Number : DIP-DO-01-006
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 27-04-2014
PORT STOCKPILE AND BARGING Revision : 00
MANAGEMENT PROCEDURE Page : Page 3 of 8
1. OBJECTIVE
Port Stockpile and Barging Management Procedure is established to:
1.1. Achieve targeted productivity/efficiency and EBITDA/Operating Profit.
1.2. To plan, organize, perform/accomplish, control the Ore at Port Stockpile and barging activity
are managed to fulfil customer requirement and comply with HSE standard.
2. SCOPE OF WORK
The scope of work of this procedure is limited to the following activities:
2.1. Ore Stockpile at Port
2.2. Ore hauling to barge
2.3. Ore barging
3. DEFINITION
3.1. Production Planning and Control (PPC) A person/group of persons who responsible to
create production/operation planning and control to achieve short term and long term
operation/production efficiency and productivity and to reach target of operating profit and
EBITDA.
3.2. Operation Control A person/group who able to do internal coordination regarding
achievement of actual versus plan.
3.3. Administration/Marketing Planning and Control (MPC) A person/group of persons under the
Director of Administration who responsible for marketing planning and control to optimize
company productivity to serve customer requirement.
3.4. Barge means barge with capacity 8000 Ton.
3.5. Draft means marine draft survey carried out on receiving barge by marine surveyor who is
licensed by goverment body of Republic Indonesia to carry out draft survey in Indonesia.
3.6. Shipping schedule means schedule covering a month during the period of containing detail
receiving barge including in particular the following details: dead weight, type, capacity,
available space.
3.7. Stevedoring contract means contract between PT DIP and respect of stevedoring service.
4. RESPONSIBILITY
Number : DIP-DO-01-006
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 27-04-2014
PORT STOCKPILE AND BARGING Revision : 00
MANAGEMENT PROCEDURE Page : Page 4 of 8
Make recommendations
Send Monthly Mine Plan based on actual field
to Mine Ops for condition (especially road
Recomendations condition, hauling
request, dumping area)
Make final
recommendations based Make recommendations
on port capacity, hauling based Ore spec required
and dumping unit, and (sales requirement)
road
Is the Working
No
Plan OK?
yes yes
yes Ore hauling
Working Plan-
approved
Ore Hauling Ore Hauling
Working Plan- Working Plan- yes
approved approved
Daily Sampling
Ore hauling
Working Order- Check Daily WO yes Release Daily
Daily Working Order
Command to
start Ore
Supervise Ore hauling
hauling
Supervise Ore
Ore Hauling
hauling process
Process
Crosscheck
Ore Loading Release
form
Crosscheck form
Sign Crosscheck
form
Dumping at port/
barge
Weighing at port
departure
Sign Crosscheck
form
Survey Report
(every 3 or 2
days)
No Agreed?
yes
No
Final Report/Berita
Acara (before date
10 monthly)-attach
WO dan Survey
Report
No Agreed?
yes
yes
Ore Hauling
Invoice-
approved
Number : DIP-DO-01-006
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 27-04-2014
PORT STOCKPILE AND BARGING Revision : 00
MANAGEMENT PROCEDURE Page : Page 5 of 8
6.2. Process
6.2.1. Plan
Plan Owner Indicator
Assure that Monthly Production
Production Planning
Plan is ready and correct
Assure that Amount of Stock at
Port stockpile is sufficient for Port Manager
barging
Assure quantity and quality of ore
Port Manager
demanded by customer
Assure that Barge is available on
Port Manager
time as planned
Assure that Loading equipment is
Port Manager
sufficient for barging activity
Assure that Man power is
Port Manager
sufficient for barging activity
Assure that Slot Time is available
Port Manager
as planned
Assure that Berthing facility for
Port Manager
barging is available
6.2.2. Do
No Do Owner Indicator
1 Produce barging activity working plan Port Manager Accurate, quantity,
quality, time
2 Send Monthly Barging Plan to PPC Manager Port Manager
Accurate, timely
for production planning
3 Make recommendations based on actual port Port Manager
condition (especially sea port condition and Accurate, timely
contractor readiness)
6 Daily Sampling OPERATION CONTROL- Accurate,
Mine Surveyor PT DIP correspond to
(OMS) customer demand
7 Release Daily Working Order Production Planning Accurate to reach
targeted EBITDA
8 Check Daily WO Port Manager
9 Prepare unit for activity Stevedoring
CONTRACTOR
10 Inform barge slot and location Port Manager
Number : DIP-DO-01-006
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 27-04-2014
PORT STOCKPILE AND BARGING Revision : 00
MANAGEMENT PROCEDURE Page : Page 6 of 8
6.2.3. Check
Check Owner Indicator
Check if Daily Sampling is match Feedback quantity and quality to
Port Manager
with customer demand PPC
Check if barge slot and location
Port Manager Solve it
is available on time
Make sure that the total weight in
Feedback to PPC
accordance with plan
Is the Working Plan OK? PORT MANAGER (OL)
Sure ore barged correctly? PORT MANAGER (OL)
All processes are as planned? PORT MANAGER (OL)
Ore hauling to barge Invoice
OPERATION CONTROL (OC)
agreed?
6.2.4. Act
Number : DIP-DO-01-006
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 27-04-2014
PORT STOCKPILE AND BARGING Revision : 00
MANAGEMENT PROCEDURE Page : Page 7 of 8
6.3. Output
No Output Indicator Customer
1 Ore Hauling Plan-approved PORT MANAGER (OL)
OPERATION
Mine Operation & QC (OTQ)
MINE CONTRACTOR
2 Ore hauling daily WO Hauling CONTRACTOR
3 Crosscheck form Hauling CONTRACTOR
4 Crosscheck form-signed CHECKER-at port
PT DIP (OTP)
DT DRIVER (CONTRACTOR)
5 Original and Copy of Crosscheck Hauling CONTRACTOR
form-signed
6 Survey Report (every 3 or 2 days) Hauling CONTRACTOR
OPERATION CONTROL-
Mine Surveyor PT DIP (OMS)
7 Berita Acara and Ore Hauling PORT MANAGER (OL)
Report-draft OPERATION CONTROL (OC)
8 Approved Final Report/Berita Hauling CONTRACTOR
Acara (before date 10 monthly)-
attach WO dan Survey Report
9 Ore Hauling Invoice-draft OPERATION CONTROL (OC)
10 Ore hauling Working Plan- PORT MANAGER (OL)
approved
11 Ore Hauling Invoice-approved FINANCE (FM)
7. RELATED DOCUMENTS
7.1. Daily Ore Hauling to port report
7.2. Ore Hauling to port related MoM
8. REFERENCE
8.1. Company annual production target.