Professional Documents
Culture Documents
Switchgear Operation and Maintenance Fo : Library
Switchgear Operation and Maintenance Fo : Library
Switchgear Operation and Maintenance Fo : Library
S W I TLibrary Search
CHGEAROPERATIONANDM AINTENANCEFO
earthingswitchisclosed,thecircuitmustbeisolatedand
proveddeadbysuitabletestingequipment.
Additionallyalineearthingswitchisshownbelow.
IsolatorsforIsolation,CircuitSelectionandEarthing
Isolatorsaredesignedforawiderangeofoperating
voltagesuptothehighesttransmissionlinevoltages.Isolators
maybeoperatedmanuallybutinsomecases,particularlyhigh
voltageisolators,provisionismadeforremoteelectricor
pneumaticoperationfromacentralcontrolroom.
Interlockingdevicesarefrequentlyinstalledwhich
preventtheiroperationonload.Interlocksmaytaketheform
ofamechanicallockformanuallyoperatedisolatorsoran
electricallyoperatedtypeforpoweroperatedisolators.
Theirpurposeistopreventtheisolatorbeingclosedor
openeduntiltheassociatedcircuitbreakersupplyingthe
circuitisopen.
Isolatorsinstalledonlowvoltagecircuits(upto415Vsay)
19%Location190of988
https://read.amazon.com/ 1/1