State Investment Promotion Board

List of MoU's
Updated on 30-09-2010
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
1 Jindal Organization 21.05.2001 1- Rail & Beam Mill 75000 TPA 1900.00 Raigarh Greenfield
New Delhi 2- C.P.P. 110 MW Projects
3- Steel Products 205000 TPA
4- Coal Washery 2500000 TPA
5- Aluminium Plant 50000 TPA
6- Ferro Chrome Plant 60000 TPA
7- DRI Plant 450000 TPA
8- Mini Blast Furnace 250000 TPA
9- Development of additional
coal mines
2 Monnet Group of 21.05.2001 1- Steel Products 300000 TPA 570.00 Raipur Greenfield
Companies, Mandir 2- C.P.P. 55 MW Projects
Hasoud, Raipur
3- Sponge Iron 300000 TPA
4- Structural Rolling Mill 300000 TPA
5- Ferro Alloys 50000 TPA
1- Steel Bar & Section making 150000 TPA 590.00 Raigarh Greenfield
2- Sponge Iron Plant 300000 TPA Projects
3- Steel Ingot Making Facility 150000 TPA
4- Coal Mining & Washery 110000 MT
5- Power Plant 70.5 MW
3 Bharat Aluminium 29.05.2002 1- Expansion of Aluminium 300000 TPA 6000.00 Korba Greenfield
Company Smelter Plant Projects
2- Power Plant 600 MW
4 Chmoku Agro & Spices 13.08.2002 1- Various Food Product (Food 50.00 Durg Greenfield
Ltd., Bangalore Park) Projects

5 Jindal Steel & Power 23.10.2002 1- Private Industrial State 11.00 Raigarh Greenfield
Ltd., Raigarh Raigarh Projects

6 M.S.P. Steel & Power 03.02.2003 1- Sponge Iron Plant 400000 MT 175.59 Raigarh Greenfield
Pvt. Ltd., Kolkata Projects
2- M.S. Ingot/Billets Plant 210000 MT
3- Power Plant 20 MW

MD\sipb2\mou\mou_progress(eng)\Alive Page 1 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
6 M.S.P. Steel & Power 03.02.2003
Signing 175.59 (Rs.
Investment Raigarh
Distt. Greenfield
Pvt. Ltd., Kolkata Crore) Projects

1 2 3 4 5 6 7 8
4- Coal Washery 72000 TPA
5- Captive Coal Mines 600000 TPA
7 Sunil Sponge Iron Ltd. 03.02.2003 1- Sponge Iron Plant 90000 TPA 105.11 Raipur Greenfield
Kolkata Projects
2- Steel Plant 100000 TPA
3- Power Plant 14 MW

8 Ind Agro Synergy Ltd. , 05.03.2003 1- Sponge Iron, Stell Billet 400000 TPA 413.00 Raigarh Greenfield
Nagpur Projects
2- Power Plant 8 MW
3- Coal Washery 1.26 MTPA

9 Anjani Steel (P) Ltd., 17.07.2003 1- Sponge Iron Plant 180000 TPA 185.00 Raigarh Greenfield
AIlahabad Projects
2- Captive Power Plant 10 MW
3- Steel Plant 150000 TPA
4- Coal Mines

10 Superior Sponge Iron 29.08.2003 1- Sponge Iron Plant 200000 TPA 330.00 Durg Greenfield
Pvt. Ltd. & Other Projects
2- Power Plant 24 MW
Associate Companies
3- Pig Iron Plant 150000 TPA
4- Steel Melting Shop 300000 TPA
5- Rolling Mill 225000 TPA
6- Coke Oven Unit 100000 TPA

11 Navbharat Group of 8.9.2003 1- Sponge Iron Project 500000 TPA 1460.00 Raipur And Greenfield
Companies Raipur Bastar Projects
2- Captive Power Plant 16 MW
3- Steel Plant
4- Coal Mining & Washery 5000000 TPA
5- Power Plant 200 MW
6- Integrated Sugar Plant 2500 TCD

12 Akshay Investment Pvt. 8.9.2003 1- Sponge Iron Plant 90000 TPA 115.00 Rajnadgaon Greenfield
Ltd., Raipur Projects.
2- Captive Power Plant 14 MW
3- Induction Furnance Unit 105000 TPA
4- Captive Coal Mines
5- Captive Iron Ore Mines

13 Shri Bajrang Power & 8.9.2003 1- Sponge Iron Plant 90000 TPA 130.00 Raipur Greenfield
Ispat Ltd. Raipur Projects
MD\sipb2\mou\mou_progress(eng)\Alive Page 2 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
13
1 Shri Bajrang2 Power & 8.9.2003
3 4 5 130.00
6 Raipur
7 Greenfield
8
Ispat Ltd. Raipur Projects
2- Power Plant 25 MW
3- Pig Iron Plant (Mini Blast 60000 MT
Furnace )

14 Godavari Power & Ispat 16.08.2004 1- Sponge Iron Plant 650000 TPA 493.00 Raipur Greenfield
Ltd., Raipur Projects
2- Steel Billets / Ingots 550000 TPA
3- Power Plant 50 MW
4- Ferro Alloys 33000 TPA
5- HB/GI/Barbed & other Wires 30000 TPA
6- Iron Ore & Coal Mines 3000000 TPA
15 Vandana Global Ltd., 16.08.2004 1- Sponge Iron 351000 MT 426.00 Raipur Greenfield
Raipur Projects
2- Power Plant 80 MW
3- Furnesh (Ingots/ Billets) 167520 MT
4- Crusher Plant 360000 MT
5- Ferro Alloys (Silico 48000 MT
Maganies)
16 S.K.S. Ispat Pvt. Ltd., 16.08.2004 1- Sponge Iron 270000 TPA 295.47 Raipur Greenfield
Mumbai Projects
2- Power Plant 25 MW
3- Steel Melting Shop 210000 TPA
4- Rolling Mill 210000 TPA

17 Jindal Steel & Power 07.01.2005 1- Plate Mill 1000000 TPA 2595.00 Raigarh Greenfield
Ltd., Raigarh Projects
2- Blast Furnance 1225000 TPA
3- Rolling Mill for Re-Bar, TMT 70000 TPA
and Wire Rce
4- Power Plant 99 MW
5- Steel Melting Shop 1225000 TPA
6- Sinter Plant 2500000 TPA
7- Cock Oven Plant 800000 TPA
8- Oxygen Plant 2 x 380 TPD
9- Lime & Dolomite Kiln 3 x 330 TPD
10- Railway Line from Captive -
Coal Mines to Plant Site

18 Chhattisgarh Electricity 07.01.2005 1- Sponge Iron Plant 120000 TPA 2010.00 Raipur Greenfield
Company Ltd., Raipur Projects
2- Power Plant 250 MW

