SPECIFICATION
FOR
THE ELECTRICAL ENGINEERING SERVICES AT
FELLOWSHIP HOUSE, SPUR HILL, DOUGHCLOYNE, TOGHER, CORK
SECTION 1
1.1 INTRODUCTION
The entire electrical installation shall be carried out in steel conduit and
trunking throughout.
The electrical contractor shall note and allow for his design exclusions
listed in the electrical tender specifications.
1.2 WARRANTY
The routes and types of trunking, cable tray and conduit will be
the agreed with the engineer. All trunking and tray must be
installed as per the Electrical Specification and to current
guidelines. It shall be the responsibility of the Electrical
Contractor that all electrical containment is installed correctly.
1.5 DEFINITIONS
EMPLOYER
Fellowship House
Spur Hill
Doughloyne
Togher
Cork
ARCHITECT
Bertie Pope & Associates
2 Hodders Villes
West Village
Ballincollig
Co. Cork
STRUCTURAL ENGINEER
Ray Keane & Associates
2 Clogheen Business Park
Blarney Road
Cork
QUANTITY SURVEYOR
Richard Leonard & Associates
Galways Lodge
Douglas West
Douglas
Cork
Tests
Earthing
Conduits
SDB 1 SDB 4
Scope
Pressurisation Unit
Single Phase Power Supply
System High / Low pressure Fault indication
Booster Set
Control Interface
All fuse units shall be fitted with gauge rings and two
spare fuses shall be provided for each fuse size fitted.
The fuseboards and M.C.B. boards shall be properly
labelled showing the circuits and rooms severed in each
case.
Tests
Earthing
Flush mounted:
2 gang double pole 13A switched socket outlets c/w back
box, 3-pin child resistant shutter system, white plastic
high-grade thermoset material finish with inherent
antimicrobial property, for wall or Dado trunking.
Surface mounted:
2 gang double pole 13A switched socket outlets c/w back
box, 3-pin child resistant shutter system, high impact
resistant, metallic powder paint finish, scratch and
corrosion resistant.
Flush mounted:
20A double pole switches, c/w neon indicator, back box,
white plastic high-grade thermoset material finish with
inherent antimicrobial property.
Surface mounted:
20A double pole switches, c/w neon indicator, back box,
high impact resistant, metallic powder paint finish, scratch
and corrosion resistant.
Cooker outlets
A 45A Cooker outlet is to be provided the cooker in the
Staff Room It shall be suitably rated and switched with a
neon indicator and suitably located. To BS EN 60669-
1:2000, c/w neon indicator, back box, white plastic high-
grade thermoset material finish with inherent antimicrobial
property, marked cooker.
Data Points
RJ45 Cat 6A one module screened datacom outlet c/w
white plastic finish suitable for dado type trunking
mounting
Front-plate
1 gang twin, two-module datacom front plate c/w
mounting box
The lamps and fittings provided shall be suitable for the required
use, be of good quality, robust and easily maintained.
90 x (2 x 35W)
84 x (1 x 35w)
18 x (2 x 28W)
3 x (2 x 49W)
29 x (1 x 28W)
15 x (3 x 49W)
18 x (38W)
2 x (2 x 20W)
29 x (3W)
Detail Specification:
Battery Operation: Lithium CR2032 3V
Range: Overcast / dark conditions 5 to 8m
Direct Sunshine 2 to 3m
Dimensions: 100mm L x 50mm W x 9mm H
Programming Options:
Protected access to programmed settings;
Automatic read in and storage of the illumination level;
Light On/Off;
Minimum of 6 pre-loaded/default illumination levels
between 100 and 2,000 Lux;
Minimum of 5 pre-loaded/default switch-off times
between 1 and 15 minutes;
Programme reset facility;
Test mode twilightindependent control with
movement to allow the field of detection to be set
conveniently and quickly;
Option to change sensors from Automatic to semi-
automatic operation; and
System Commissioning
The Electrical Contractor shall allow for two sets of
commissioning of all control devices. This shall allow for
the Clients initial setup and then full re-commissioning if
found to be impractical.
System Supplier
All lighting control equipment shall be from a single
manufacturer and supplier. The system shall be supplied,
tested and commissioned by a representative approved
by the system supplier
Street/Area Lighting
Objective
Protocols
Warranty
Lifetime of applications
IT Scope of Works
Horizontal Cabling
Outlets
Pin Colour
1 White / Orange
2 Orange
3 White / Green
4 Blue
5 White / Blue
6 Green
7 White / Brown
8 Brown
Patch Panels
Cabinets
Labelling
Patchleads
Referenced Standards
EN 50310 Application of
equipotential bonding
and earthing in buildings
with information
technology equipment.
