. FINAL TRIP TEST REPORT (MAIN-1, MAIN-2) . END TO END TEST REPORT (MAIN-1, MAIN-2) . 8825-8850 CKT A FINAL SETTING (MAIN-1 -P546) . MAIN-1 RELAY PRINTOUT (P546) . 8825-8850 CKT A FINAL SETTING (MAIN-2 -SEL411L) . MAIN-2 RELAY PRINTOUT (SEL411L) 8825-8850 CKT A FINAL TRIP TEST REPORT MAIN-1 AND MAIN-2 NY Vicowad NATIONAL GRID tonal ida ‘Wee a ‘Check List of Fina Trip Test SEL NG 0.02.08, ‘ot2 1.0 Equipment General Data and Information ‘Substation SEs BayiPanel pews gr 209 Equipment | Maines trem, ceew-agiey [Serial No [= 2.0 Check List of Final Trip Test item, Description Done | Remarks 1, [Perform Tipping of Power Transformer Contoling Breakers through test contact of Pressure Relive, Buchholz Relay, OLTC Protective relay, Oil & Winding temperature protection Z| Perform Tripping of Power Transformer Controling Breakers through each Electrical Protection by closing tripping contacts through secondary injection on the protection relays above the final setting, 3. | Perform Tripping of Shunt reactor Controling Breakers through test coniact of Pressure Relive, Buchholz Relay, OLTC Protective. relay, Oil & Winding temperature protection. [Perform Tripping of Shunt reactor Controling Breakers through leach Electrical Protection by closing tripping contact. '&, | Perform Tripping of Capacitor Bank Controling Breakers through leach Electrical Protection by closing tripping contacts. & [Perform Tripping & Inter-Tripping of Controling breakers of Feedere/Transmission lines through each protection installed by closing tripping contact through secondary ‘injection on the protection relays above the final setting ow 7. | Perform Tripping of Controling Breakers of Bus Bar Schemes ‘through tus Bar Differential Protection by closing tipping contact. ‘ofthe relay through secondary injection on the protection relays. | Perform Tripping & Inter ~Tripping for Breaker Failures schemes through secondary injection on the CBF relay with simulated inition from the soutoe contact on every protection relay. on 8. [Perform Tripping of Bus Coupler/Sectionalizer by closing tip Contacts of the relays installed through secondary injection on the protection relays. TO. [Ensure that every protection operated (during secondary injection trp test) intiates CBF scheme and check indication & “Aching Son ote HAAS \i casi NATIONAL GRID Aetional Grids. ue ‘GLnNe-5460-002-005 Chock List of Final Tip Tost ag Bot? 71. | Ensure that every protection tips through its desired trp cout independently by disabling the other trp crcut before secondary | oy injection, 72 [Ensure that every proteclion operated (during secondary injection tip test) intiates FR and check FR massage. 7B, |For OHL JUGC protection ensure that every protection operated (uring secondary injection trip test) intiates inter trip sending | oy. relay and check indication & alarms. 7a. | For OHL protections ensure thal fast tip protection start AIR and ‘delayed itp blacked A/R and check indication & alarms. on 75. | Ensure that both trip circuits are normalized at the end of the tip) yy test, csp TAC Contractor Name] exe. SaLew AL mes e Savas SR { ¢ cig Sten bate MAAS swavenas ae sana on eran s PTITELO aS RCT WL Ta nee AVLAO Le rs Fa 30 ‘ido tans | “PSE TES eNO IV act TT AVIS 9 $0 90 SL ee noe TAVLAO 9 5 S990 11 WL 10s aL sog_| WORST UVLO [358 "pies Reg AT THO ¥Z afi S068) | WOPOTHV'GLdO 1598 “ps maa uF FaWO eZ Pa S066 a0 Lit6| "PoE RA LISO ‘Peo VICE aii so6e9 | _meReTuVaLdO Tape | __PHES RC LISD PHOT aa 50669) us 16 “pag ASD PHO TZ ara 50680 “qua 6 os wear aL wa man [ne Peano ca Sure weg pms ‘pave Sod ‘orsa wom WHAT “ged Buon 0 ss dn Te arenes | scaRSS wom BOIEBUEDOOOrY7ON PEATE | SOY ODER we OSER EXD Vos88-VS788 — 999, waumsedeg somiog Buyuoyssyuog BLY. PSY iscrY re sete 10°21 28 HORE 61000896: NIS 6 samoundine (¢ aL SORES Boog LT LA PAL S068 HS MCL GL 310 REL $0609 “pas Tso Peo PY Jaa PAL S068 ‘Sogad Wa fea 3a PAL S068 aL $0669 aL $06 AL $0689 ARAL S068 aniisosao | woReT av aLd0 za98 ARAL $068 ‘ado tars ea BY 130 s 2 ior er 0 oz oz RAL $068 ado ere CuO RMR seme |S Param peer ePa omg pom CHIPTESNSaae OPW FeRaRSS DoH TUN DOSS Ty HORE i [HY WBE EXO Vosss-vs79s — 99 diay remy qwounedag so1ieg Bujuorsssunwio BLK MP SyiberY ep rsetA= 8825-8850 CKT A END TO END TEST REPORT MAIN-1 AND MAIN-2 \ fp tuaslluai NATIONAL GRID Haan Grd Me "GLNG 5460-002-009 ‘Chock List of End To End Test Poti 4.0. Equipment General Data and Information Substation Saiaae: BayiPanel_— | Geto, eee. Equipment [pew « esas et [Serial No__[E Akin Fagen Fekm ~ sensite 2.0 End to End Test for Over Head Line Feeders 24. Distance Protection Tem Description Done [Remarks The folowing actives should be completed before stat the end tocend test ‘8, Secondary injection for main relays (Distance, Directional Earth Fault, and Over-Current) », Final Settings Applied forthe main relays. . Function Tests for Relay and Control Pane's (for proper 1 ‘command and indications). 4, Function Tests in GIS (for proper operation ofthe breaker) €. Fault & Event Recorders commissioned and property interfaced, {. Proper Operation of Bus-bar Protection and Circuit Breaker Fall schemes g. Communication system tests. om Simulate all the commands (trip, Block, communication failure, ‘auto re-close...etc) that will be sent to the remote end from the ‘output contacts of your protection and control relays as per the scheme provided. or ‘Check functions and alarms of each communication channels Individually by "simulation nese furictions alas in ‘communication panel and check functions and alarms in remote 3, | end communication panel ‘Check segregation between functions and alarms and channels. ‘The communication channels with smallest prolonging tme value are used for distance communication scheme and another for inter-tipping send and receive. OTT ( permissive over reach transfer tip) 4, | a Simulate 21 fault and measure time of Z1 tip output contact and check output of cartier send signal is obtained or ‘etn ete: pA v yas Nationa Grids, NATIONAL GRID Tite Chock List of End To End Test (GLNC-5460-002-009 ote ‘hd check indication and alarm oufput contact 'b._Check the other zones operate without carer send signal os ‘Simulate carrier receive and check that the relay tip only uring 21 with its time and check tipping during extended zone with extended zone time plus recelving ‘communication time. ow Check if extended zone Faull without OR, Wp with Z time and CS to the remote end, Oe Check if all zones except extended zone the relay tripping results without release from the opposite line end (carrer receive), allowing the protection to function with the usual ‘grading characteristic independent of signal transmission. on ‘Check that the POT is for forward direction oi oe ‘g._ Check al indications and alarm output contacts. os > Check communeaton fail condton according to the relay logic scheme tipping wih basic scheme. oF PUTT ( permissive under reach transfer trio) a. Simulate Z1 fault and measure time of 21 trip output ‘contact and check output of cartier send signal CS Is ‘obtained and check indication and alarm output contacts, Ne 'b. Check that only Zt transmit CS and the other zones and extension zone operate without carrier send signal Check if extended zone fault with CR , tip with extended zone time plus receiving communication time and without Ne Blocking scheme ‘a. Check If the forward zones fauit without blocking signal Fecelves from remote end, aided trip wih aided trip time and no CS to remote end, Ne 'B. Check if the forward zones fault with blocking signal receives from remote end, tip with zones delay time according to final seting and no CS to remote end. Check ifthe reverse zone fault, tip with reverse zone ime nd CS to remotn end Ne © Check if communication channels fai the relay operates with basio scheme, Ne Week in feed function ‘a, echo only i. Check i C.8 off & cartier receive the Echo