MD\sipb2\mou\mou_progress(eng)\Alive Page 3 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
18 Chhattisgarh Electricity 07.01.2005 Crore)
2010.00 Raipur Greenfield
Company Ltd., Raipur Projects
1 2 3 4 5 6 7 8
3- Steel Plant 1000000 TPA
4- Cock Oven 400000 TPA
5- Pelletizing and Sintering 1800000 TPA
6- Coal Mining & Coal Washery -

19 Prakash Industries 07.01.2005 1- Cock based Sponge Iron 400000 TPA 1017.00 Janjgir Greenfield
Limited, Champa Plant (DRI Plant) Champa Projects
2- Captive power plant (Co- 25 MW
generation of power)
3- Captive power plant, coal 190 MW
based (fluidized bed boiler &
thermal boiler)
4- Steel Billets/Blooms/Ingots 900000 TPA
making facility (Steel melting
shop-II)
5.a- Development of captive coal 1000000 TPA
mines
5.b- Development of captive coal 1000000 TPA
mines for captive power
plant, together with coal
washery project
6- Development of Iron Ore 1000000 TPA
Mine in the state of
Chhattisgarh with crushing
plant in mines

7- Mini blast furnace for Pig Iron 250000 TPA

8- Sub-merge Arc Furnace 115000 TPA


(SAF) for producing Silico
Management & Ferro
Chrome

9- Structural Rolling Mill (2 unit 300000 TPA


- 1.5 LTPA each)
10- Wire Rod Mill (2 unit - 1.5 300000 TPA
LTPA each)
20 Chhattisgarh Steel & 07.01.2005 1- Power Generation (3 x 30 112.5 MW 464.88 Janjgir Greenfield
Power Ltd., Raipur MW Coal + 3 x 7.5 MW WHR Champa Projects
based)
2- Sponge Iron (3 x 350 TPD) 380000 TPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 4 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
21 Pushp Steel & Mining 07.01.2005 1- Sponge Iron Plant (350 TPD 315000 TPA 380.00 Durg Greenfield
Pvt. Ltd., Delhi x 3) Projects
2- Captive Power Plant (8 x 3) 24 MW
3- Low Pollution (Euro-IV & V)
compliant automotive parts
made out of captive
materials

22 Salasalar Sponge & 07.01.2005 1- Sponge Iron Plant 120000 TPA 287.51 Raigarh Greenfield
Power Limited, Raipur Projects
2- Coal Washery 576000 TPA
3- Power Plant 30 MW
4- Steel Plant 100000 TPA
5- Ferro Alloys 20000 TPA

23 Shree Radhe Industries 07.01.2005 1- Sponge Iron Plant 260000 TPA 232.50 Bilaspur Greenfield
Ltd., Bilaspur Projects
2- Captive Power Plant 34 MW
3- Steel Melting Shop 50000 TPA

24 Satyarth Steel & Power 07.01.2005 1- Coal based Sponge Iron 219999 TPA 175.00 Raipur Greenfield
Pvt. Ltd., Raipur Plant Projects
2- Captive Power Plant 131400 MW

3- Steel Plant (Induction 182500 Tonne


Furnace)
4- Re-Rolled Products 31400 TPA

25 API Ispat & Powertech 07.01.2005 1- Sponge Iron Plant (350 TPD 315000 TPA 158.00 Raipur Greenfield
(P) Ltd., New Delhi x 3) Projects
2- Power Plant 16 MW

3- Steel Ingots (12 MT x 2) 86400 TPA

26 Topworth Steels Pvt. 07.01.2005 1- Sponge Iron Plant 120000 TPA 129.00 Durg Greenfield
Ltd., Mumbai Projects
2- Power Plant 15 MW

3- Steel Melting Shop, Concast 100000 TPA


rolling mill
27 Crest Steel & Power 07.01.2005 1- Sponge Iron Plant 210000 TPA 116.50 Durg Greenfield
(P) Ltd., Bhilai Projects
2- Thermal Power Plant 16 MW

MD\sipb2\mou\mou_progress(eng)\Alive Page 5 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
27 Crest Steel & Power Signing
07.01.2005 Investment
116.50 (Rs. Distt.
Durg Greenfield
(P) Ltd., Bhilai Crore) Projects
1 2 3 4 5 6 7 8
3- Ferro Alloys 18 MVA

28 Tata Steels Ltd., 06.04.2005 1- Integreated Steel Plant with 5000000 TPA 10000.00 Bastar Greenfield
Mumbai 630 MW CPP Projects

29 Essar Steel 07.05.2005 1- Integreated Steel Plant with 3200000 TPA 7000.00 Dantewada Greenfield
Chhattisgarh Ltd., 100 MW CPP Projects
Hazira

30 Shri Bajrang Power & 06.10.2006 1- Coke Oven Battery 2.00 mTPA 1400.00 Raipur Brownfield
Ispat Ltd. Raipur Projects
2- Sinter Plant 2.27 LTPA
3- Blast Furnace with Pig 2.31 LTPA
Casting Machine
4- Steel Melting and 2.70 LTPA
Continuous Casting Shop
5- Sponge Iron (DRI) Plant 6.00 LTPA
6- Captive Power Plant 100 MW
7- Re Bar Mill 1.00 LTPA
8- Section Mill 1.00 LTPA
9- Oxygen Plant 0.60 mCMPA
10- Bauxite Calcinations Plant 3.00 LTPA
11- Coal Washery 5.00 mTPA
12- Pelletization Plant 1.00 mTPA
13- Ferro Alloys 36000 TPA
31 Ind Synergy Ltd. , 06.10.2006 1- Sponge Iron 4.00 LTPA 960.00 Raigarh Brownfield
Nagpur Projects
2- Captive Power Plant 132 MW
3- Coke Oven & Washery 210 MT/hr
4- Blast Furnace 450.00 Cu.Mtr
32 S.K.S. Ispat Pvt. Ltd., 06.10.2006 1- Sponge Iron 3.30 LTPA 1175.00 Raipur Brownfield
Mumbai Projects
2- Captive Power Plant 130 MW
3- SMS / Concast 2.37 LTPA
4- Rolling Mill 1.60 LTPA
5- Ferro Alloys 2 x 9 MVA
6- Coal Washery 1.00 mTPA
7- Sponge Iron 2nd phase 5.00 LTPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 6 of 24
Mumbai Projects

