NO Jenis Order: Laporan Kerja Team Drafter 12 Mei 2017

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

LAPORAN KERJA TEAM DRAFTER 12 M

NO JENIS ORDER
1 DRAWING ABD
2 DRAWING ABD
3 DRAWING ABD
4 DRAWING LLD
5 ADD INVENTORY
6 ADD INVENTORY
7 ADD INVENTORY
8 ADD INVENTORY
9 ADD INVENTORY
10 FALLOUT DATA
11 VALIDASI ABD
12 VALIDASI ABD
13 VALIDASI INVENTORY
14 VALIDASI INVENTORY
TOTAL
LAPORAN KERJA TEAM DRAFTER 12 MEI 2017

RESULT
NAMA PROJECT
PROJECT ODP
841607 ADITYA RAHMAN (KOMP SUNGAI SIPAI) 30424 - 4
BANK MEGA AMUNTAI - 1
MERY NAIBAHO (G) JL.GUBERNUR SUBARJO 35515 - 8
BJM391 - 17
KANTOR DPRD MARABAHAN - 1
1050290 HJ. SYARIFAH HASANAH (PASAR MARTAPURA) 32251 - 4
1268794 TOPAN SURI HIDAYAT (PT 3) 29999 - 3
858500 M RIFKI (JL BARITO HULU) 30000 - 4
MTP-FM DS A (Jl Jamrud) R06-9/2017 - 3
FALLOUT 1007 - 0
KOPEGTEL/CUI 2 -
BANGTELINDO 8 -
CLEANSING DP MSAN & RFS - 10
REVALIDATED INVENTORY AREA HO - 0
TOTAL 10 55
I 2017

RESULT
STATUS KETERANGAN
ODC KABEL (m)
- 842 DONE ABD TW 1
- 418 DONE ABD TW 4
- 2005 DONE ABD TW 4
- 3753 DONE LLD NODE B
- - DONE ABD TW 4
- - DONE ABD TW 4
- - DONE ABD TW 4
- - DONE ABD TW 4
- - DONE ABD TW 4
- - DONE KALIMANTAN PROVISIONING
- - DONE RIA WITEL 2
- - DONE RIA WITEL 8
- - DONE DP WITEL 10
- - DONE RIA HO
0 7018 - -