signal send immediately. li. Check if C.B. on & cartier receive the Echo signal send after time delay (according to setting). b. echo and trip i._Check if 6.8 off & carrier receive the Echo signal Np a a $ elyasll ai NATIONAL GRID ational id “ie: Check List of End To End Test CLNG-6460.002.098 tote ‘send immediately without local trp. li, Check if C.B. on & carrier receive local trp and Echo signal send after time delay (according to seting) Tf we have two paraliel lines, so we have two Telec, Devices ( 4 channel for each device ) We can say : Device one~D1__, Device two~ D2 For testing the CBF : D1 and D2 are Healthy ‘Step-1: CBF For Line-1 operates and send two command in the same time (DIT-1 through Dt ; ch2 & DTT-2 through D2 ; ch-2 ) (CB Trip) SStep-2: CBF For Line-2 operates and send two command in the same time (DITA through D2 ; ch-8 & DTT-2 through D1 ; ch-3 ) (CB Trip ) ‘Step-3: CBF For Line-1 operates and send only one command DIT or DTT-2 (No Trip} Step-4: CBF For Line-2 operates and send only one command DTT-1 or DTT-2 (No Trp) Fortesting the CBF : one device is Healthy and the other is Faulty Step-5: CBF For Line-t operates and send ( DTT-1 through 01 ; ch-4 & D2 is falled ) (Trip) ‘Step-6: CBF For Line-1 operates and send ( D1 is faled & DTT-2 through D2; ches )( Trip ) Step-7: CBF For Line-2 operates and send ( DTT-1 through D2 jch4 &D1 Is failed ) (Trip) ‘Step-8: CBF For Line-2 operates and send ( D2 Is falled & DTT-2 through Dt; ch-4 ) (Trip For each of the previous conditions, check Auto-redlossr Initiation ‘8. Check auto-recloser inition from fast tipping relay by ‘simulation of instantaneous protections. . Check auto-recioser ination from intersip receive relay ‘and Check in remote end fest instantaneous protections ‘operate wich send that intertip signal © Check auto-recloser blocking initiation ftom delay or backup protection tripping relay by simulation of delay or backup Protection 4d. Check auto-recloser blocking initiation from intertrip receive relay and check in remote end delay or back up ow ‘oars pes yb \ eal NATIONAL GRID Hetionl ids rite Tamer GLNG5060-002-008 Chock List of End To End Test Pan to “sore Protection operate which send that intertip signal For each of the previous condlllons, check that Carer Send 10.| and Received events are recorded at the Fauit or Event| o) Tecorder for signals inated from the remote end, 77. | Repeat the previous tests af remote end oe 42, Simulate “communication channel failed, and check the |. L ‘operation of the relay on basic scheme. 2.2 Directional Earth Fault Protection em Description | Done [Remarks Following acivty should be complatod botore start the end to end test ‘a, Secondary injection for main relays (Distance, Directional Earth Fault, and Over-Curent) », Final Settings Applied for the main relays. ‘©. Function Tests for Relay and Control Panels (for proper A command and indications), 4. Function Tests in GIS (for proper operation ofthe breaker) | €. Fault & Event Recorders commissioned and properly et interfaced, f. Proper Operation of Bus-bar Protection and Circuit Breaker Fail schemes ‘9. Communication equipment and communication channel is commissioned and in service ‘Simulate all the commands (tip, block, communication failure, 2, | aulore-close...tc) that willbe sentto the remote end fom the | ‘output contacts of your protection and control relays as perthe | ° scheme provided: ab ng pl atte: nS Ww ely ll, Jai NATIONAL GRID National Grid es LNG 6460.002.088 Check List of End To End Test Pap tomar ‘Sota ‘Check functions and alarms of each communication channels individually by simulation these functions alarms in ‘communication panel and check functions and alarms in remote end communication panel 3. _| Check segregation between functions and alarms and channels. ‘The communication channels with smallest prolonging time value are used for directional earth fault communication scheme and another for