S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
8- Coke Oven / Sinter Plant 11.00 LTPA
9- Arc Furnace 8.00 LTPA
10- Oxygen Plant 10.00 TPD
11- Rolling Mill Special Steel 6.00 LTPA
33 Raipur Alloys & Steel 06.10.2006 1- Sponge Iron 5.00 LTPA 720.00 Raipur Brownfield
Limited, Raipur 2- Steel 2.40 LTPA Projects
3- Captive Power Plant 40 MW
4- Structural Rolling Mill 2.00 LTPA
5- Coal Washery 4.00 LTPA
34 Lafarge India Private 06.10.2006 1- Clinker 1.50 mTPA 515.00 Raipur Brownfield
Limited, Sonadih, Projects
2- Blended Cement 0.10 mTPA
Raipur
35 Ambuja Cement 07.12.2006 1- Blended Cement *1.70 mTPA 1288.89 Raipur Brownfield
Eastern Limited, Raipur Projects
2- Clinker 2.72 mTPA
(Substitution)
3- Captive Power Plant 48 MW
36 Shri Bajrang Metalics & 21.12.2006 1- Ribd Bar Mill 1.25 LTPA 109.41 Raipur Brownfield
Power Ltd., Raipur Projects
2- Captive Power Plant 12 MW
3- Pig Iron 0.60 MW
37 Rajesh Strips Ltd., 16.01.2007 1- Steel Melting Shop 3.00 LTPA 120.00 Raipur Brownfield
Raipur Projects
2- Structural Mill 1.50 LTPA
38 Rajesh Strips Ltd., 16.01.2007 1- Captive Power Plant 50 MW 200.00 Raipur Greenfield
Raipur Projects
39 Emami Paper Mills Ltd., 30.03.2007 1- Clinker 2.70 mTPA 1600.00 Raipur Greenfield
Kolkata Projects
2- Cement 4.05 mTPA
3- Power 50x2 MW
40 ACC Limited, Durg 30.03.2007 1- Clinker 1.25 mTPA 400.00 Durg Brownfield
Projects
2- Cement 2.50 mTPA
41 ACC Limited, Durg 30.03.2007 1- Clinker 2.72 mTPA 1400.00 Janjgir Greenfield
Champa Projects
2- Cement 4.05 mTPA
42 Grasim Industries Ltd., 30.03.2007 1- Clinker 0.45 mTPA 180.00 Raipur Brownfield
Raipur Projects
2- Cement 0.94 mTPA
3- Captive Power Plant 30 MW
43 Grasim Industries Ltd., 30.03.2007 1- Clinker 2.72 mTPA 1200.00 Raipur Greenfield
Raipur Projects
2- Cement 3.50 mTPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 7 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
44 Monnet Ispat & Energy 30.03.2007 1- Clinker 1.00 mTPA 1400.00 Raigarh Greenfield
Ltd., Raipur Projects
2- Cement 1.50 mTPA
1- Clinker 1.40 mTPA Raipur
2- Cement 2.00 mTPA
45 Jindal Steel & Power 30.03.2007 1- Clinker 1.00 mTPA 720.00 Raigarh Greenfield
Ltd., Raigarh Projects
2- Cement 2.00 mTPA
3- Power 30 MW
46 Rungta Mines Ltd., 30.03.2007 1- Clinker 1.00 mTPA 400.00 Raipur Greenfield
Chaibasa (Jharkhand) Projects
2- Cement 1.49 mTPA

47 Century Cement, 30.03.2007 1- Clinker 0.20 mTPA 109.60 Raipur Brownfield


Raipur Projects
2- Cement 0.60 mTPA
3- Captive Power Plant 11 MW
48 Jindal Steel & Power 04.05.2007 1- Blast Furnace 3.20 mTPA 8000.00 Raigarh Brownfield
Ltd., Raigarh Projects
2- BOF 3.00 mTPA
3- Ladle Refining Furnace 2x120 MT
4- Casters 2x1.5 mTPA
5- Rolling Mill 3.00 mTPA
6- Oxygen Plant 2800.00 TPD
7- Power Plant 600 MW
8- Railway Siding, RMH, Lime
Plant & Others
49 Bhushan Power & Steel 04.05.2007 1- Integrated Steel Making 1.20 mTPA 5500.00 Janjgir Greenfield
Ltd., New Delhi Facilities Champa Projects
2- Captive Power Plant 300 MW
3- Rolled Product 4.20 LTPA
4- Wire Drawing 1.80 LTPA
5- Galvanise Wire 1.20 LTPA
6- Steel Casting 1.20 LTPA
7- Forging 0.60 LTPA
8- Alloy Steel/ Stainless Steel 1.20 LTPA
Bright Bar
9- Seamless Pipe 1.80 LTPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 8 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
10- Slag Cement Plant 5.00 LTPA
50 Monnet Ispat & Energy 04.05.2007 1- Electric Furnace (Steel Mill) 1.55 mTPA 2087.00 Raigarh Brownfield
Ltd., Raipur Projects
2- Captive Power Plant 170 MW
3- Ferro Alloys Plant 0.075 mTPA
4- Rolling Mill & Plate Mill 1.50 mTPA
5- Blast Furnace 1.00 mTPA
6- Pelletization Plant 1.80 mTPA
7- Coal Benefication Plant 1.00 mTPA
8- Sinter Plant 0.75 mTPA
9- Sponge Iron Plant for 0.40 mTPA
CAPTIVE USE
51 Vandana Ispat Ltd. 04.05.2007 1- Integrated Steel Plant 8.30 LTPA 1310.00 Rajnadgaon Greenfield
Projects
2- Steel Melting Shop 7.50 LTPA
3- Sinter Plant 5.05 LTPA
4- Captive Power Plant 120 MW
5- Rolled Product / Rolling Mill 6.90 LTPA

6- High Grade Iron Ore Pallets 6.00 LTPA

7- Oxygen Plant 60.00 CM


8- Coke Oven Battary 20.00 LTPA
9- Ferro Alloys 48.00 LTPA
10- Coal Tar Products 0.75 LTPA
11- Fly Ash Based Products 1.08 LTPA
12- Coal Washery 12.00 LTPA
52 Topworth Steels Pvt. 04.05.2007 1- Blast Furnace (450 M) 5.00 LTPA 1225.74 Durg Brownfield
Ltd., Mumbai Projects
2- Sintering Plant (1x60M) 5.80 LTPA
3- Coke Oven Plant 4.00 LTPA
4- Electric Arc Furnace 70 MW
5- Ferro Alloys (2x9 MVA) 30000 TPA
6- Pelletisation Plant 10.00 LTPA
7- Rolling Mill for Strips 1.00 LTPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 9 of 24
Ltd., Mumbai Projects

S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
8- Rolling Mill for Special Steels 3.00 LTPA

