chainage
Sl. (Km) Type of Deficiency Remarks
no
From To
Curve could not be
Design Speed is restricted to improved due to
1 280+080 280+600 65 Kmph due to curve existing Pylons on both
having radius of 200 m. sides & crossing of HT
Lines.
2.3(ii) Bypasses: There are four bypasses in the project highway. The details of bypasses to be
provided are given below;
2.3(iii) Realignments: There are three major realignments in the project highway. The details of
realignments to be provided are given below;
(b) In open country, paved shoulders of 1.5 m width shall be provided and balance 2.0
m width shall be covered with 150 mm thick compacted layer of granular material.
(c) Design and specifications of paved shoulders and granular material shall conform
to the requirements specified in paragraphs 5.9.8(i) and 5.9.8(ii) of the Manual.
2.6.2 Lateral clearance: The width of the opening at the underpasses shall be as follows:
Design Vertical
Sl. Existing Chainage Span/opening
Chainage clearance Remarks
No (Km) (m)
(Km) (m)
Hospet Town Road
1 Hospet Old Bypass 280+300 1 x 12 5.5
(SH), Width 2X12.5m
2 Hospet Old Bypass 281+994 1 x 12 5.5 SH-49, Width 2X12.5m
SH-131,Width 2X12.5m
1 x 20 VUP with Viaduct spans
3 293.260 293+250 (Obligatory 5.5 For Minimum length of
Span) viaduct refer schedule-
B Clause : 3-b
4 296.520 296+493 1 x 12 5.5 SH-131, Width 2X12.5m
Kudithani
5 324+475 1 x 12 5.5 SH-132, Width 2X12.5m
Realignment
6 Bellary Bypass 338+505 1 x 12 5.5 SH-132
2.7.1 Lateral and vertical clearances at overpasses shall be as per paragraph 2.11 of the
Manual.
2.7.2 Lateral clearance: The width of the opening at the overpasses shall be as follows:
Location
(chainage) Span/opening
Sl. No Remarks
(from km to (m)
km)
Nil
Service roads & Slip Roads shall be constructed at the locations and for the lengths
indicated below:
(a) Service road: Service road shall be provided at the following locations
(b) Slip road: Slip road shall be provided at the following locations
Design Chainage
Sl. (Km) Length Slip Road Total
Side Remarks
No in m Width, m Length, m
From To
1 280+080 280+600 520 Both 5.5 1040
2 281+660 282+620 960 Both 5.5 1920
3 296+290 297+126 836 Both 5.5 1672
4 323+900 324+900 1000 Both 5.5 2000
5 334+000 334+708 708 Both 5.5 1416
6 338+320 339+645 1325 Both 5.5 2650
7 344+330 345+250 920 Both 5.5 1840
8 350+350 351+080 730 Both 5.5 1460
9 354+975 355+600 625 Both 5.5 1250
10 371+140 371+800 660 Both 5.5 1320
Total Length, m 16568
2.9.1 Grade separated structures shall be provided as per paragraph 2.13 of the Manual. The
requisite particulars are given below:
Improvement
provided (m)
Type of Road
Viaduct to be
Minimum
Proposed
Salient Features
Remarks
length of
Sl. No
Design
Chainage
Type LHS RHS
Hospe
t
1 280+300 3 Legged Hospet VUP - Town
Road
(SH) -
2 281+994 4 Legged Hospet Sandur VUP - SH-49 -
100 + 100
(on
either SH-
3 293+250 3 Legged Hampi VUP Built-up
side of 131
obligator
y span)
JSW SH-
4 296+493 3 Legged VUP -
Factory 131 -
Kudithin SH-
5 324+475 4 Legged Belagallu VUP -
i 132 -
Belagallu
Ring
6 334+385 4 Legged Bellary & Hiriyur Flyover
Road
Road
SH-
7 338+505 4 Legged Bellary Belagallu VUP
132
Belagallu
Ring
8 339+080 4 Legged Bellary & Hiriyur Flyover
Road
Road
9 350+674 4 Legged Bellary Kanekal VUP SH
Rupanagu SH-
10 355+220 4 Legged Bellary VUP
di Road 128
100 + 100
(on
either NH-
11 364+120 3 Legged Kurnool VUP Built-up
side of 167
obligator
y span)
Village
12 371+507 4 Legged Anantapur VUP SH-32
Road
# Nala Training has to be done, since the nala crosses the proposed road at higher skew angle
2.9.2 In the case of grade separated structures, the type of structure and the level of the
Project Highway and the cross roads shall be as follows:
Sl. Existing
Location Type of Cross road at Remarks, if any
No (Km)
structure
(Km) Existing Raised Lowered
(m)
Level Level Level
Hospet Old
1 280+300 RCC BOX Hospet Town Road (SH)
Bypass
Hospet Old
2 281+994 RCC BOX SH-49
Bypass
3 293.260 293+250 RCC GIRDER SH-131
4 296.520 296+493 RCC BOX SH-131
Kudithan
5 324+475 RCC BOX SH-132
Realignments
Bellary
6 338+505 RCC BOX SH-132
Bypass
Bellary
7 350+674 RCC BOX SH
Bypass
Bellary
8 355+220 RCC BOX SH-128
Bypass
9 357.580 364+120 RCC BOX NH-167
10 365.000 371+507 RCC BOX SH-32
Minimum
Proposed
Design Vertical Width of
Sl. No Location structural
Chainage Clearance structure (m)
configuration (m)
(m)
Mincheri - 12.5 + Median* +
1 347+636 1 x 7.0 3.5
Mundrigi road 12.5
Note: - Median & Carriageway width tapering shall be provided as per IRC-SP-84-2014 Clause no
2.5.4.; median width tapering details provided in clause 1.3.4 in schedule B.
