Professional Documents
Culture Documents
Excel Gantt Chart Template TeamGantt
Excel Gantt Chart Template TeamGantt
Date in Number Form 42576.00 Use this number for the Minimum Bound of the Horizontal Axis to set the beginning of the chart.
Tas k Seven
Task Eight 8/5/2016 8/12/2016 7
Task Eight
Task Nine 8/6/2016 8/9/2016 3
Task Ni ne
Task Ten 8/6/2016 8/10/2016 4
Ta sk Ten
Task Eleven 8/7/2016 8/13/2016 6
Tas k El even
Task Twelve 8/10/2016 8/16/2016 6
Tas k Twel ve
Task Thirteen 8/14/2016 8/19/2016 5
Task Thi rte en
These cells will be automatically calculated based on These cells require manual input so the calculated
the inputs on other cells. cells have data to work with.
Duration
Task Name Start Date End Date (Days)
Ta sk Six
1.75 5.25 25%
Ta sk Seven
4.90 2.10 70%
Ta s k Ei ght
0.90 5.10 15%
Ta s k Ni ne
2.40 1.60 60%
Ta s k Ten
3.90 2.10 65%
Ta sk Eleven
1.50 4.50 25%
Tas k Twel ve
1.50 3.50 30% Ta sk Thirteen
Key: Calculated
e cells will be automatically calculated based on the These cells require manual input so the
s on other cells. calculated cells have data to work with.
ing of the chart.
8/29/16 9/3/16
Duration
Task Name Start Date End Date (Days)
Ta s k Si x
1.75 5.25 25%
Ta sk Seve n
4.90 2.10 70%
Ta s k Eight
0.90 5.10 15%
Ta s k Ni ne
2.40 1.60 60%
Tas k Ten
3.90 2.10 65%
Ta s k El even
1.50 4.50 25%
Ta sk Twel ve
1.50 3.50 30% Ta sk Thi rteen
Key: Calculate
e cells will be automatically calculated based on the These cells require manual input so the
s on other cells. calculated cells have data to work with.
ing of the chart.
8/29/16 9/3/16