intertrigping send and receive. Directional blocking scheme a, Forward Fault: IL Simulate a forward fault and check there is no initiation of CS to remote end and no CR received. (Be sure the ‘communication channels are healthy) |i, Check tipping instantaneously at setting value (aided tip) Check inter-trip send and receive and which tipping relay intiate send relay. iv, Repeat the previous steps from remote end Check that Trip Signal should appear, Measure the operating time, use Trip signal from the configured binary output to stop the timer, compare the measured time with the |, 4 set value of Coordination time in the two ends. # b. Reverse Fault J. Simulate a reverse faut and check there fs a CS in focal end and GR in the remote end, ii, Check there is no tripping inthe remote end relay. li Check the tripping occurred at reverse delay setting time at local end, Iv. ‘Starting again and simulate a forward fault in the remote end, (and reverse in the local end). Check the 5 In the local end and CR in the remote end and no tipping appear inthe relay ofthe remote end. Repeat the previous steps from remote end Check that Trip ‘Signal should not appear. Directional comparison scherne ‘a, Check thatthe communication channels are healthy 5. |b. Forward Fault oe ‘On the remote end, simulate a forward fault and chack thatthe carrier send (on the remote end) is generated ‘Aen Sten Wate AS y Ye \ip dasllual NATIONAL GRID tonal id ‘ite Check List of End To End Tost "CLNG-6460.002-009 aps ar ‘ots ‘corre and very that he caries recoWved locally ‘This CR wil simulate a tp permission Signal reception (Permissive Signa). ‘Simultaneously Simulate an earth Faul in line direction, ‘Chock that Trip Signal should appear after set coordination time delay. Use the Trp Signal fom the configured binary output to siop the timer, compare the measured ime with the set value of Coordination time. ©. Reverse Fault On the remote end, simulate a reverse faut and check that NNO carrier is sent and that no cariris received locally. ‘Simulate an earth Faultin line direction and wait longer than the set value of Coordination time(Tesms), ‘Check that No Trip Signal should appear. ‘Check that assigned binary output Contact for carrier Send (CS) should operate. ow WEAK INFEED FUNCTION, ‘a, Echo only (Open the local Circuit Breaker and simulate a forward faut at the remote and check that a CR (Permissive Signal) is received correctly ‘Check locally that the DEFR sends (or Echo) a permissive ‘Signal and that itis received correctly atthe remote end, b. Echo and tip, Close Local Circuit Breaker and simulate a forward fault at the remote end. Verify that a CR is received locally (Permissive Signal), and apply residual voltage (DEF with Residual voltage level) with itle or no current Check that the relay wil cary out a "Weak in-feed" trip and Send a Permissive Signal, (CS) tothe remote end and allowing it to carry out a Carter aided trip aso, we ‘Check in the faut recorder level of fault voltage, faut curent, ‘lay stars, relay tips indication and time. Repeat all the previous tests atthe remote end ok ‘Simulate a communication falure condition and check tie ‘operation of the relays on the basic scheme, & ‘eng Sten Wet MAS \y asa NATIONAL GRID ue "“GLNG8460-002.099 Chock List of End To End Tet Sac 3.0 End To End Test for Under Ground Cable Feeders 341 Pilot Wire Cable Differential Protection Tem Description Done | Remane Ensure that Pot wire cores are matched between local sation and remote station by colors, Continuity, Loop resistance and Insulation resistance. ‘Adjust the pilot stabilizing resistors and final setting based on the actual measured pilot loop resistance. ‘Check pilot supervision indications properly fal or nl, "must be correct (plot open and plot cross will give plot open indication in supervision ‘Check pilot DC current is within the manufacturer recommended supervision current iit. (if you found current equal