9- Oxygen Plant 1500 Nm3/Hr


10- Captive Power Plant 80 MW
53 M.S.P. Steel & Power 04.05.2007 1- Pig Iron 4.00 LTPA 850.00 Raigarh Brownfield
Pvt. Ltd., Kolkata Projects
2- Pellet Plant 6.00 LTPA
3- Billets 3.00 LTPA
4- DRI - (Captive Use) 3.00 LTPA
5- Re-Rolled Products 3.00 LTPA
6- Captive Power Plant 60 MW
54 Salasalar Sponge & 04.05.2007 1- Steel Plant 1.00 LTPA 230.60 Raigarh Brownfield
Power Limited, Raipur Projects
2- Captive Power Plant 48 MW
3- Coal Washery 4.24 LTPA

55 Lafarge India Private 07.06.2007 1- Clinker 1.60 mTPA 947.50 Janjgir Brownfield
Limited, Mumbai Champa Projects
2- Cement 1.00 mTPA
3- Captive Power Plant 23 MW
56 Shri Cement Limited, 07.06.2007 1- Clinker 1.90 mTPA 1000.00 Raipur Greenfield
Bewar, Dist - Ajmer Projects
2- Cement 2.20 mTPA
(Rajsthan)

57 Prakash Industries 18.06.2007 1- Integrated Steel Plant 1.20 mTPA 2145.00 Janjgir Brownfield
Limited, New Delhi Champa Projects
2- Captive Power Plant 560 MW
3- Coal Washery 3.00 mTPA
58 Singhal Enterprises 23.06.2007 1- Pig Iron (With Sinter 50 Sqm) 2.40 LTPA 500.00 Raigarh Greenfield
Pvt. Ltd., Raigarh Projects
2- Sponge Iron (Captive) 2.00 LTPA
3- Captive Power Plant 60 MW
4- Steel 3.00 LTPA
5- Re-Rolled Mill 2.00 LTPA
6- Coal Washery 1.20 LTPA
59 Anjani Steel (P) Ltd., 02.08.2007 1- Integreated Steel Plant 2.50 LTPA 410.00 Raigarh Brownfield
AIlahabad Projects
2- Ferro Alloys 0.50 LTPA
3- Captive Power Plant 60 MW

MD\sipb2\mou\mou_progress(eng)\Alive Page 10 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
60 HEG Limited, Durg 02.08.2007 1- Captive Power Plant 20 MW 280.00 Durg Brownfield
Projects
2- Sponge Iron Plant 3.50 LTPA
61 Mangal Sponge & Steel 02.08.2007 1- Sponge Iron Plant 1.20 LTPA 140.00 Bilaspur Brownfield
(P) Ltd., Bilaspur Projects
2- Captive Power Plant 16 MW
3- Induction Furnace 1.00 LTPA
4- Rolling Mill 0.60 LTPA
62 S.K.Sarawagi & 02.08.2007 1- Sponge Iron Plant 2.10 LTPA 330.00 Raipur Greenfield
Company Ltd., Kolkata Projects
2- Captive Power Plant 16 MW
3- Steel 1.00 LTPA
4- Rolling Mill 0.60 LTPA
63 Bharat Aluminium 09.08.2007 1- Aluminum Smelter 6.50 LTPA 8100.00 Korba Brownfield
Company Ltd., Korba Projects

64 Electrosteel Casting 29.11.2007 1- Clinker 2.00 mTPA 1150.00 Kabirdham Greenfield


Limited, Rajgangpur, Projects
2- Cement 3.00 mTPA
Orisa

65 Maanheruka Cement 01.07.2008 1- Clinker 0.50 mTPA 300.00 - Greenfield


Ltd, Kolkata Projects
2- Cement 0.75 mTPA
66 Jaiswal Neco Industries 01.07.2008 1- Clinker 0.60 mTPA 418.00 - Greenfield
Ltd., Raipur Projects
2- Cement (Slag Based) 1.00 mTPA

67 SKS Ispat & Power 01.07.2008 1- Clinker 1.00 mTPA 680.00 - Greenfield
Ltd., Raipur Projects
2- Cement 2.00 mTPA
3- Captive Power Plant 40 MW
68 Singhal Steels Pvt. 01.07.2008 1- Clinker 1.00 mTPA 600.00 - Greenfield
Ltd., Raipur Projects
2- Cement 1.40 mTPA
3- Captive Power Plant 25 MW
69 Prakash Industries 01.07.2008 1- Clinker 1.00 mTPA 485.00 - Greenfield
Limited, Champa Projects
2- Cement 2.00 mTPA
70 Sarda Energy & 01.07.2008 1- Clinker 1.00 mTPA 550.00 - Greenfield
Minerals Ltd., Raipur Projects
2- Cement 2.00 mTPA
71 Topworth Cement Pvt. 01.07.2008 1- Clinker 1.00 mTPA 666.31 - Greenfield
Ltd., Mumbai Projects
2- Cement 2.00 mTPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 11 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
71 Topworth Cement Pvt. 01.07.2008 Crore)
666.31 - Greenfield
Ltd., Mumbai Projects
1 2 3 4 5 6 7 8
3- Captive Power Plant 40 MW
72 Godawari Power & 01.07.2008 1- Clinker 1.00 mTPA 628.00 - Greenfield
Ispat Ltd., Raipur Projects
2- Cement 2.00 mTPA
3- Captive Power Plant 50 MW
73 Adhunik Corporation 07.08.2008 1- Clinker 1.00 mTPA 700.00 - Greenfield
Ltd., Kolkata Projects
2- Cement 1.50 mTPA
3- Captive Power Plant 50 MW
74 Aryan Ispat & Power 07.08.2008 1- Clinker 1.00 mTPA 593.98 - Greenfield
Pvt. Ltd., Bilaspur Projects
2- Cement 1.50 mTPA
3- Captive Power Plant 1.50 mTPA
75 Shri Bajrang Metalics & 07.08.2008 1- Clinker 1.00 mTPA 735.00 - Greenfield
Power Ltd., Raipur Projects
2- Cement 1.50 mTPA
3- Captive Power Plant 50 MW
76 Jai Prakash Associates 07.08.2008 1- Clinker 1.50 mTPA 1005.00 Raipur Greenfield
Ltd., New Delhi Projects
2- Cement 2.00 mTPA
3- Captive Power Plant 25 MW

77 Kasturi Cement Pvt. 07.08.2008 1- Clinker 0.35 mTPA 150.00 Raipur Greenfield
Ltd., Raipur Projects
2- Cement 0.50 mTPA
78 K.P.Cement 07.08.2008 1- Clinker 0.50 mTPA 325.00 - Greenfield
Menuifacturing Co. Pvt. Projects
Ltd., Durg 2- Cement 0.75 mTPA
79 MSP Steel & Power 07.08.2008 1- Clinker 1.00 mTPA 800.00 - Greenfield
Ltd., Kolkata Projects
2- Cement 1.50 mTPA
3- Captive Power Plant 50 MW
80 Shyam Century 07.08.2008 1- Clinker 1.00 mTPA 550.00 - Greenfield
Ifrastructure Ltd., Projects
2- Cement 1.50 mTPA
Raipur
81 Ultratech Cement Ltd., 07.08.2008 1- Clinker 2.00 mTPA 1100.00 - Greenfield
Raipur Projects
2- Cement 3.00 mTPA
3- Captive Power Plant 50 MW
82 Aarti Sponge & Power 08.08.2008 1- Sponge Iron Plant 1.05 LTPA 305.00 Raipur Greenfield
Ltd., Raipur Projects
2- Captive Power Plant 10 MW

