Ref. No. CHN/POG.TripPing lC-4U O o Date:
EVENT ANALYSIS REPORT
ffiS:ChandrapurSuperThermalPowerStationUnitCapacity:500MW
1. *HO Code: Station Code: CSTPS U5 Time- Date- No. of days from last
T15 20L5-16 23:47 Hrs 2rlL2l20Ls sync. =- 4.L6

Last Overhaul (AOH) synchronisation Date 3110812013 843 Days 2.3L Years

2. Operating conditions at the time of Event '|-

Load MW Coal Cycles in seruice Oil Suppoft


380 B,C,D,E,F Nil

3. Nature of Event:
Unit tripped on Condenser Pressure very High as all running CCW Pumps tripped due to DC control supply failure
(Electrical Problem)
+. Name of First Up, Main Protections & protection on which GCB tripped:
Turbine tripped on "Condenser Pressure Very High", boiler hand tripped, Generator tripped on reverse power
orotection.
5 A) Obseruations :-
Unit was running with 380 MW load. All running CCW pumps tripped due to fatlure of DC supply & closure of
Butterfly valve of running CCW pumps. Condenser pressure increased & unit tripped on Condenser Pressure very
High.
r- -
5 B) Remedial Action/work done
Control supply for Unit-S CCW pumps was ready from last incidence, those cables restored & DC supply charged
from Unit-S ODA board & supply normalised.
6. Root Cause Analysis:-
DC supply
CCW DC control supply was extended temporarily from Unit-6 after same incidence on 17-11-2015, Unit-6
found open therefore unit-6 HT switchgear control supply & Unit-S DC supply failed
cable checked from both end and
causing closure of Butterfly valve of running CCW pumps. Condenser pressure increased & unit tripped on Condenser
Pressure very High.

Z Preventive action suggested (Shoft Term) :- Nil

E. preventive action suggested (Long Term) :-


loc *rr.u extention from unit-S to Unit-6 & vice versa for immediate restoration of DC supply in case of failure of
lnormal DC suoolv made available.

9. Similar event occurred last time: -


u# r-r- Time r --r- Datg: r-rr
Nil

Term/Shoft Term measures stated at Sr No 9:-


ShortTerm: ---
Long Term: ---

10. Boiler lighted uP Time - 01:17 Hrs Date- 2211212015

11. T-A Set SYnchronised Time - 05:15 Hrs Date- 221I2120L5

t2. Remark :- Nil

I
**M*,,
chierM&M)
CSTPS, Ofandrapur

1. Procurcment/Replacement Plan:
2. Operational Error:
3. Delay in Maintenance:
4. Delay in bringing back the Unit:
5. Training of Staff:
6. Whether remedial action is completed satisfactory & point is closed :