6700 Energy Recovery
Project Overview
City of Yakutat
2
System Overview
Diesel Power Plant
*Assumed arrangement from information
obtained from the internet
Four (4) machines with installed capacity
over 4MW
3
Savings Options
1. Retrofit Existing CAT3516B with 2. Replace with New More Efficient CHP
Turbo-generators (TGs) TriPak Machines + TGs
Recover waste energy from the exhaust and turn into Increase the number of steps in the load management to
power plus waste heat from the exhaust & engine improve part load performance with the latest engines
jackets for domestic hot water and HVAC. including turbo-generators on the exhaust plus heat
recovery.
4
Savings Options
1. Retrofit Existing CAT 3516B with Turbo- 2. Replace with New More Efficient CHP
generators (TGs) & heat recovery TriPak Machines + TGs
x2
5
Power Demand Overview
1,400 kW 20 0.23%
6
Results of Options
** Based on 9.9kWh per litre heating valve of diesel & 70% boiler efficiency at 5,000
hours
8
System Implementation Option 1
The retrofit would only be to the CAT3516B genset #2. While this operation is being done genset #3 & 4 (CAT3512B
& 3508B) would run with the old CAT 3516 acting as the back-up machine. Once the retrofit testing and
commissioning is complete operations shall then return to the previous sequence with genset #2 CAT3516B as the
priority engine.
End result
9
System Implementation Option 2
With this option the existing genset #1(old CAT3516) and genset #4 (CAT3508B) would be replaced with two (2) new
TG enhanced packages, which would provide N+1 capacity for the peak load (1,500kW) while running as the priority
units for operations > 7,500 hours per year. The lead will be alternated between the new gensets #1 & 4 to balance
the run hours. The existing gensets #2 & 3 would function only as standby units and operate < 1,260 hours shared
between these units. The old CAT3516 & CAT3508B units can be removed from the site.
10
System Implementation Option 2
System arrangement now close to 2(N+1) for 99.995% uptime
End result
TG Enhanced TriPak
litres 3,500 4,500 5,500 6,500 7,500 8,000 8,760
Hours Hours Hours Hours Hours Hours Hours
11
Option Review
12
Conclusions
Identify & Plan Create & Design Invest & Build Operate & Maintain
13
Reduce Carbon Footprint
enhance profitability
6 improved
through 8% fuelfuel
savings or
efficiency 5% increase in power
3 to 5 year payback