MD\sipb2\mou\mou_progress(eng)\Alive Page 12 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
82 Aarti Sponge & Power 08.08.2008 305.00
Crore) Raipur Greenfield
Ltd., Raipur Projects
1 2 3 4 5 6 7 8
3- Steel Melting Shop 0.90 LTPA
4- Rolling Mill 2.00 LTPA
5- Palletizing & Benificiation 6.00 LTPA
Plant
6- Fly Ash Bricks 3 LTPA
83 API Ispat & Powertech 08.08.2008 1- Coke Oven Plant (Non 3.00 LTPA 1015.00 Raigarh Greenfield
(P) Ltd., Raipur Recovery) Projects
2- Sinter Plant 3.96 LTPA
3- Blast Furnace 2.45 LTPA
4- Palletizing Plant 6.00 LTPA
5- Sponge Iron Plant 5.25 LTPA
6- Electric Arc Furnace 2.73 LTPA
7- Rolling Mill - Bar 1.00 LTPA
8- Section Mill 1.00 LTPA
9- Captive Power Plant 80 MW
10- Coal Washery 20.00 LTPA
11- Ferro Alloys Plant 0.36 LTPA
84 Jai Balaji Industries 08.08.2008 1- Iron Ore Pellet Plant 1.20 mTPA 1450.00 Durg Greenfield
Ltd., Kolkata Projects
2- Sinter Plant 0.458 mTPA
3- DRI Plant 0.60 mTPA
4- Mini Blast furnace 0.458 mTPA
5- Captive Power Plant 96 MW
6- Coal Washery 1.549 mTPA
7- Steel Melt Shop 1.00 mTPA
8- Rolling Mill 0.50 mTPA
85 Baldev Alloys Pvt. Ltd., 08.08.2008 1- Sponge Iron Plant 4.50 LTPA 430.00 Baster Greenfield
Raipur Projects
2- Captive Power Plant 40 MW
3- Palletizing & Benificiation 3.00 LTPA
Plant
4- SMS Plant 2.00 LTPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 13 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
86 Crest Steel & Power 08.08.2008 1- Sponge Iron Plant 0.75 mTPA 1536.00 Durg Brownfield
(P) Ltd., Mumbai Projects
2- Captive Power Plant 90 MW
3- Steel Melting Shop 5.00 LTPA
4- Electric Arc Furnace 3.20 LTPA
5- Coal Washery 3.00 mTPA
6- Rolling Mill 6.00 LTPA
7- Iron Ore Crushing Plant 1.80 mTPA
8- Wire Rod Mill 2.00 LTPA
9- Ferro Alloys Plant 0.60 LTPA
87 Godawari Power & 08.08.2008 1- DRI Plant 6.00 LTPA 1570.00 Raipur Brownfield
Ispat Ltd., Raipur Projects
2- Pig Iron 2.00 LTPA
3- Steel Billet 6.00 LTPA
4- Steel Rolled Products 5.00 LTPA
5- Captive Power Plant 100 MW
6- Ferro Alloys Plant 0.20 LTPA
7- Calcination Plant 1.00 LTPA
8- Palletizing Plant 30.00 LTPA
88 Jindal Steel & Power 08.08.2008 1- Pallet Plant 7.00 mTPA 18300.00 Raigarh Brownfield
Ltd., Raigarh Projects
2- Coal Gaisifires 18 Unit
3- DRI Plant 5.20 mTPA
4- Electric Arc Furnace 2 x 250 t
5- Ladle Furnace 4 x 250 t
6- Slab Caster 3 x 1 Sreand
7- Rolling Mill 2.00 mTPA
8- Hot Strip Mill 2.00 mTPA
9- Oxygen Plant 4000 TPD
10- Captive Power Plant 1000 MW
11- Utility, Electrical, RMH etc. As required to cater to
above major production
12- Railway Siding, As required to cater to
facilities.
Infrastructure, Transport etc. above major production
facilities.

MD\sipb2\mou\mou_progress(eng)\Alive Page 14 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
13- Ancillary facilities necessary -
for the above units

89 Khetan Sponge & 08.08.2008 1- Sponge Iron Plant 0.90 LTPA 209.00 Raipur Brownfield
Infrastructure Pvt. Ltd., Projects
2- Palletization Plant 3.00 LTPA
Raipur
3- Induction Furnace 0.60 LTPA
4- Rolling Mill 0.58 LTPA
5- Coal Washery 1.00 MTPA
6- Captive Power Plant 16 MW
90 Nalwa Steel & Power 08.08.2008 1- DRI Plant (Coal Based) 3.30 LTPA 3100.00 Raigarh Brownfield
Ltd., Raigarh Projects
2- Blast Furnace 3.19 LTPA
3- Sinter Plant 3.68 LTPA
4- Steel Melting Shop 3.36 LTPA
5- Captive Power Plant 25 MW
(WHRB)
6- Captive Power Plant (AFBC) 51 MW

7- DRI Plant (Gas Based) 2.00 mTPA


8- Coal Gasification Plant 1790 million
Nm3/Yr
9- Structural Mill 2.00 LTPA

91 Jayswal Neco 08.08.2008 1- Sponge Iron Plant 0.60 mTPA 2020.00 Raigarh Greenfield
Industries Ltd., Raipur Projects
2- Steel Billets 0.70 mTPA
3- Rolling Mill 0.65 mTPA
4- Pig Iron 0.35 mTPA
5- Captive Power Plant 90 MW
6- Coke Oven 0.20 mTPA
7- Sinter Plant 0.40 mTPA
92 Nova Iron & Steel Ltd., 08.08.2008 1- Sponge Iron Plant 0.60 mTPA 606.00 Bilaspur Brownfield
Bilaspur Projects
2- Captive Power Plant 40 MW
(WHRB)
3- Captive Power Plant (Coal 24 MW
Middings)
93 Raipur Power & Steel 08.08.2008 1- Sponge Iron Plant 1.35 LTPA 135.00 Durg Greenfield
Ltd., Ludhiana Projects