Length
Sl. No Proposed Typical Cross Sections Type of C/S
in m
4 Lane Divided Carriageway New Construction for Bypass/
1 1 56913
Reconstruction and Realignment in Rural Area
4 Lane Divided Carriageway - Concentric widening in Rural
2 1A 570
area
4 Lane Divided Carriageway - Eccentric widening in Rural
3 1B 23588
Area
4 Lane Divided Carriageway with service road - New
4 Construction for Realignment/ Reconstruction in Built-up 2 1087
Area
4 Lane Divided Carriageway with service road - Concentric
5 2A 158
widening in Built-up Area
4 Lane Divided Carriageway without service road - Eccentric
6 2B 360
widening in Built-up Area
7 Approach Cross section @ Existing ROB 3 820
8 Approach Cross Section Partially Embankment with RE wall 3A 1285
9 Approach Cross section @ ROB with RE Wall & Slip Roads 3B 920
Approach Cross section 4 (i) PUP/VUP with Service Road @
10 Built-up area and 4(ii) VUP with Service Road & Viaduct span 4 (i) & 4(ii) 1905
@ Built-up Area
11 Approach Cross section VUP/Flyover with Slip roads 5 7364
12 Approach Cross section - Cattle Pass 6 400
Total Length in m 95370
Different Types of Typical Cross Sections required to be developed in different segments of the
Project Highway are enclosed in Schedule-I Annex-I
All intersections and grade separators shall be as per Section 3 of the Manual. Existing
intersections which are deficient shall be improved to the prescribed standards.
Properly designed intersections shall be provided at the locations and of the types and
features given in the tables below:
Sl. Design
Existing km Type Side Leads to Remarks
No Chainage
Hospet, Village Minor
1 Hospet Bypass 283+720 4 Legged Both
Road Junction
Minor
2 Hospet Bypass 284+270 3 Legged LHS Hospet
Junction
Kariganaru, Minor
3 Hospet Bypass 285+980 4 Legged Both
Village Road Junction
Kariganaru, Minor
4 Hospet Bypass 286+620 4 Legged Both
Village Road Junction
Major
5 288.000 288+000 3 Legged LHS Hospet
Junction
Vadrahalli Minor
6 290+960 3 Legged RHS Village road
Realignment Junction
Village road, Minor
7 292.12 292+140 4 Legged Both
Varadahalli Junction
Minor
8 301.530 301+480 3 Legged RHS Dharmasagara
Junction
Dharmasagara Dharmasagara Minor
9 301+630 4 Legged Both
Realignment , Village Road Junction
Minor
10 302.410 302+300 3 Legged RHS Dharmasagara
Junction
Minor
11 304.010 303+900 3 Legged RHS Kotaginahallu
Junction
Kurekuppa, Minor
12 311.110 311+080 3 Legged RHS
Village Road Junction
Major
13 312.300 312+300 3 Legged RHS Thorangallu
Junction
Torangallu Minor
14 314+500 4 Legged Both Thorangallu
Bypass Junction
Major
15 316.870 316+540 3 Legged RHS Thorangallu
Junction
Minor
16 320.470 320+200 3 Legged RHS Sulthanpur
Junction
Major
17 Kudithini Bypass 323+350 3 Legged LHS Kudithini
Junction
Minor
18 Kudithini Bypass 324+050 4 Legged Both Kudithini
Junction
Minor
19 Kudithini Bypass 324+840 4 Legged Both Kudithini
Junction
Sl. Design
Existing km Type Side Leads to Remarks
No Chainage
Minor
20 Kudithini Bypass 325+400 4 Legged Both Kudithini
Junction
Major
21 326.100 326+350 3 Legged RHS Kudithini
Junction
Minor
22 327.910 328+470 3 Legged RHS Hothur
Junction
MBT Steel Minor
23 328.900 329+000 3 Legged RHS
Factory Junction
Minor
24 329.350 329+450 3 Legged LHS Verapura
Junction
Minor
25 330.110 330+170 3 Legged RHS Janekunte
Junction
Minor
26 330.630 330+690 3 Legged RHS Matta
Junction
Major
27 333.120 333+200 3 Legged LHS Bellary
Junction
Minor
28 Bellary Bypass 339+690 4 Legged Both Bellary
