Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

.

(SGD.) R LEONE N. GEROCHI


Chairman

Republic of the Philippines


City of lloilo
OFFICE OF THE SANGGUNIANG PANLUNGSOD

EXCERPT FROM THE MINUTES OF THE 15TH REGULAR SESSION OF THE sTH
SANGGUNIANG PANLUNGSOD OF THE CITY OF ILOILO, PHILIPPINES, HELD AT
THE SESSION HALL, 6TH FLOOR NEW CITY HALL BUILDING, PLAZA LIBERTAD,
ILOILO CITY, ON TUESDAY, APRIL 18, 2017.

PRESENT:
HON. JEFFREY P. GANZON
Acting Presiding Officer

Hon. Joshua C. Alim Member


Hon. Lady Julie Grace L. Baronda Member
Hon. Ely A. Estante, Jr. Member
Hon. R Leone N. Gerochi, Asst. Floor Leader Member
Hon. Reyland V. Hervias, Uga ng mga Barangay President Ex Officio Member
Hon. Armand S. Parcon Member
Hon. Eduardo L. Penaredondo, Floor Leader Member
Hon. Liezl Joy Zulueta-Salazar Member
Hon. Jose Efrain G. Trenas Ill Member
Hon. Candice Magdalane A. Tupas, M.D. Member

ABSENT:

Hon. Jose S. Espinosa Ill (On Leave) Vice Mayor & Presiding Officer
Hon. Mandrie T. Malabor (On Leave) Member
Hon. Plaridel C. Nava II Member

. REGULATION ORDINANCE NO. 2017-057

1r~~o\'t
,~:

-1!~\\' \1'1 ~
AN ORDINANCE AMENDING THE LOADING AND UNLOADING
AREAS IN JARO DISTRICT, PARAGRAPH (A) E. LOPEZ STREET
(CITY BOUND) (i) IN REGULATION ORDINANCE NO. 2016-192

~ Sponsored by Hon. R Leone N. Gerochi, duly seconded by


Hon. Eduardo L. Penaredondo, Hon. Lady Julie Grace L.
Baronda and Hon. Ely A. Estante, Jr.

WHEREAS, the Sangguniang Panlungsod of lloilo City passed Regulation


Ordinance No. 2016-192 wherein the loading and unloading areas in Jaro Cathedral is
amended;

WHEREAS, the Jaro Liko NFA, Jaro CPU, Jaro Ungka and Jaro Mandurriao
PUJs come up with another proposed loading and unloading areas in Jaro Cathedral.

NOW, THEREFORE, be it ordained by the Sangguniang Panlungsod of the City


of lloilo, in session assembled, that:

Section 1. - The new loading and unloading areas in Jaro Cathedral, E. Lopez
Street (City Bound) will be read as follows:
..
Rea. Ord. No. 2017-057. Apr. 18. 2017 Page2

Jaro CPU and Jaro Ungka PUJ units

- After the Development Bank of the Philippines (DBP), E. Lopez


Street (City Bound) until the post before the second gate of Jaro
Cathedral.

Jaro Liko NFA PUJ units

- After the second gate of Jaro Cathedral to comer E. Lopez - M.


Jalandoni Streets (City Bound)

Jaro Mandurriao PUJ units

- Fifteen meters away from corner E. Lopez - M. Jalandoni Street

Section 2. - A copy of the sketch of the new loading and unloading areas in Jaro
Cathedral is herein attached as an integral part of this ordinance;

Section 4. - Let a copy of this ordinance be furnished to the Transportation


Management and Traffic Regulation Office (TMTRO) and federation presidents of the
transport groups, for information and guidance;

Section 5. - This ordinance shall take effect immediately after its publication in a
newspaper of general circulation in the City of lloilo.

ENACTED, April 18, 2017.

I hereby certify to the correctness of the above quoted dinance.

UTH H. ARRO 0 d,J'i-"tf


tary to the Sanggunianr'-

ATTESTED AND CERTIFIED


TO BE DULY ENACTED: APPROVED:

IA~
Y . NZON
re i ng Officer

You might also like