MD\sipb2\mou\mou_progress(eng)\Alive Page 15 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
93
1 Raipur Power2 & Steel 08.08.2008
3 4 5 135.00
6 Durg
7 Greenfield
8
Ltd., Ludhiana Projects
2- Captive Power Plant 12 MW
3- Induction Furnace 0.90 LTPA
4- Rolling Mill 0.90 LTPA
94 Rashmi Ispat Private 08.08.2008 1- Sponge Iron Plant 3.15 LTPA 550.00 Raipur Greenfield
Limited, Raipur Projects
2- Steel Melting Shop 2.10 LTPA
3- Captive Power Plant 40 MW
4- Pig Iron 0.90 LTPA
5- Ferro Alloys Plant 0.60 LTPA
6- Rolling Mill 1.20 LTPA
7- Coal Washery 6.00 LTPA
95 Real Ispat & Power 08.08.2008 1- Sponge Iron Plant *0.72 mTPA 1190.00 Raipur Greenfield
Ltd., Raipur Projects
2- Blast Furnace 0.30 mTPA
(Substitution)
3- Captive Power Plant *162 MW
4- SMS with CCM 0.30 MTPA
5- Rolling Mill 0.30 MTPA
6- Oxygen Plant 3.00 MCMPA
7- Coke Oven Plant 0.30 mTPA
8- Sinter Plant 0.30 MTPA
9- Palletization Plant 0.60 mTPA
10- Ferro Alloys Plant 0.06 mTPA
11- Coal Washery 1.70 mTPA
96 R.L. Steel & Energy 08.08.2008 1- Sponge Iron Plant 4.00 LTPA 293.00 Raigarh Greenfield
Ltd., New Delhi Projects
2- Captive Power Plant 18 MW
3- Steel Melting Shop 1.00 LTPA
97 Satya Power & Ispat 08.08.2008 1- Sponge Iron Plant 800.00 TPD 376.00 Bilaspur Brownfield
Pvt. Ltd., Bilaspur Projects
2- Captive Power Plant 74 MW
3- Induction Furnace 72.00 TPH
4- Ladle Furnace 8.00 TPH
5- Coal Washery 100.00 TPH
98 Shree Shyam Sponge 08.08.2008 1- Sponge Iron Plant 1.35 LTPA 205.00 Raipur Brownfield
& Power Ltd., Raipur Projects
2- Captive Power Plant 12 MW
3- Pig Iron & Sinter Plant 1.80 LTPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 16 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
99 SKS Ispat & Power 08.08.2008 1- Sponge Iron Plant 12.00 LTPA 3611.00 Raigarh Greenfield
Ltd., Raipur Projects
2- Captive Power Plant 300 MW
3- SMS Concast 7.50 LTPA
4- Rolling Mill 6.30 LTPA
5- Blast Furnace 2.70 LTPA
6- Arc Furnace 7.00 LTPA
7- Ferro Alloys Plant 2.40 LTPA
8- Coal Washery 30.00 LTPA
9- Rolling Mill Special Steel 6.00 LTPA
10- Sinter Plant 5.00 LTPA
11- Coke Oven Plant 2.00 LTPA
12- Oxygen Plant 400 TPD
13- Fly Ash Bricks 100000 Nos./day
14- Palletization Plant 10.00 LTPA

100 Surya Global Steel & 08.08.2008 1- Coal Washery 1.90 MTPA 3000.00 Durg Greenfield
Genpower Ltd., New Projects
2- Sinter Plant 6.00 LTPA
Delhi
3- DRI Plant 14.00 LTPA
4- Blast Furnace with PCM 6.00 LTPA
5- Steel Melting & Continuous 20.00 LTPA
Casting Shop
6- Rolling Mill 10.00 LTPA
7- Captive Power Plant 250 MW

101 Visa Steel Limited, 08.08.2008 1- Blast Furnace with Sinter 1.50 mTPA 4750.00 Raigarh Greenfield
Raipur Projects
2- Ferro Alloys Plant 0.10 mTPA
(Substitution
3- Coke Oven 0.40 mTPA in MoU dated
05-03-2003)
4- Sponge Iron Plant 1.00 mTPA
5- Coal Washery 2.00 mTPA
6- SMS & Rolling Mill 2.50 mTPA
7- Pellet Plant 1.20 mTPA
8- Captive Power Plant 500 MW
102 Maa Mahamaya 12.08.2008 1- Sponge Iron Plant 4.05 LTPA 600.00 Greenfield
Industries Limited, Projects
2- Steel Melting Shop 2.16 LTPA
Dhamtari

MD\sipb2\mou\mou_progress(eng)\Alive Page 17 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
102 Maa Mahamaya 12.08.2008 Crore)
600.00 Greenfield
Industries Limited, Projects
1 Dhamtari 2 3 4 5 6 7 8
3- Captive Power Plant 60 MW
4- Rolling Mill 2.00 LTPA
5- Palletizing Plant 6.00 LTPA
6- Coal Washery 1.44 LTPA
7- Ferro Alloys 0.25 LTPA
8- Pig Iron 0.90 LTPA
103 NMDC Limited, 03.09.2008 1- Integrated Steel Plant 3.00 mTPA 10000.00 Baster Greenfield
Hyderabad Projects

104 K. Energy Company 12.09.2008 1- Sponge Iron Plant 2.10 469.00 Janjgir Greenfield
Limited, Raipur Champa Projects
2- Induction Furnace 1.92
3- Rolling Mill 1.80
4- Captive Power Plant 60
105 Prakash Industries 12.09.2008 1- Blast Furnace 1.15 mTPA 2750.00 Janjgir Greenfield
Limited, Hissar Champa Projects
2- Sponge Iron Plant 1.60 mTPA
3- Steel Melting Shop 2.00 mTPA
4- Oxygen Plant 400 TPD
5- Duble Strand Wire Rod & 1.00 mTPA
Bar Mill
6- Double Strand TMT Mill 1.00 MTPA
7- Captive Power Plant 80 MW
(WHRB)
8- BF Gas Based Captive 24 MW
Power Plant
106 Writers & Publishers 27.09.2008 1- Integrated Industrial Hub - 10000.00 Raipur Greenfield
Limited, Bhopal Projects

107 Sairam Pipe Plant 27.09.2008 1- ERW Pipe (Outer Diameter 100000 MT 300.00 Raipur Greenfield
Limited, Raipur 6" to 24") Projects

108 Singhal Steels Pvt. 01.10.2008 1- Palletizing Plant 3.00 LTPA 700.00 Raigarh Greenfield
Ltd., Kolkata Projects
2- Blast Furnace 3.00 LTPA
3- Sponge Iron Plant 2.00 LTPA
4- Induction Furnace 2.59 LTPA
5- Electric Arc Furnace 3.00 LTPA