Junction
Bellary , Minor
29 Bellary Bypass 342+090 4 Legged Both
Honahalli Junction
Mincheri Minor
30 Bellary Bypass 347+630 4 Legged Both
Mundrigi road Junction
Mangamma Minor
31 Bellary Bypass 351+625 4 Legged Both
Camp Junction
Bobbukunta Minor
32 Bellary Bypass 351+970 4 Legged Both
Road Junction
Ibrahimpura Major
33 Bellary Bypass 352+770 4 Legged Both
Road Junction
Minor
34 Bellary Bypass 354+710 4 Legged Both Village Road
Junction
Minor
35 Bellary Bypass 356+000 4 Legged Both Village Road
Junction
Minor
36 Bellary Bypass 357+950 4 Legged Both Village Road
Junction
Major
37 354.850 361+300 3 Legged LHS Bellary
Junction
Minor
38 355.200 361+740 3 Legged LHS Budhihallu
Junction
Minor
39 355.370 361+910 3 Legged RHS Godehal
Junction
Minor
40 356.000 362+540 3 Legged RHS Godehal
Junction
Minor
41 358.500 365+020 3 Legged RHS Roopanagudi
Junction
Minor
42 362.800 369+330 3 Legged LHS Joladarshi
Junction
Note:
The concessionaire shall take up Detailed Engineering study to ascertain further details of all
intersections and treatment of the intersections shall be designed in accordance with the latest
guidelines mentioned out in section-3 of Manual.
Improvement
provided (m)
Type of Road
Viaduct to be
Minimum
Proposed
Salient Features
Remarks
length of
Sl. No
Design
Chainage
Type LHS RHS
Hospe
t
1 280+300 3 Legged Hospet VUP - Town
Road
(SH) -
2 281+994 4 Legged Hospet Sandur VUP - SH-49 -
100 + 100
(on
either SH-
3 293+250 3 Legged Hampi VUP Built-up
side of 131
obligator
y span)
JSW SH-
4 296+493 3 Legged VUP -
Factory 131 -
Kudithin SH-
5 324+475 4 Legged Belagallu VUP -
i 132 -
Belagallu
Ring
6 334+385 4 Legged Bellary & Hiriyur Flyover
Road
Road
SH-
7 338+505 4 Legged Bellary Belagallu VUP
132
Belagallu
Ring
8 339+080 4 Legged Bellary & Hiriyur Flyover
Road
Road
ROB
NH
9 344+708 4 Legged Bellary Rayadurga cum
150A
Flyover
10 350+674 4 Legged Bellary Kanekal VUP SH
Rupanagu SH-
11 355+220 4 Legged Bellary VUP
di Road 128
100 + 100
(on
NH-
12 364+120 3 Legged Kurnool VUP either Built-up
167
side of
obligator
Improvement
provided (m)
Type of Road
Viaduct to be
Minimum
Proposed
Salient Features
Remarks
length of
Sl. No
Design
Chainage
Type LHS RHS
y span)
Village
13 371+507 4 Legged Anantapur VUP SH-32
Road
4.1 Widening and improvement of the existing road embankment/cuttings and construction
of new road embankment/ cuttings shall conform to the Specifications and Standards
given in section 4 of the Manual and the specified cross sectional details. Deficiencies in
the plan and profile of the existing road shall be corrected.
4.2 Raising/cutting of the existing road shall be as per Para 4.2.1 (ii) of Manual.
*The length is tentative and actual length shall be as per Detailed Design carried out by
Contractor.
5 PAVEMENT DESIGN
5.1 Pavement design shall be carried out in accordance with Section 5 of the Manual.
Rigid pavement is proposed for the Carriageway and Paved shoulder of entire project
stretch, including Service Road, Bus bay Truck Lay Bye Rest area and toll plaza locations
Rigid pavement shall be designed for a minimum design period of 30 years. Stage
construction shall not be permitted.
Notwithstanding anything to the contrary contained in this Agreement or the Manual, the
Contractor shall design the new pavement for the Total Twoway Commercial Traffic (cvpd) in
the year of completion of construction. The total Two-way Commercial Traffic is 3265 (CVPD) in
the year of 2014.