zero that means there is crossing in plot wie). ‘Check supervision voltage send and recsive for both substation Using the pot isolation terminal blocks, Simulate pilot falure conditions: Open circuit, shor circuit, cross wired and make sure thatthe supervision alarms are generated correctly Inject current on the over-current starter element or emulate ‘an over-current condition by energizing the start input of the line differential relay ‘Check the operating current (plot relay current and main plat Current) in local and remote substations by current Injection for pilot relay. Check the retay’s output voltage forthe injocted current, Increase the injected current unt the remote breaker trips {While recording the sent and received pilot voltage). ‘Check inter-rip scheme by Closing local CB then send inter= trip, remote CB will trip. During this, measure send voltage in local substation and measure receive voltage in remote ‘substation and repeat for remote substation 1, ‘Check operating time (loop time). te ye 8 Sanat pas \ ie , iD yas NATIONAL GRID National Grid se oe CL-NG-6460-002-099 Chock List of End To End Tost a 0 32 Fiber Optic Cabo Differential Protection iia Descipion Bane [Remar pairs Wal ior opie pats wre rached Dae Ea 1. | saton and remote station ad thatthe Opicel line Sytom | oy has been commisiond and is rane 2 | Shesk tbe opts suenson atone communcatniT | >, faorno us be core Hake sure ta he curenteaaigs ar maihing ea and remy. 3 | Inreate he current jection and check he operation and. | yy tipping o to rely i ocal ond remote senor [fra phawot) | Check alarns "aio send and ecae Tay™ 7 | ehesk supentionvllge Sond and erave bath 5 _| substations ob Check trip score by ang oc CB Then sender ¢._ |, romot GB nl ip. Deg ts, osure sone vane ‘local substation and measure receive voltage in remote = Subsaton and repeat fr fometssuseate Z| Sheek operating ne op Oe) = i NGICSD T&C Contractor | an | SATEHALDBIEY ERICA SAVARIMUTHO San J a a ere VAP ita SITE TEST REPORT « AL OSAIS CONTRACTING CO AyaSil Jail lag Ay) | Contractors N ‘aan Coren NY AA TTC ata vis) re END FOND TEST ses A CKT CONTRACT NO RET Nteaon sip Ras Deeks seen ce MIGOM PS46_GENERAL INFORMATION Baye sepyiog] [Bayne wan any oes rr ioc. Fa NNT ite STOR S.No as Fates Coe 7A Fae ge ‘eanv 87 Fey Ered 10 ear) = lagi nne ‘avo 7 Votage TaeROV NDC caer ace TeEEca7sg —] | Caran erase cH 850m Fiber CHY a 4 Massurements Local Rate =tab_Remee Rats 201 ‘Cinecton: (trom Reta tune | 0100 | 0 [eraran| on | 10 | =2] ov | vw | moe wa fo fof - [oe] e{[e|[- 2 Injoction :{ From Local) vcr | OF] OP oat or] a0) ear] or aoa Li mA ms ma a Stable Condition tet |S SS = a eee wet ff anes tf ear | a 4, Differential Pickup current: Tees _| oa [0 [oar _| oa | 85 |-aay |g [stag] aap are 100872017 TESTING ENGNEER KNG- Engineer spnaure:_[2—~ cxnors ‘Sionatur: A Namo _:Ezhian Savatimathy Name _: SALEH AL DIIBY = VA? iterate SITE TEST REPORT. lyaSil Jil llgl 46.) | Conteactor’s Name: AL OSAIS CONTRACTING CO "Name of sutton: Consason of NeW AU-Za D/H RV SanionvHS E END 10 END TEST 6580 A CKT inka 2 Infortip Test_Bemween 2 Romots Ends: 24: Zonet Injection : wee om TST [om [EE [en [wr [ome [os [SE oe sont} Yeo | no | mo | no | vor [Sep* CET vor | no | mo | mo. | Yo nee 22: Zone.2 ( Without CR Signal ) Injection: eet [wr [we Pewee | SE [ae we [aes | oa | SS om] teca| no | Yee} no | no | vee | B® vee | no | wo | ver} Se [ae 23 : Zone-2 ( With CR Signal ) Injection wren [onsen SE [om | SRF [ears] ot [ames [oa | SE] om [SS a ae tect] vee | to | wo | no | ves | Spee ea | to | no | no | vr | oman [se Dareson6n017 TESTING ENGNEER NG Engineer spate: Seeger Signatur: PX Nome _: Ez Savarmutho ‘Name _:SALEH AL DIBIBY SITE TEST REPORT yaSil ail fullogh .u1 | Contracior Nai of aaton Conlon Oe AV Zain OTE Suan FADS Page 06 eno To snp Test—masses0cKT Aso up. Na ‘AL OSAIS CONTRACTING CO “CONTRACT NO. 0070 Dye Rel feet 24 : Zone-3( Forward) Injection : ‘22K 3 38 ‘12 