Project Name: Myanmar Aquarium Project: 1 Year 139
Project Name: Myanmar Aquarium Project: 1 Year 139
Project Code: 4YG - 04700 Report Date : 29-Jun-2017 Thursday No. of Day Report No. DPR- 659
Proj Start Date 2014 Contract Period 1 Year Calendar Day AM PM Fine
Weather
Estimate Completion Date 14-Nov-2017 Remain Period 139 Calendar Day 6~8 8~10 10 ~12 12~2 2~4 4~6 Rain
Work Force
Office
Trades PM PE SSE Site Engr QA/QC QS Admin Safety Security Site Store Driver Surveyer Geotech Workers Mason Carpenter Smith Welder
Staff
Today 1 3 1 1 3 2 1 2 19 13 36 41 9
Steel Roofing D&W Ceiling Water
Trades Scaffolder Painter Aluminium Total
Erector worker Installer worker Proofing
Today 5 3 136
Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
Excavator 60 Ton Crane Car Crane
Dozer 50 Ton Crane 13 tons Back Hole
1.5 Ton Roller 25 Ton Crane Rummer 1
Boom Lift Generator Truck
Material Delivery On Site
Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total
Sand (river) suds 3.15 12mm DF Bar (12m) nos 1496
Shingle suds 1.13 10mm DF Bar (12m) nos 675
32mm DF Bar (12m) nos 104 18mm Plywood shts 94
Project Code: 4YG - 04700 Report Date : 29-Jun-2017 Thursday No. of Day Report No.
Test Item Remarks
Sampl
e
LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT Conducted
HSE
0 0 0 0 0 By Safety Officer
Visitors Site
Purpose
on Site Instruction
Project Manager Project Engineer Prepare By: Site Engineer
Name Name Sai Thing Nun Name Lin Naing Soe
Project Code: 4YG - 04700 Report Date : 29-Jun-2017 Thursday No. of Day Report No.
Plastering Work for Brick Wall (Block-A 1st Floor) Kalzip Wall Clading installation Formwork installation & Rebar Fixing Work at 2nd Floor (GL :B-9 to B13'
Rebar Fixing Work at Exhibit 1.2 Laying the Broken Brick at Dolphin Entrance Way Formwork installation For Main Fish Tank