6 ROADSIDE DRAINAGE
Drainage system including surface and subsurface drains for the Project Highway shall
be provided as per Section 6 of the Manual.
Note: The locations of RCC drain, earthen drain mentioned above are bare minimum and tentative and has
to be provided as per the manual and as per the site requirement.
Note: The locations of RCC drain, earthen drain mentioned above are bare minimum and tentative and has
to be provided as per the manual and as per the site requirement.
7 DESIGN OF STRUCTURES
7.1 General
7.1.1 All bridges, culverts and structures shall be designed and constructed in accordance
with section 7 of the Manual and shall conform to the cross-sectional features and
other details specified therein.
7.1.2 Width of the carriageway of new bridges and structures more than 60.0 m length having
carriageway width less than 7.5m.
Existing Design
Sl. No Name of the River
Chainage Chainage
-NIL-
7.1.3 The following structures shall be provided with footpaths with following features:
Major Bridges:
Minor Bridges:
Design
Sl. No Width of carriageway and cross-sectional features
Chainage
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
1 284+510
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
2 285+193
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
3 291+856 [Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
Design
Sl. No Width of carriageway and cross-sectional features
Chainage
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
4 308+834
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
5 309+233
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
6 315+326
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
7 318+272
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
8 323+160
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
9 329+027
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
10 332+860
(0.5x2) + Carriageway-8.5] =2 x 12.5m ( LHS & RHS)
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
11 336+399
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
12 339+635
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
13 342+274
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
14 343+728
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
15 346+210
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
16 349+240
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
17 365+705
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
18 372+935
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
19 375+295
(0.5x2) + Carriageway-8.5] =1 x 12.5m
[Railings-(0.5) + Footpath-(1.5) + Crash Barriers-(0.5x2) + Kerb Shyness-
20 375+381
(0.5x2) + Carriageway-8.5] =1 x 12.5m
7.1.5 The following structures shall be designed to carry utility services specified in table
below:
Existing Design Utility services to be
Sl. No Remarks0
km Chainage carried
Ducts shall be left over below the
OFC, telephone, water supply
1 289.950 289+951 raised footpath/ inside crash
pipe line upto 150 mm
barrier/by clamps
7.1.6 Cross-section of the new culverts and bridges at deck level for the Project Highway shall
conform to the typical cross-sections given in section 7 of the Manual.
7.2 Culverts
7.2.1 Overall width of all culverts shall be equal to the roadway width of the approaches.
The existing culverts at the following locations shall be re-constructed as new culverts:
All existing culverts which are not to be reconstructed shall be widened to the roadway
width of the Project Highway as per the typical cross section given in section 7 of the
Manual. Repairs and strengthening of existing structures where required shall be
carried out.
Note: All existing culverts which are not to be reconstructed or widened shall be retained.
7.2.4 Additional new culverts shall be constructed as per particulars given in the table below:
a) New Culverts:
Span Arrangement
Design Number Of
Sl. No Type (No. of pipe x Dia of pipe)
Chainage Culverts
(m)
1 280+300 3 Legged 1 x 1.20 1
2 281+994 4 Legged 1 x 1.20 2
3 283+720 4 Legged 1 x 1.20 2
4 284+270 3 Legged 1 x 1.20 1
5 285+980 4 Legged 1 x 1.20 2
6 286+620 4 Legged 1 x 1.20 2
7 288+000 3 Legged 1 x 1.20 1
8 290+960 3 Legged 1 x 1.20 1
9 292+140 4 Legged 1 x 1.20 2
10 293+200 3 Legged 1 x 1.20 1
11 296+493 3 Legged 1 x 1.20 1
12 301+480 3 Legged 1 x 1.20 1
13 301+660 4 Legged 1 x 1.20 2
14 302+300 3 Legged 1 x 1.20 1
15 303+900 3 Legged 1 x 1.20 1
