Professional Documents
Culture Documents
Laporan Keuangan Bulan Maret 2017 " Indonesia Design Center "
Laporan Keuangan Bulan Maret 2017 " Indonesia Design Center "
PEMASUKAN STRUKTUR
KANTOR ALL
ANGAN BULAN MARET 2017
ESIA DESIGN CENTER "
MASUKAN ARSITEKTUR
STATUS
SISA KANTOR
TRANSFER
L JAKARTA
L JAKARTA
L JAKARTA
L JAKARTA
(1,500,000.00) JAKARTA
1,200,000.00 L JAKARTA
L JAKARTA
3,000,000.00 L JAKARTA
L JAKARTA
L JAKARTA
3,000,000.00 L JAKARTA
4,300,000.00 L JAKARTA
4,300,000.00 L JAKARTA
DAFTAR JAKARTA
L JAKARTA
3,360,000.00 L JAKARTA
JAKARTA
2,000,000.00 L JAKARTA
3,000,000.00 L
24,160,000.00
(1,500,000.00)
STATUS
SISA KANTOR
TRANSFER
L GADING
3,700,000.00 L GADING
1,750,000.00 L GADING
DAFTAR GADING
DAFTAR GADING
DAFTAR GADING
DAFTAR GADING
DAFTAR GADING
L GADING
L GADING
L GADING
L GADING
L GADING
5,450,000.00
-
STATUS
SISA KANTOR
TRANSFER
BEKASI
L BEKASI
L BEKASI
L BEKASI
L BEKASI
L BEKASI
L BEKASI
(2,000,000.00) BEKASI
(4,450,000.00) BEKASI
L BEKASI
(1,500,000.00) BEKASI
-
(7,950,000.00)
STATUS
SISA KANTOR
TRANSFER
L BANDUNG
L BANDUNG
BANDUNG
-
-
STATUS
SISA KANTOR
TRANSFER
L PASMING
L
L
L
L
4,700,000.00 L
DAFTAR
4,700,000.00
-
EMASUKAN STRUKTUR