MD\sipb2\mou\mou_progress(eng)\Alive Page 18 of 24
108 Singhal Steels Pvt. 01.10.2008 700.00 Raigarh Greenfield
Ltd., Kolkata Projects
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
6- Captive Power Plant 16 MW
(WHRB)
7- Captive Power Plant (FBC) 30 MW

8- Coal Washery 5.00 LTPA


109 MSP Steel & Power 01.10.2008 1- Sponge Iron Plant 9.00 LTPA 4930.00 Raigarh Greenfield
Ltd., Kolkata Projects
2- Blast Fuenace (2x325 m2) 7.00 LTPA
3- Steel Melting Shop 15.00 LTPA
4- HR Mill 12.00 LTPA
5- Wire Rod Mill 5.00 LTPA
6- Ferro Alloys Plant 1.50 LTPA
7- Captive Power Plant 108 MW
8- (WHRB)
Captive Power Plant (AFBC) 200 MW
9- Coal Washery 20.00 LTPA
10- Sintering Plant (2x30 m2) 7.50 LTPA
11- Coke Oven (Non-recovery) 5.00 LTPA
12- Palletizing Plant 15.00 LTPA
110 Mahendra Sponge & 01.10.2008 1- Sponge Iron Plant 2.70 LTPA 485.00 Durg Greenfield
Power Pvt. Ltd., Raipur Projects
2- Steel Billet 1.50 LTPA
3- Coal Washery 10.00 LTPA
4- Ferro Alloys Plant 0.30 LTPA
5- Captive Power Plant 40 MW
6- Pig Iron Plant 1.20 LTPA
7- Palletization & Beneficiation 3.00 LTPA
Plant
8- TMT / Structural Rolling Mill 2.50 LTPA

111 Hind Energy & Coal 03.10.2008 1- Sponge Iron Plant 4.05 LTPA 505.00 Janjgir Greenfield
Benificiation (India) Pvt. Champa Projects
2- Steel Melting Shop 2.16 LTPA
Ltd., Bilaspur
3- Captive Power Plant 50 MW
4- Rolling Mill 2.00 LTPA
5- Palletization Plant 6.00 LTPA
6- Coal Washery 14.40 LTPA
112 Solar Industries 03.10.2008 1- Ammonia 5.94 LTPA 5487.00 Janjgir Greenfield
Limited, Nagpur Champa Projects

MD\sipb2\mou\mou_progress(eng)\Alive Page 19 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
112
1 Solar Industries
2 03.10.2008
3 4 5 5487.00
6 Janjgir
7 Greenfield
8
Limited, Nagpur Champa Projects
2- Di Methyl Eher (DME) 9.29 LTPA
3- Captive Power Plant 70 MW
4- Coal Washery 0.14 LTPA
113 Shanti G.D. Ispat & 08.10.2008 1- Clinker 1.00 mTPA 550.00 Janjgir Greenfield
Power Pvt. Ltd., Raipur Champa Projects
2- Cement 1.50 mTPA
3- Captive Power Plant 25 MW
114 Mars Power & Steel 05.09.2009 1- Ferro Alloys Plant 0.30 LTPA 201.00 Janjgir Greenfield
Limited, Raipur Champa Projects
2- Captive Power Plant 35 MW
115 Sky Alloys & Power 11.09.2009 1- Induction Furnace 1.00 LTPA 270.00 Raigarh Greenfield
Pvt. Ltd., Raipur Projects
2- Rolling Mill 1.00 LTPA
3- Ferro Alloys Plant 0.30 LTPA
4- Captive Power Plant 35 MW
116 Lanco Solar Pvt. Ltd., 24.02.2010 1- Polycrystalline Silicon 3750 TPA 4250.00 Rajnandgaon Greenfield
Hyderabad Projects
2- Silicon Ingots/Wafer and 250 MW (Subsititution)
Modules Equivalent

3- Captive Power Plant *200 MW


117 Zeba Solar Private 04.03.2010 1- PV Solar Panal 36 MW 383.50 Raipur Greenfield
Limited, Raipur Manufacturing Plant Equivalent Projects
118 Godawari Power & 24.05.2010 1- Gassifier based DRI Plant 1.00 mTPA 5920.00 Rajnadgaon Greenfield
Ispat Ltd., Raipur with O2, N2, Argon Gas Projects
2- Pig Iron Blast Furnace 1.00 mTPA
3- Sinter Plant 1.50 mTPA
4- Coke Oven 0.60 mTPA
5- Pellet Plant with Iron Ore 3.50 mTPA
Beneficiation
6- Steel Melting Shop 2.00 mTPA
7- Seamless/ ERW Tube/ Pipes 0.50 mTPA
8- MS/ SS/ Alloy Steel/ SS 0.50 mTPA
9- Bars/ Wire
HR / CR Rods
Coil / Sheets, 1.00 mTPA
Narrow width Plate
10- Ferro Alloys 0.20 mTPA
11- Captive Power Plant 300 MW

MD\sipb2\mou\mou_progress(eng)\Alive Page 20 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment (Rs. Distt.
Crore)
1 2 3 4 5 6 7 8
12- Coal Beneficiation Plant 10.00 mTPA
119 Rashi Strips Private 17.06.2010 1- DRI Plant with Gasification 1.00 mTPA 2200.00 Bilaspur Greenfield
Limited, New Delhi Projects
2- Steel Melting Shop 0.90 mTPA
3- Rolling Mill 0.90 mTPA
4- Ferro Alloys 0.06 mTPA
5- Coal Washery 2.40 mTPA
6- Beneficiation & Palletization 2.00 mTPA
of Iron Ore
7- Captive Power Plant 200 MW
8- Fly Ash Bricks 30 million
9- Railway Siding Infrastructure Nos

120 Gontermann Piepers 14.06.2010 1- Pallet Plant 1.20 mTPA 270.00 Dantewada Greenfield
(India) Limited, Projects
Parganas (South),
West Bemgal

121 J.K.Lakshmi Cement 28.07.2010 1- Clinker 1.50 mTPA 1000.00 Durg Geenfield
Limited, Jaykaypuram, Projects
2- Cement 1.50 mTPA
Sirohi, Rajsthan
9- Captive Power Plant 2x20 MW
Total 192126.09
(*) Subsititution

