Project:

Circular Piles
Pile group no = DL = 26600 kN
LL= kN
Total Sevice Load = 26600 kN
(Column is assumed at X = 0mm, Y = 0mm)

Pile Size Pile Area Coordinate deviation Coordinate Actual Load on Pile Pile Stress
2
No Diameter Capacity(kN) (mm ) Remarks X Y X Y X Y X *Area Y*Area Xi Yi Ixx-i Iyy-i Pile (kN) Status Actual % Remaining%
1 1350 14300 1431388 1687.5 0 0 0 1687.5 0 2.42E+09 0 2111.24 0.00 1.63E+11 6.54E+12 10641.5 ok 74 -26
2 1350 14300 1431388 -3000 0 0 0 -3000 0 -4.3E+09 0 -2576.26 0.00 1.63E+11 9.66E+12 6082.0 ok 43 -57
3 1000 7850 785398 0 4250 0 0 0 4250 0 3.34E+09 423.74 4250.00 1.42E+13 1.90E+11 4938.3 ok 63 -37
4 1000 7850 785398 0 -4250 0 0 0 -4250 0 -3.3E+09 423.74 -4250.00 1.42E+13 1.90E+11 4938.3 ok 63 -37
5 0 0 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
6 0 0 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
7 0 0 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
8 0 0 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
9 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
10 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
11 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
12 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
13 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
14 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
15 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
16 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
17 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
18 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
19 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
20 0 0 0 423.74 0.00 0.00E+00 0.00E+00 0.0 ok
SUM 4433573 26600.1

Actual Centroid of pile group


Ecc X = -423.74 mm Ixx = 2.88E+13 mm4 Mxx = 0 kNmm
Ecc Y = 0 mm Iyy = 1.66E+13 mm4 Myy = 11271573.3 kNmm