30939870 88 -RENOTE END eri [ors [a Poa | oe [ome [ome |S oe teat} to free] to | ie | te ve | so | wo | ree} este [ase 25 : Zone-4( Reverse) Injection : i [or [oes [oma [SE] om | EB [oem wr [ome Pome [SE [an [SS toa] wo | ver] wo | no | vee] Pers [7 | wo | ver | no | to |ves| Bop [a 26 : DEF Without CR ee [or [oo [oom] [am | WB Doce | wre [om [we [SE am Ee al a sn P| cts tea] wo | ves | no | no | vee | Mep* [RE | wo | Yee | wo | no | vou] Sept [abe 272 DEF Win GR: oers [crs [wont [some [8 | am | MEOW sere | wor [emma | coma | 22 | an | SSO = ae ca bate] 3 test} vee | mo] wo | wo. | vee! Ra" | BB! vee | no | no | no | Yr | ome He = cal care ions TESTING ENGNEER sonnel aoe senso ane _: Ein Soar are _:SAEHALOBBY SITETEST REPORT yaSil Jil ilagh Aéylll | Contractor's Name: AL OSAIS CONTRACTING CO "Rtn Cont of NeW AZ TT NT Se WBE [Panetar TEND TO END TEST-—S5:850 A CKT ‘CONTRACT NO. uH0E0 stakeabtom — Tap. Rel ow OWT 2.7: Inverse Time OC and EF Injection : wee [om [oom] SD om | MR Yaar [wr ome omen [ SE am | BE Sie 2 | toca] wo | ves | no | mo | ves | Sart [THE | no | ven | No | No | vou! Stone [ata | jection 34 : Zone-t Injection : see [om [TLS [am | MS [se [we Joon [oom SE [oe Mame | no | no [ee | Ho | vex | ene Lassmee| vor | no | mo | no | vou | SPcn 3.2 : Zone-2 { Without GR Signal ) Injection : Elfen [em | SL woe [oon [om [SE [om Mam | wo | no | no | ver | vee | Mg yer | mo | wo | vee} Bop 33 : Zone-2 | With CR Signal ) Injection + egct| wo | no | vor | no | vo wo | wo | mo | vo |e [oR aTETOu62017 TESTING ENGINEER NOs Engineer senate: Spano? Signature: Name _! hin Saver Name _: SALEH AL DIIBY A iets ‘SITE TEST REPORT yaSll Jil allgh 6.) | Contract’ Name: AL OSAIS CONTRACTING CO ‘Name of substan: Cotton of New Atal 27.8 EV Sbaon FS TEND TO END TEST 5925-899) A CKT ‘CONTRACT NO. OTR Nake atom Tsui. Ns 3.4 : Zone-S (Forward) Injection : eng | wo | no | no | von | vou | Bee No | vee | no 35 + Zone-4 (Reverse) Injection : er [ors [a Toon | GS [am] SRE [ocr | rt [ei No | no| no | vee | ves | Swe [mm | io | von | no (36 : DEF without oR : wo | ves | mo ‘37-1 DEF With CR? Papa) wo | no | vex | wo | voe| Sa [RE] ven | no | no ATE TODS2017 TESTING ENGNEER na or Sionature: ss Sionatr: Nama _: hia Savas Nowe _: SALEM AL DIIBY A wasie SITE TEST REPORT yaSl ail ilogl 5s) | Contractor's Name: AL OSAIS CONTRACTING CO Tan sunstaton” Coaioaion of New AVN Ti5 8 Rv Subeaon VRE [END TO END TEST —RR2SA8S0 A CKT. Egy Nos Inverse Time OC and EF Injection : | san is 0s ru 1273. HN Ss -FEMOTE END age] wo | vee | mo | no | vee | Bee* FEIT] wo | vex | no | no |e! Mee 4 Check of Communication Fall Alarm for Both End: (0K) 5 Check Of Non Sending and Receiving Signals With Protection Out: (0%) 5 No Tripping Verified by Making Channel fail during Stable Condition for both Channels (0%) DATE TOUGROTF TESTING ENGNEER Siatue:__ erase Namo: Ezhian Savarmutha yal Jail lag 6.1 SITE TST REPORT ‘Contracta’s Name AL OSAIS CONTRACTING CO |” of sastation: Copnroiin of New AP Zul D/A RV Subaloa = SRDS Pag Pott "END TO END TEST CABLE $5504 CKT “CONTRACT NO. TONDO [ MakesmaniL [eau Nos Dg Rl 60h 2 Intertip Test Between 2 Remote Ends: 24 Zone) ton sara [owe 2 [no Zone? (Wiout CR Sign seton = nS Le Se eee eee =k Ble [EE [owe Joes [eee | Paw oc i al be wo | wo | mo | ven | 28% | 487 |e, lwo |e | no | ves | Opert | Clone ( [aera TESTO ENGHEER ‘Signature: eee" ame Ezhlan Savarimathu nome SALEHAL DIBIBY yall Jail AD esa SITE TEST REPORT Aiba i4yill | Contractor's Name: AL OSAIS CONTRACTING CO | earn Con ot AI San SRS aor TEND TO PND TEST CABLE S451A CT “CONTRACT NO-: HOOOROSIOU [StakeSELAnn. [quip Now: Dog Rel: £9508 CH ‘SEL411L_GENERAL INFORMATION, a am] [ars a oe | ee = ao oa = a nae nee od So ee see | oem aera |e | se pa eee ee anes ee eter tet tera 2 |= 2 = See ae et eee ¢ [eee aE a some _oase™ mn aigerrerers ferences SITE TEST REPORT lyaSll Jil lagh lll | Contractors Name: AL OSAIS CONTRACTING CO 7 ac aban Canal of NW APZun ISD/S8 RV Sibson = SSIS Pag Sot j [END TO END TEST CABLE S8S0A CKT ‘CONTRACT NO. #0000800 Make SELAiiL [eau Na Dmg Reis vp eC 24 Zone Foreard) naton + ES SS [al [ewe co 25 zone Revse) ncten 8 “Tes "lS a 8 "8 | [parermnenor TESTING ENGNEER some: [pene Sona Name E2hian Savarimathy Name sae XL O16 VAP ie SITE TEST REPORT lye ilalag 4l1__|Comracter'sName: AL OSAIS CONTRACTING CO [EF Cons oN AT SUS Sit SSDS oar Ls TEND TO END TEST CABLE. 