EN 50081 Electromagnetic
compatibility Generic
emission standard. Part 1:
Residential, commercial and
light industrial. Part 2:
Industrial environment.
Wiring
. General
Control Panel
Smoke Detectors
Heat Detectors
Corridor Detectors
Door Holders
Handover
C&E configuration
List of devices and zones
Maintenance contract
Log book
2.5.2.2 General
MAINS SUPPLY
The mains supply to the control panel, power packs and
digital communicator shall be via an unswitched fused
spur outlet. Which will be supplied under the Electrical
Contract.
(ii) WIRING
Wiring shall comprise of 6 core 7/0.3mm 60 volt
tinned copper standard conductors, PVC insulated,
having an overall white PVC sheath. 10 or more
detectors shall be supplied with 1 amp 12V power
unit and battery. The contractor shall allow for
running cables at high level in corridor space or on
low voltage trunking system. The contractor shall
also utilise steel conduit system which shall run
from the trunking to the individual devices to be
provided in the areas as indicated on the drawings.
Where cabling is run on the surface, this shall be
carried out in a neat and inconspicuous manner,
adequately fixed at 300 mm intervals, and installed
in steel trunking.
N.B. The amount for items (a), (b), and (c) above
must not form part of the tender value. They are to
be shown separately.
2.5.3.1 C.C.T.V.
2.5.3.5 WIRING
Tests
Earthing
Conduits
Scope
Pressurisation Unit
Single Phase Power Supply
System High / Low pressure Fault indication
Booster Set
Control Interface
All fuse units shall be fitted with gauge rings and two
spare fuses shall be provided for each fuse size fitted.
The fuseboards and M.C.B. boards shall be properly
labelled showing the circuits and rooms severed in each
case.
Tests
Earthing
Flush mounted:
2 gang double pole 13A switched socket outlets c/w back
box, 3-pin child resistant shutter system, white plastic
high-grade thermoset material finish with inherent
antimicrobial property, for wall or Dado trunking.
Surface mounted:
2 gang double pole 13A switched socket outlets c/w back
box, 3-pin child resistant shutter system, high impact
resistant, metallic powder paint finish, scratch and
corrosion resistant.
Flush mounted:
20A double pole switches, c/w neon indicator, back box,
white plastic high-grade thermoset material finish with
inherent antimicrobial property.
Surface mounted:
20A double pole switches, c/w neon indicator, back box,
high impact resistant, metallic powder paint finish, scratch
and corrosion resistant.
Cooker outlets
A 45A Cooker outlet is to be provided the cooker in the
Staff Room It shall be suitably rated and switched with a
neon indicator and suitably located. To BS EN 60669-
1:2000, c/w neon indicator, back box, white plastic high-
grade thermoset material finish with inherent antimicrobial
property, marked cooker.
Data Points
RJ45 Cat 6A one module screened datacom outlet c/w
white plastic finish suitable for dado type trunking
mounting
Front-plate
1 gang twin, two-module datacom front plate c/w
mounting box
Earthing
The bath / shower shall be earthed with a separate lead and all
extraneous metalwork in the bathroom including hot, cold, waste
pipes, shower hot and cold feed pipes and the outlet pipe of the
mixer valve, central heating pipes and radiators (using a
purpose made connector) shall be bonded to it by means of a
looped cable.
All metallic pipes in the linen (hot) press shall also be bonded
together. The kitchen sink shall be earthed with a 2.5 sq.mm
earth continuity conductor, connected to the earth terminal of the
most adjacent socket outlet, and all metallic hot, cold and waste
pipes shall be bonded thereto. Main bonding leads of 10 sq.mm
shall be connected to the metallic water service pipes and to the
central heating pipes in the hot press and to the gas service at
The main earth lead shall run from the earth electrode which
shall be galvanised earth rod not less that 16 mm in diameter,
1.4 m long, sunk vertically for its whole length outside the front
wall of the house. It shall be noted that the earth rod shall be
not less than 1.4 m long. The connection to the earth electrode
shall be made by means of a nonferrous clamp protected by an
approved water repellent tape and enclose d in a flush mounted
galvanized adaptable box measuring 100 mm X 100 mm X 50
mm minimum. The earth lead shall be protected by a 20 mm
Hydrodre tubing or equal to the approval of the Engineer
throughout its length. The tubing shall be securely fixed to the
box protecting the earth clamp by means of a fitting and locknut.