MD\sipb2\mou\mou_progress(eng)\Alive Page 21 of 24
State Investment Promotion Board
List of Cancelled MoU's
Update on 30-09-2010
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Crores)
1 2 3 4 5 6 7 8
1 Bhushan Ltd., New 11.07.2001 1- Steel Products 1200000 MT 2285.00 Korba Cancelled on
Delhi 20-09-2005
2- Power Plant 270 MW
3- Coal Washery 4500000 MT
2 Agio Industries Pvt. 13.08.2002 1- Sponge Iron Plant 30 TPD 80.00 Bilaspur Cancelled on
Ltd., Bilaspur (Shri 2- Waste Heat Power Plant 8 MW (Phase-I) 20-09-2005
M.L.Jalan NRI
Moscow) 3- Steel Melting Shop 24000 TPA
4- Coal & Iron Ore Mining
1- Power Generation 7.5 MW 35.00 Raigarh
2- SMS & Concost - one
furnace
1- Sponge Iron Kiln 300 TPD 65.00 Bilaspur
2- Waste Heat Power Plant 8 MW (Phase-II)
3 Sun Vijay Rolling & 21.04.2003 1- Sponge Iron Plant 320000 MT 465.00 Raigarh Cancelled on
Engg. Ltd., Nagpur 2- MS Ingot & Billets 200000 MT 20-09-2005
3- Rolling Mill 100000 MT
4- Power Plant 40 MW
5- Coal Washery
6- Coal Mining
7- Iron Ore Mining & Others
4 Vandana Energy & 8.9.2003 1- Coal based Sponge Iron 150000 TPA 145.00 Raipur And Cancelled on
Steels (P) Ltd. Raipur Plant Raigarh 29-09-2007
2- Captive Power Plant 16 MW
3- Integrated Steel Plant
4- Captive Coal Mine &
Washery
5- Merchant Coal Washery
5 National Steel and Agro 8.9.2003 1- Sponge Iron Plant 150000 TPA 150.00 Durg Cancelled on
industries Ltd. Mumbai 29-09-2007
2- Waste Heat Power Plant 25 MW
3- Steel Melting Shop 150000 TPA
6 Aryan Ispat & Power 16.08.2004 1- Sponge Iron Plant 460000 TPA 860.00 Raipur Cancelled on
Pvt. Ltd., Bilaspur 29-09-2007
2- Steel Billets 348000 TPA

MD\sipb2\mou\mou_Progress(Eng)\Cancelled Page 22 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
6 Aryan Ispat & Power 16.08.2004 (Crores)
860.00 Raipur Cancelled on
Pvt. Ltd., Bilaspur 29-09-2007
1 2 3 4 5 6 7 8
3- Power Plant 116 MW
4- Coal Washri
7 Alaince Integrated 16.08.2004 1- Mini Steel Plant 150000 PT 475.00 Raipur Cancelled on
Metalics Ltd., New 29-09-2007
2- Captive Power Plant 24 MW
Delhi
3- Sponge Iron 200000 TPA
4- Auto Components 25000 TPA
8 Magnum Steel Ltd., 16.08.2004 1- Sponge Iron 300000 TPA 212.00 Raipur Cancelled on
New Delhi 29-09-2007
2- Semis & Rolled Products 300000 TPA
3- Power Plant 30 MW
9 GPT Metal Industries 16.08.2004 1- Sponge Iron 105000 MT 139.00 Raipur Cancelled on
Ltd., Kolkata 29-09-2007
2- Power Plant 16 MW
3- Iron Ore Mining
4- Industion Furnesh 60000 TPA
10 BEC Projects Ltd., 16.08.2004 1- Sponge Iron 135000 MT 129.00 Durg Cancelled on
Bhilai 13-04-2007
2- Power Plant 15 MW
3- Steel Melting Shop
11 Chhattisgarh Iron & 16.08.2004 1- Sponge Iron 105000 MT 115.65 Durg or Cancelled on
Steel Co. Pvt. Ltd., Raigarh 29-09-2007
2- West Hit Power Plant 15 MW
Mumbai
3- Steel Melting Shop 100000 MT
12 Mega Power Builders & 16.08.2004 1- Sponge Iron 105000 TPA 115.00 Durg or Cancelled on
Developers Pvt. Ltd., Raigarh 29-09-2007
2- West Hit Power Plant 15 MW
Mumbai
3- Steel Melting Shop 100000 TPA
13 Anand Ispat Udyog Pvt. 16.08.2004 1- Sponge Iron 150000 TPA 110.00 Dantewada Cancelled on
Ltd., Bhilai 29-09-2007
2- Power Generation 10 MW
3- Industion Furnesh & Concost 130000 TPA

4- Mining & Equipment


14 Feral Enginnering 13.09.2004 1- D.R.I. 200000 MT 100.00 Chhattisgarh Cancelled on
Limited, Londan 29-09-2007
2- Power 10 MW
3- Steel Melting Shop 10000 MT
15 Laiteg Asia Limited, 13.09.2004 1- Power Plant 125.00 Chhattisgarh Cancelled on
Londan & Lenco 29-09-2007
Amarkantak Power Pvt.
Ltd., Hyderabad

MD\sipb2\mou\mou_Progress(Eng)\Cancelled Page 23 of 24
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Crores)
15
1 Laiteg Asia 2Limited, 13.09.2004
3 4 5 125.00
6 Chhattisgarh
7 Cancelled
8 on
Londan & Lenco 29-09-2007
2- Fly ash - Building Material
Amarkantak Power Pvt.
Ltd., Hyderabad

16 Bigboss Steel & Alloys 07.01.2005 1- Integrated Steel Plant 700.00 Janjgir Cancelled on
Limited, Kolkata Champa 29-09-2007
2- Power Plant

17 Vasundhara Steel & 07.01.2005 1- Integrated Steel Plant with 400000 TPA 465.00 Janjgir Cancelled on
Power Limited, New Captive Power Champa 29-09-2007
Delhi 2- Coal based captive power 82 MW
plant with WHRB and AFBC

18 Rexon Strips Ltd., 07.01.2005 1- Integrated Steel Plant with 400000 TPA 465.00 Bilaspur Cancelled on
Rourkela, Orissa Captive Power 29-09-2007
2- Coal based captive power 82 MW
plant with WHRB and AFBC

19 Shree Shyam Global 07.01.2005 1- Sponge Iron Plant 165000 TPA 124.00 Raipur Cancelled on
Pvt. Ltd., Janjgir- 29-09-2007
2- Power Plant 8 MW
Champa
3- Induction Furnace 72000 TPA
4- Re-rolling Mill (Structural) 60000 TPA
20 Balaji Vidyut & Sponge 07.01.2005 1- Sponge Iron Plant 60000 TPA 105.01 Raipur Cancelled on
Pvt. Ltd., Raipur 13-04-2007
2- Captive Power Plant 15 MW
3- Ferro Alloys (6 MVA) 15000 TPA
21 Texas Powergen, USA 22.05.2005 1- Thermal Power Plant 1000 MW 5550.00 Chhattisgarh Cancelled on
2- Sponge Iron 720000 TPA 29-09-2007
3- Induction Furnace 216000 TPA
4- Rolling Mill 216000 TPA
5- Captive Power Plant 100 MW
6- Coal Washery 720000 TPA
7- Structural Mill 100000 TPA
TOTAL INVESTMENT 13014.66