68508 CKT CONTRACT NO: HORE | vinkesSELAIL [ Equip. Now Dwe Rel: 2900 Cx FP ee [SE [ow [eas [one |S [oe toot vax |e {so fe [ren {one | AEH |e Jno no [ne | vee | opt 27 ts Ten 06 Hecton { * oe, fy Te toot | ne no |e |v [Be [ABO | wo | vee |e i Te toma | uo | ie |v {no | vee |25r™ |Ee Ivee [no |e [no | vos | Spt ( [parenisaor TESTING ENGNEER ‘tna ad Statue: ane _: Ean Savaciab Nene SALEHRLOIIBY SITE TEST REPORT lyaSl il logl pill | Contactors Name: AL OSAIS CONTRACTING CO ‘nc of usa! Conan oT New APZA 53/8 Sibson = SSIES Paps TEND TO END TEST= CABLE S59 KT ‘CONTRACT NO: SOMO Make SHLaiIL T Equip. oz Dwg Ret: @i600 cy 32: zane {Wie O8 ial} cton EP = BE [ows [PP [as [28 [oe | 23 : Zoned (Wh GR Signal ton ‘air fr Bam Fao no [vos | no | veo | Oat wo [no [mo | ve | O90 | Som 14: 20009 Ford) etn cifaa Spee 1 | 4 BATE NTOSRO TESTING ENGINEER (080-Engineer Sonatue:__ ys” ‘Signatur: ‘Name _ Eahlan Savers Nemo _SALEHAL DIGBY SITE TEST REPORT elyaSll Jil llgl Spill | Contractor's Name: AL OSAIS CONTRACTING CO “a afsabation: Cosine otNSW ALZAMAS2/1 1 Sobaaton = SOS Pap bot "END TO END TEST-= CABLE 85508 CKT ‘CONTRACT NO: (ORT | akesecan [ui we Refs YESOR Lie 15 Zone (Reve ein Namo _: E2hian Savarmuths [BBE RE Pe Tag RT Ea HPT el [Le So ie sear [eee | a TP Tae aa] "roam, amet | to. Wo | mo | ves | vos | Sock ate no | v6 Ne No ve ‘arse Fr fee [| [owes [oa me Pamet | io [io [vee | no [vee {2p 1S bee | | Ho | [parerimanar TESTING ENGHEER oF snaue__ Vn orate ame _SSALEH AL DIDIBY AD ase SITE TEST REPORT Lyall lagl Spill | Contractor's Name: AL OSAIS CONTRACTING CO ‘aio sbatatons Coaraon of NeW Al Za ATE RV Sibson” SHREDS t TEND TO END TEST = CABLE WS0A CKT ‘CONTRACT NO. 00ND [ist SSELAIIL. gig. Nos Due Ret: @8S0 7 Ue 2 mrs Tine OCF ecton Pag ToT Tr Bey oe Sea Je free [ne |e free ] ee | RR |e | rae fae [ne | vx | Bose | AB 4 heck Communion Fa Aa or Bt des oo 45 cowck than Senda andRecshig Sgn Wih Protection a om {© Notnping Vrty Maing Chana ing State Contin or bty Cann) ‘DATE 110672017 TESTING ENGINEER. (080: Engineer a ‘Sonate s Signature: Namo _:Ezhian Savarmuthy Name _SALENALDIBIBY 8825-8850 CKT A FINAL SETTING MAIN-1 (P546) eyo jai National eda PROTECTION ENGINEERING DEPARTMENT OFFICE OF THE PROTECTION ENGINEERING DIV. = CENTRAL FA rr, crarade atang 2, ya sw oi soy Povo O17 8099382 hot. goons jn gr easy 459 17 Date: 43-04-2017 ( 16 -07-1438H) oul restings, Pease tnd enciosed the rely setting sheets forthe above ced S/S 6825 KT 8508 for 132KV OHLEUGC FOR Mt relay toe "PAO", * Pease procte furthest apply the stings and update the records + The hereunder notes hal be taken nto your consiertion, 4) Protection TED Native fs sal be uploaded to IS after commissioning recy by your enenred Enger. FS eviews! By 2) Stings are in Secondary val “THC Emenee Mose Enea aemeaaed Eaten Souiensers Erle. SALEM Ai. 058504 w Nx annocruPROFECion ENCHEERNG BV. CENTRAL Ee, x “Roiurned Te PED-GOA} Fncocure: ao (Ge: Manage, Qassim & North Projects Divison ‘Setang Lesa via TPS PROG. I Check el in CAPE ———| o_o aT irate = ae SSS Sar tose pe Santee in eee 1 -oSeIAT eeu aT = a 2S. ae = ————————— ——— == — See ee = —— — ee Fi vm om Ee a pon yeoie Sr tw et I i : 8825-8850 CKT A FINAL SETTING RELAY PRINTOUT MAIN-1 (P546) rage: 1 Satins Fle Rapa Sotto ss Fle: FNAL et ede Nar: S551 MO7GIE Ped on 2060017 21:1803, 3B88 5 ESESEce Rene 28: eseseeee: abe Seti le Rap Sinton Saas Fe: FINAL et oe! Nair: PAS51NR7 HOO Pied on: 2067017 21:485 Pape Pree on: 12)062017 211804 Sn: os Su one stings Fl Rept Sto sos Fle NL eal Ranbr