The top of the box shall finish flush with the finished ground
surface and the lid shall be securely fastened with screws. The
main earth shall not be installed in the tubing until the box has
been set in the concrete and the concrete hardened. Earth rods
of adjoining dwellings shall not be driven closer than 3 m to each
other.
Consumer Unit
The main neutral bar shall have two double screw clamps
cables shall be lugged so that both screws bear on the
conductor simultaneously. Each double screw clamps shall be
capable of terminating a standard 16 sq. mm cable and lug. The
neutral bars shall have a separate way available for each
outgoing circuit including possible future circuits, up to the
maximum capacity of the unit. Each neutral bar shall have a
minimum number of ways to accommodate the following
stranded copper cables and lugs; 2 no. 16 sq. mm and 10 no.
2.5 sq. mm.
2.5 sq. mm. The earth and neutral bars shall be at the top of the
board.
In the case of apartments the fuse unit shall have a 50A fuse,
gauge ring and be complete with fuse cap. In the case of
houses the fuse unit shall have a 63A fuse and be complete with
fuse cap.
Circuit Arrangement
Light Switches
Lampholders N/A
Introduction
Access
Sample Installations
Distribution Route
3.1 MATERIALS
3.1.1 All materials used in the Contract and all of the work done
shall be fully in accordance with the qualities and
tolerances and all other requirements of the relevant
Standards and Codes Practice.
3.2 PLANT
3.2.1 The Contractor shall provide for the delivery and erection
of the plant on site except where otherwise specified
together with all labour, tools, erection materials,
scaffolding and instruments and all other apparatus
necessary for the completion of the Contract.
3.3 STORAGE
3.3.1 All goods which are normally stored in the open shall be
adequately protected from the weather and from all other
damage. Materials which are not adequately protected
shall be removed from site on receipt of instruction from
the Consultants and replaced by new materials, all at the
Contractor's expense.
3.4.1 The contractor shall set out the whole of the work and be
3.7.1 General
3.7.5 Discrimination
2 Pink
4 Brown
6 Green
10 Red
16 Grey
20 Blue
25 Yellow
3.7.13 Conductors
3.7.15 Instruments
3.7.17 Busbars
3.7.20 Labelling
3.7.22 Commissioning
1. MCB No.
2. MCB rating
3. No. of points on circuit
4. Cable size
5. Location.
Green/Yellow (earth)
Brown Blue Black (4 core type)
with an additional Black core on 5
core types.
3.11 Conduit
3.13.1 General
20/50V Violet
40/50V White
110/130V Yellow
220/240V Blue
300/400V Red
500/750V Black
3.19.5 Lamps
RUN - Green
STOP - Red
TRIP - Amber
OTHER - White, blue
3.23.1 General
S <=16 S
16 <=S <=35 16
S > 35 S/2
Flameproof (EEx)d
Increased Safety (EEx)e
Intrinsic Safety (EEx)lb
3.26.2 Definitions
Zone 0 Area :
Zone 1 Area :
Gas 11 Gas/Vapour :
Flameproof (EEx)d
Increased Safety (EEx)e
Intrinsic Safety (EEx)ib
c) Temperature Class
Maximum Surface
Temperature
Temperature Class of Electrical Equipment
T1 450C
T2 300C
T3 200C
T4 125C
T5 100C
T6 85C
3.27.1 Generally
1- white/orange
2- orange
3 - white/green
4- blue
5 - white/blue
6- green
7 - white/brown
8 - brown
3.32 COMPLETION
to hand.
3.35 Painting
3.35.2 All plant items in boiler house, tank room etc., shall
be repainted as directed.
(i). Introduction
(ii). General Description of Systems
(iii). Design and Performance
(iv). Technical Data
(v). General Operation & Maintenance Notes,
including Operation of Controls
(vi). Procedure for Operating & Maintenance
(vii). Emergency Procedures
(viii). Fault Tracing
(ix) Maintenance Schedules andRecommended
Interval Periods
(x). Commissioning Reports
(xi). Spares
(xii). Test Certificates
(xiii). Manufacturers Literature and Schedule of
Equipment
(xiv). As Built Drawings
(i). Introduction:
Interval Periods:
(xi). Spares:
Section 1 BLOCK D
56 Co-ordination of services
Section 2 BLOCK B
56 Co-ordination of services
Section 3 BLOCK A
53 Co-ordination of services.
17 Co-ordination of services