Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 29-Jun-2017 Thursday No. of Day Report No. DPR- 659

Proj Start Date 2014 Contract Period 1 Year Calendar Day AM PM Fine
Weather
Estimate Completion Date 14-Nov-2017 Remain Period 139 Calendar Day 6~8 8~10 10 ~12 12~2 2~4 4~6 Rain
Work Force
Office
Trades PM PE SSE Site Engr QA/QC QS Admin Safety Security Site Store Driver Surveyer Geotech Workers Mason Carpenter Smith Welder
Staff
Today 1 3 1 1 3 2 1 2 19 13 36 41 9
Steel Roofing D&W Ceiling Water
Trades Scaffolder Painter Aluminium Total
Erector worker Installer worker Proofing
Today 5 3 136

Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
Excavator 60 Ton Crane Car Crane
Dozer 50 Ton Crane 13 tons Back Hole
1.5 Ton Roller 25 Ton Crane Rummer 1
Boom Lift Generator Truck
Material Delivery On Site
Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total
Sand (river) suds 3.15 12mm DF Bar (12m) nos 1496
Shingle suds 1.13 10mm DF Bar (12m) nos 675
32mm DF Bar (12m) nos 104 18mm Plywood shts 94

FO-OP-01 REV-00 Page: 1/3


Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 29-Jun-2017 Thursday No. of Day Report No.
Test Item Remarks
Sampl
e
LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT Conducted
HSE
0 0 0 0 0 By Safety Officer

Works Carried out Details


Trades Of Work Location Remark
I Block(A) F&B Building
1 Plastering Work For Brick Wall & Door (Design Change) In Progress
2 Kalzip Wall Clading Installation In Progress
II Block(B) Aquarium Building
1 Formwork installation & Rebar Fixing work For 2nd Floor Beam. (GL:B9 to B13') In Progress
2 Rebar FIxing For Main Fish Tank (7.1c) In Progress
3 Rebar Fixing For Exhibit 1.2 & 1.3 In Progress
4 Formwork installation For Main Fish Tank In Progress
5 Water Proofing Work at Fire Tank In Progress

III External Work


1 Casting Concrete For Footing of Stair at Retaining Wall Finish
III Other Work
1 Cleaning Work Around the Site
2 Laying the Broken Brick at Dolphin Entrance Way

Visitors Site
Purpose
on Site Instruction
Project Manager Project Engineer Prepare By: Site Engineer
Name Name Sai Thing Nun Name Lin Naing Soe

Signature Signature Signature

FO-OP-01 REV-00 Page: 2/3


Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 29-Jun-2017 Thursday No. of Day Report No.

Plastering Work for Brick Wall (Block-A 1st Floor) Kalzip Wall Clading installation Formwork installation & Rebar Fixing Work at 2nd Floor (GL :B-9 to B13'

Rebar Fixing Work at Exhibit 1.2 Laying the Broken Brick at Dolphin Entrance Way Formwork installation For Main Fish Tank

FO-OP-01 REV-00 Page: 3/3