16 311+080 3 Legged 1 x 1.20 1
17 312+300 3 Legged 1 x 1.20 1
18 314+500 4 Legged 1 x 1.20 2
Span Arrangement
Design Number Of
Sl. No Type (No. of pipe x Dia of pipe)
Chainage Culverts
(m)
19 316+540 3 Legged 1 x 1.20 1
20 320+200 3 Legged 1 x 1.20 1
21 323+350 3 Legged 1 x 1.20 1
22 324+050 4 Legged 1 x 1.20 2
23 324+475 4 Legged 1 x 1.20 2
24 324+840 4 Legged 1 x 1.20 2
25 325+400 4 Legged 1 x 1.20 2
26 326+350 3 Legged 1 x 1.20 1
27 328+470 3 Legged 1 x 1.20 1
28 329+000 3 Legged 1 x 1.20 1
29 329+450 3 Legged 1 x 1.20 1
30 330+170 3 Legged 1 x 1.20 1
31 330+690 3 Legged 1 x 1.20 1
32 333+200 3 Legged 1 x 1.20 1
33 334+385 4 Legged 1 x 1.20 2
34 338+505 4 Legged 1 x 1.20 2
35 339+140 4 Legged 1 x 1.20 2
36 339+690 4 Legged 1 x 1.20 2
37 342+090 4 Legged 1 x 1.20 2
38 344+708 4 Legged 1 x 1.20 2
39 347+630 4 Legged 1 x 1.20 2
40 350+674 4 Legged 1 x 1.20 2
41 351+625 4 Legged 1 x 1.20 2
42 351+970 4 Legged 1 x 1.20 2
43 352+770 4 Legged 1 x 1.20 2
44 354+710 4 Legged 1 x 1.20 2
45 355+220 4 Legged 1 x 1.20 2
46 356+000 4 Legged 1 x 1.20 2
47 357+940 4 Legged 1 x 1.20 2
48 361+300 3 Legged 1 x 1.20 1
49 361+740 3 Legged 1 x 1.20 1
50 361+910 3 Legged 1 x 1.20 1
51 362+540 3 Legged 1 x 1.20 1
52 364+120 3 Legged 1 x 1.20 1
53 365+020 3 Legged 1 x 1.20 1
54 369+330 3 Legged 1 x 1.20 1
Span Arrangement
Design Number Of
Sl. No Type (No. of pipe x Dia of pipe)
Chainage Culverts
(m)
55 371+507 4 Legged 1 x 1.20 2
Note :
a) The location of new culverts of Box/Pipe type with the span configuration specified
above is tentative and shall be finalized in consultation with IE/ authorities.
b) Any additional requirement of culverts found during the project implementation stage,
the same shall be deemed to be covered within in the scope of work.
c) All Repairs shall be carried out as per present site conditions. The repair works to be
carried out as per IRC standards and in consultation with Independent Engineer and
NHAI, the repair requirements to be assessed at the time of construction for actual
requirements.
Location at
Sl. No km Type of repair required
Nil
All Repairs shall be carried out as per present site conditions. The repair works to be
carried out as per IRC standards and in consultation with Independent Engineer and
NHAI, the repair requirements to be assessed at the time of construction for actual
requirements.
Note:
(a) Any additional requirement of culverts found during the project implementation stage,
the same shall be deemed to be covered within in the scope of work.
(b) The exact location of culverts shall be finalized as per site condition and location of
stream along the project alignment.
7.2.6 Floor protection works shall be as specified in the relevant IRC Codes and Specifications.
7.3 Bridges
Salient
Features Proposed
Design Existing Overall Width Of
Sl. Existing of span
Chainage Type of Length Structure
No existing arrangement
(km) Structure structure (m)
km (m) (m) (m)
RCC T Girder,
RCC Sub 10 x 13.5
1 311.900 311+868 Structure (RCC 7 x 20.0 140 2 x 12.5
and Open Girder)
Foundation
Salient
Features Proposed Total
Overall
Existing Design of span Width of
Sl. No Length
Chainage existing arrangement structure
structure (m)
km (m) (m) (m)
3 x 4.00
1 289.950 289+951 3 x 4.00 12 2 x 12.5
(RCC Slab)
2 x 5.00
2 295.615 295+556 2 x 5.00 10 2 x 12.5
(RCC Slab)
1 x 8.00
3 300.364 300+291 1 x 8.00 16 2 x 12.5
(RCC Slab)
2 x 9.00
4 304.297 304+181 2 x 9.00 18 2 x 12.5
(RCC Slab)
4 x 10.00
5 306.828 306+873 4 x 10.00 40 2 x 12.5
(RCC Slab)
2 x 4.00
6 307.790 307+837 2 x 4.00 8 2 x 12.5
(RCC Slab)
2 x 5.00
7 320.531 320+806 2 x 5.00 10 2 x 12.5
(RCC Slab)
5 x 4.00
8 326.954 327+258 5 x 4.00 20 2 x 12.5
(RCC Slab)
3 x 7.00
9 330.600 330+634 3 x 7.00 21 2 x 12.5
(RCC Slab)
2 x 8.00
10 359.542 366+084 2 x 8.00 16 2 x 12.5
(RCC Slab)
Existing
Existing Overall
Sl. Existing Design Span
Width Length Details of Widening
No km Chainage arrangem
(m) (m)
ent (m)
Shall be Widened to
1 305.248 305+136 9 3 x 5.5 16.5
12.5m
Shall be Widened to
2 312.170 312+138 8.5 4 x 8.5 34
12.5m
Shall be Widened to
3 328.430 329.027 8.25 2 x 5.5 11
12.5m
Shall be Widened to
4 331.700 332+860 8.2 5 x 9.0 45
12.5m
Shall be Widened to
5 366.395 372+935 8 4 x 5.0 20
12.5m
Additional New bridges at the following locations on the Project Highway shall be
constructed. GADs for the new bridges are attached in the drawings folder.