PESINRHO7EON Pied on: sn67017 23604 Hie i a * ppsenenny fy i 4 HE r Sete ipa gee toe i ag egey AA Ei Ge < i t i Hi cy He a | f t i F Sem te had Sed SES fee hr: Te 2 Sal not et hav Rte ae Rt SE: ial et fd Hens ys rage: Pao: 127057017 21:1804 Sitio ses er Lt eta me PAS 91NRHO7EON ‘) ra tulsa 3 paddled sili sae et. i eh bandll EHH eeligestune ANU cali TEEN EUS DUEL SEOUEERNOSA SOUIEIE SIERO LLL LL roe: Satins Fle Repet Fle: FNALast Ned Nae PS4GOLNR7MO7GOE Pred on: 12060017 21:1605, i: at be 5s 2 ro = tEar Set rea sess Go Ov ous et nae Bae aoe oo ¢ # ee | 258! BaRRY! | ¥ ii i i i Poe Seti Fle Rot Stoo sos Fe: FNAL et ol Naber: ASSN MO7GIE Pred on 12060017 21:1805, i oe ieceres comes estes pe eenae a ectes eee = seme |: Hee ee oon aoe ae Ba ee r ‘1201: Cot U Sts; 0s0ono0H00%0s0eR0OROROHOHENEOD eee see ane: fee fone: om gence cae cam: bee erected fetes eel | een oe | eee see sere 2 oe Le eared ee yo? foe acces coe eee Ep tb cette Sea | Seat eee coe | oot ea eee SA Page 3 Printed on 106037 214805, [E E : THTTTTTTTTT TTT sting le Report Sut anos Fle: Fi et ede Naive: Psssoun7MO760H ‘aay: ors wo: ed Aa ye erecse 1 Pet Rae noms ot ey non ty Pre: 10 Paton: 1206017 21:1806 oo" Paget Printed om 12067017 21:18:06 bel Nonber:PAcouNR7HO7GIN Fle: Ft Sioa aes ‘seins Fe Rapa sagggepee 228g 2eg2aesenmeanaess HED wove SEUAESEEEIUTEEEUSEEAEHEEETIEEED Hii sugegscestieheueseseuentanseaaa PLETE UAT aainnnaeeHLEAAETENNTTELLLLL Sdudl nannanseselennaanaecseentnened ut HL LiL eee ee 2 8 2 a é zg i Pages 16 al Naber: P6o4NRZAN760M : its sat jag eammmeem tei suse Hy Hi 1 Sisinnunantnnat il ay Halls Hale TL luseyscgsegtusazuseaneece Eas idbp ps Hii: era pall asain AARESASASSUSSUS SUSUESUS SUE DELEESUEEEE SEE TEU EES 5a 3 Jutta ty Ca ALLL TE ee ee age: 17 Prints on 1206047 211807 ede Nabe: PsagounzMo7soe stings le Report Sutton a5 Fle: Fi set ab tegees Ey ell iG Het lessassenenese ie Se HTL SUG asaaaacacaaseas® Leis Litt > $$ cae oo” ICOM aaa oor DESRTSRAT bas as aR =} — om ET) Utica wich Depa ‘ime 1 Ene ‘spree ee Ingen eee So orto oe mete TTT | AR net ae aReTE ( Ger) ro ( Teer] “Die seal aT * a ORT CRE ‘tm ‘Vodinatrordt Ca Doe fremesrseycckon four [race epee ma ocr V.N iz sc [rep anor aa Dee Color oor acoso, |ko " ono args Te a prise frugecce0 oer axmon or [psvia [Face eee v3 Fr emt Ag AO ARCA, vauenc rif LED Asn a DewstClor Ker OK 0, Ona, fro ‘lets zilan’AppData Ronny SEL/ACSELeraorlQuickSeVSesion_0/Temp.. 1/20 Page 360F 6 side Demos 10120 mwa 8 Lrowee aaa oman Tae TS Serve a Fens aa a0 ARE Prec ve Aneta ner car ae i ee sm Prpetana0 frome on ker svn craw ena ei ic Fens aa ARES fsseoc frm eo Aner a Oar Can aha eon a Jeo a oe faim frogess021 Presper fem FACTO eae c Fake 0G AO ARG supe frre ase aes car aren Oats det fo oe = rap fgets 22 freee x@onNor Frm SC [rei Err e cee A RETR patie [2 12D Aser4a Daweh Hee ananata, fo ee free onSOr fisvs safe barr cE cio RE RRON ausse |r 0 asec Pes Ce Ben anon, fo feo L120 Prapcteo2« LertagoANor svn eer Saar re ci ROARS cane tim Aso Dear or Bena adticta, feo i [reson a Oa = enor Sv — fst von oan fs oi [os as vag Pn Fame fart Fr iW |S sane es ST a FO Va [este oe oa Svs peas ee svn Fos ae =n Ali: serEhia App Duta RoemingSEL/AcSELentonQuickSeuSession_0OTemp.. 6113201 Page 160 61 |e ee OE a Es fra [ocr an aims oi 3 acetal ria vero Baa ies Aner rat [sem Ponsant las Pt [Derk Fone sik Aree sors seinen ats ois pics aes, [2 2#.0H.0F| fsteereifea Sf srs sem roisand Ati Pi ime, sen, 24,240 08 neta ee vse int als on? ions Ascetien [/- 20.05 87] eve ease oma simran atime, int [ces Ate GS-08 a rv iat ts Fos Taste Aneto, | 25% ON FF “lice rio sex oman ls oe 1 nie Avoettn FEIT, fst sex Ponts and aise Pot 11 [Aone Assen, PMLCL STLCL ON, tia [rc Poinsd Ate Poit inate, Amati, [LASTAON, [set roinsan lis, Po 3 [tone sere, [OLE TU ON, armas Pos rst Ans rin 1 Pantano, [PILE SEC ON eres |sem rian atime is rcamaox ‘lesbian AppData/RoamingSELiAcSELeratorQuekSelSesson O1/Tenp... 6/201)

You might also like