Proposed Proposed
Existing Design span Overall Width of
Sl. No Structure
km Chainage Length (m) Structure (m)
type
(m)
PSC I Girder,
RCC Sub
1 356.790 363+341 structure and 24 x 26.00 624 1 x 12.5
Pile
Foundation
Additional New Minor Bridges Proposed on Service Roads & Slip Roads
Span
Sl. Existing Design Total Width of
Arrangement Remarks
No km Chainage structure (m)
(m)
1 307.790 307+837 2 x 4.00 9.0 (LHS) & 9.0(RHS) Service Road
Slip Road, RHS
Bellary
2 334+465 2 x 7.00 9.0 (LHS) Existing Bridge
Bypass
is retained
Bellary
3 339+288 1 x 8.00 9.0 (LHS) & 9.0(RHS) Slip Road
Bypass
Bellary
4 339+635 4 x 7.00 9.0 (LHS) & 9.0(RHS) Slip Road
Bypass
Bellary
5 345+185 1 x 8.00 9.0 (LHS) & 9.0(RHS) Slip Road
Bypass
Note: The proposed length is tentative and the same shall be finalized in consultation with IC, Any change in total length and span
arrangement shall be deemed to be covered within the scope of work.
7.3.3 The railings of existing bridges shall be replaced by crash barriers at the following
locations:
Minor Bridges
Existing Chainage
Sl. No Design Chainage Remarks
(Km)
1 305.248 305+136
2 308.856 308+834
3 309.365 309+233
4 312.170 312+138
5 317.990 318+272
6 328.430 329+027
7 331.700 332+860
8 366.395 372+935
9 Bellary Bypass 334+465 (RHS)
10 359.168 365+705
11 368.755 375+295
12 368.84 375+381
Not Applicable
7.4.1 Design, construction and detailing of ROB/RUB shall be as specified in section 7 of the
Manual.
Road over-bridges (road over rail) shall be provided at the following level crossings, as
per GAD drawings attached:
Road under-bridges (road under railway line) shall be provided at the following level
crossings, as per GAD drawings attached:
Location of Level
crossing Number and length of span
Sl. No
(chainage km) (m)
Nil
The grade separated structures shall be provided at the locations and of the type and
length specified in paragraphs 2.9 and 3 of this Annex-I.
The existing bridges and structures to be repaired/strengthened, and the nature and
extent of repairs /strengthening required are given below:
A. Bridges
Major Bridges:
Minor Bridges:
B. ROB / RUB
Nil
Note:
(a) A schedule for repair and rehabilitation of bridges to be prepared based on detailed
inspection and to get approved from independent Engineer before taking up this work
subjected to a minimum rehabilitation measures that are mentioned and any other
defects found as per site conditions. The concessionaire is bound to conduct any non
destructive test on bridges which are in distressed condition as instructed by
Independent engineer at no extra cost to NHAI.
(b) All the drainage spout pipes are to be connected suitably by a pipe and brought down
through the supports from superstructure and pier/abutment cap and leaving into the
rivers/streams/nallahs.
Sl. No Location
293+250
1
(VUP with viaduct spans)
2 289+395 ( ROB )
4 314+220 ( ROB )
5 334+385 ( Flyover )
6 339+080 ( Flyover )
7 344+708 ( ROB )
8.1 Traffic control devices and road safety works shall be provided in accordance with
section 9 of the Manual.
a) Traffic Signs: Traffic signs shall include road side, overhead signs, Kerb mounted signs
along the project highway. The locations for these provisions shall be finalised in
consultation with Independent Engineer.
b) Pavement Markings: Pavement Markings shall cover road marking for the entire
Project Highway. The locations for these provisions shall be finalised in consultation
with Independent Engineer.
c) LED Traffic Beacons: These shall be provided on the entire Project Highway near
pedestrian crossings, public gathering places (Educational Institutions, Hospitals,
Worshipping Places, etc.),cross roads, & median openings. The locations for these
provisions shall be finalised in consultation with Independent Engineer.
d) Crash Barrier: The New Jersey concrete crash barrier shall be provided at Built-up and
W Metal Beam Crash Barrier shall be provided at High Embankment &, Bridge
approaches and curve locations where radius is less than 450m. The locations for these
provisions shall be as per clause 9.7 and finalised in consultation with IE/IC in addition
to the table below.
iv. W Metal Beam Crash Barrier at Curve Locations (Curve Less Then 450m
radius)
Design Chainage
Sl. No Length In m Sides Length In m
From To
Design Chainage
Sl. No Length In m Sides Length In m
From To
e) Cats Eye / Road Studs: Road Studs shall be provided at Horizontal Curve below 700m,
median opening, intersections, Cross roads & Built-up areas (Excluding Toll Plaza
location) and shall confirm to the specifications mentioned in Schedule D.
8.2 Specifications of the reflective sheeting shall be as per Section 9 of IRC :SP 84-2014
9 ROADSIDE FURNITURE
9.1 Roadside furniture shall be provided in accordance with the provisions of Section 9 of
the Manual.
a) Overhead signs: Cantilever and Gantry sign Location and their sizes shall be finalized in
consultation with IE/IC.
The Minimum nos of 30 Cantilever sign & 32 nos Gantry sign shall be provided along
the project highway. The locations for these provisions shall be finalised in consultation
with Independent Engineer.
d) Pedestrian facilities:
Carriageway and
Between Main
Service road
2 297+126 297+526 400 Both 800 Bayiluvadigere
3 305+322 305+555 233 Both 466
Gadiganuru
4 305+980 306+082 102 Both 204
5 307+382 307+912 530 Both 1060 Bavanahalli
6 363+760 363+900 140 Both 280 Paramadevanahalli
Total Length of Railing in m 3210
II. Pedestrian guardrail: Provide pedestrian guardrail at each bus stop location.
e) Delineators: shall be provided as per IRC 79-1981 and requirements & specifications
as per schedule D.
10 COMPULSORY AFFORESTATION
The number of trees which are required to be planted by the Contractor as compensatory
afforestation shall be as per Forest Conservation Act. Twice the number of trees to be cut.
11 HAZARDOUS LOCATIONS
The safety barriers shall also be provided at the following hazardous locations:
Nil
Not Applicable
13 CHANGE OF SCOPE
14.1 Bear Passes: As per requirement of Wild life authorities of Daroji Bear Sanctuary, Bear
passes shall be provided in the form of Box Culvert as detailed in 7.2.2 & 7.2.4 of
Schedule-B.
14.2 Chain Link Mesh/Fencing : Chain link mesh of 3m height with angular iron frame work
of adequate stiffness fixed in Cement Concrete foundation at required intervals on both
sides at ROW edge as per requirement of wild life authority. The details of locations are
mentioned below:
SCHEDULE - C
(See Clause 2.1)
PROJECT FACILITIES
1 Project Facilities
The Contractor shall construct the Project Facilities in accordance with the provisions of
this Agreement. Such Project Facilities shall include:
Each of the Project Facilities shall be constructed in accordance with the Manual of
Specifications and Standards specified in IRC: SP: 84-2014, and also specified in Annex I of
Schedule C.
Annex - I
(Schedule-C)
Project Facilities
(a) Toll plaza;
Toll Plazas shall be provided at proposed design chainages 322+150 and 374+710 .Rigid
pavement shall be provided at all toll plaza location including tapers. The Toll plaza shall
be provided in accordance with section 10 of Manual.
Bus bays and bus shelters shall be provided in accordance with section 12 of Manual.
The bus bays and bus shelters are proposed at the following locations:
Sl. Design
Side Proposed Type Placed on Location
No Chainage
1 281+830 LHS Bus bay with Bus Shelter Slip Road Hospet Bypass
2 282+320 RHS Bus bay with Bus Shelter Slip Road Hospet Bypass
3 288+500 LHS Bus bay with Bus Shelter Main Carriageway Shankar Nagar Camp
4 288+700 RHS Bus bay with Bus Shelter Main Carriageway Shankar Nagar Camp
5 290+900 LHS Bus bay with Bus Shelter Main Carriageway Vaddarahalli Village
6 292+200 RHS Bus bay with Bus Shelter Main Carriageway Vaddarahalli Village
Papi Nayakanahalli
7 293+260 RHS Bus bay with Bus Shelter Service Road
Village
Papi Nayakanahalli
8 293+490 LHS Bus bay with Bus Shelter Service Road
Village
9 297+000 LHS Bus bay with Bus Shelter Main Carriageway Bylavadagere Village
10 297+700 RHS Bus bay with Bus Shelter Main Carriageway Bylavadagere Village
11 301+300 LHS Bus bay with Bus Shelter Main Carriageway Darmasagara Village
12 302+400 RHS Bus bay with Bus Shelter Main Carriageway Darmasagara Village
13 305+470 LHS Bus bay with Bus Shelter Service Road Gadiganuru Village
14 305+825 RHS Bus bay with Bus Shelter Service Road Gadiganuru Village
15 307+490 LHS Bus bay with Bus Shelter Service Road Bavanahalli Village
16 307+490 RHS Bus bay with Bus Shelter Service Road Bavanahalli Village
Torangallu Bypass
17 311+550 LHS Bus bay with Bus Shelter Main Carriageway
starting
Torangallu Bypass
18 311+600 RHS Bus bay with Bus Shelter Main Carriageway
starting
Torangallu Bypass
19 316+650 LHS Bus bay with Bus Shelter Main Carriageway
Ending
Torangallu Bypass
20 316+700 RHS Bus bay with Bus Shelter Main Carriageway
Ending
21 320+000 LHS Bus bay with Bus Shelter Main Carriageway Near KTPS
22 320+400 RHS Bus bay with Bus Shelter Main Carriageway Near KTPS
Kuditini Bypass
23 322+900 RHS Bus bay with Bus Shelter Main Carriageway
Starting
Kuditini Bypass
24 323+000 LHS Bus bay with Bus Shelter Main Carriageway
Starting
Kuditini Bypass
25 326+100 LHS Bus bay with Bus Shelter Main Carriageway
Ending
Kuditini Bypass
26 326+600 RHS Bus bay with Bus Shelter Main Carriageway
Ending
27 338+900 Both Bus bay with Bus Shelter Main Carriageway Bellary Bypass
28 341+950 Both Bus bay with Bus Shelter Main Carriageway Bellary Bypass
29 344+100 LHS Bus bay with Bus Shelter Main Carriageway Bellary Bypass
30 344+150 RHS Bus bay with Bus Shelter Main Carriageway Bellary Bypass
31 345+350 Both Bus bay with Bus Shelter Slip Road Bellary Bypass
32 351+000 Both Bus bay with Bus Shelter Slip Road Bellary Bypass
Sl. Design
Side Proposed Type Placed on Location
No Chainage
33 354+800 Both Bus bay with Bus Shelter Slip Road Bellary Bypass
34 361+500 Both Bus bay with Bus Shelter Main Carriageway Bellary Bypass Ending
Service Road with
35 363+700 Both Bus Shelter Paramadevanahalli
VUP
36 369+200 LHS Bus bay with Bus Shelter Main Carriageway Joladarasi
37 369+400 RHS Bus bay with Bus Shelter Main Carriageway Joladarasi
(h) Others:
Other project facilities listed below shall be provided in accordance with relevant
section 12 of the Manual.
1. Lighting Facility;
2. Cattle Crossing
3. Highway Patrol
5. Cranes.
6. Communication system
9. Rainwater Harvesting
As per Ministry of Environment and Forests Notification, New Delhi dated
14.01.1997 (as amended on 13.01.1998, 05.01.1999 & 6.11.2000), the
construction of Rain water, harvesting structure is mandatory in and around
Water Crisis area, notified by the Central Ground Water Board. No of location at
each side LHS 47 nos and RHS 47 nos shall be provided in staggered manner of
entire project stretch.
Note: In case of any discrepancy in number or location of any of the project facilities mentioned
in this Annex-I, the independent Engineer shall finalize the number/location of these facilities as
per site requirement.
SCHEDULE - D
(See Clause 2.1)
1 Construction
The Contractor shall comply with the Specifications and Standards set forth in Annex-I
of this Schedule-D for construction of the Project Highway.
2 Design Standards
The Project Highway including Project Facilities shall conform to design requirements
set out in the following documents:
Manual of Specifications and Standards for Four Laning of Highways (IRC: SP: 84-2014),
referred to herein as the Manual
Annex - I
(Schedule-D)
All Materials, works and construction operations shall conform to the Manual of
Specifications and Standards for Four-Laning of Highways (IRC:SP:84-2014),
Engineering measures to ensure road safety (Morth letter no RW/NH-35072/04/2004
S&R (R ) dated 27th April 2010) and MORTH Specifications for Road and Bridge Works.
Where the specification for a work is not given, Good Industry Practice shall be adopted
to the satisfaction of the Authoritys Engineer.
2.1 The terms Concessionaire, Independent Engineer and Concession Agreement used
in the Manual shall be deemed to be substituted by the terms Contractor, Authoritys
Engineer and Agreement respectively.
2.2 Notwithstanding anything to the contrary contained in Paragraph 1 above, the following
Specifications and Standards shall apply to the Project Highway, and for purposes of this
Agreement, the aforesaid Specifications and Standards shall be deemed to be amended
to the extent set forth below: