2. SITE DATA
The plant is in an industrial/marine/equatorial environment, with the following main
characteristics:
temperature min./max./norm. ........................ 10 C / 42 C / 36,6 C
relative humidity ............................................ Up to 90% non condensing
altitude ........................................................... Up to 20 m a.s.l.
Seismic condition .......................................... Zone 4 According to UBC97
The battery will be installed inside a dedicated battery compartment that is not actually provided
with ventilation system.
The cabinet will be modified with the addition of the ventilation system that will be sized by the
battery supplier according to the battery size and to the battery cabinet layout and dimensions
indicated in ANNEX 1 of this Data Sheet see also par. 4.3 of this Data Sheet.
Note 1: The battery is subjected to outdoor conditions and shall be able to operate without alteration of
its performance in the above condition. Under abnormal operating conditions, the ambient temperature
of the battery compartment may attain a steady state temperature of 50 C.
4.2. Electrical
Actual capacity @ 1.08V End discharge ................. 605 Ah/5h
Minimum capacity @ 20C ........................... ........... 610 Ah/5h
Residual capacity at end discharge ......................... 140 Ah
Float charge
current ................................................................. 0,6 5 mA/Ah
voltage ................................................................ 1,43 V/cell
Hydrogen release................................................ 7500 cm /h
3
5. ACCESSORIES
Intercells connection materials ..................................... Yes
Spare cells .................................................................... N 1
Densimeter ................................................................... N 1
Thermometer ................................................................ N 1
Cell voltage voltmeter ................................................... Yes
Adhesive plates with cell number ................................. Yes
Vessels and funnels for electrolyte transfer ................. N 1
Vaseline ........................................................................ Kg 1
258,6
A+B+C+D+E
183,6
B+C+D+E
161.1
161.1
161.1
C+D+E
93,5 93,5
30 sec
30 sec
30 sec
Current (A)
C+E C+E
30 sec
30 sec
3 min
3 min
3 min
28 28 28 28
E E E
3 min
3 min
15 min 30 min 600 min
10 sec
Time (Min)
Sizing Margin/Factor
NOTE:
1. Battery Mfr shall attach to the offer the maintenance procedure relative to the proposed
battery with the indication of all maintenance activities necessary to guarantee the battery
life and performance according to project operating conditions.
Rated
Load description HP/kW Efficiency Current (A)
voltage
LE-GT Emergency lighting GT
2/1.5 125 V 1 12
compartment
GCP-3 Generator protection panel 4/3 125 V 1 24
Rated
Load description HP/kW Efficiency Current (A)
voltage
UCP Unit control panel 2.7/2 125 V 1 16
A+B+C+D+E = 258,6 A
B+C+D+E = 183,6 A
C+D+E = 161,1 A
D+E = 95,6 A
C+E = 93,5 A
E = 28 A
QUALIFICATIONS FORM
Ref. to Tech.
Spec./Document/ Exception to Supplier's NP NP
International NP Techn. Alternative Comment to Accept/Reject NP Remarks
Code and Requirement Proposal Qualification Qualification (6)
Paragraph (2) (3) (4) (5)
(1)
ITN61506 no Accepted
ITN01305 no Accepted
ITN01303 no Accepted
ITN01301 no Accepted
ITK28300.00 no Accepted
ITK28300.08 no Accepted
We believe that the
proposed battery can
Find a new place
be installed inside the
for installation
existing battery
cabinet: we suggest
SAFT REMARKS
to arrange the battery
13April:
layout considering 2
Each individual cell
or 4 blocks each
UP1L610 is
suitable for entering in
26,5Kg.
the space 1250x630
In principle a metal
and then connect this
Crate can be used
The battery 2 or 4 blocks inside
to make a sub-
CABINET IS will be the compartment
assebled pack of 2,
NOT DESIGN placed inside
RAO02775REV1 3 or 4 cells pre- Accepted
TO CONTAIN the existing NP Remarks 20 April:
cabled each other
A BATTERY battery With reference of
but then problem
Cabinet SAFT clarification
still exist : how to
sent on 19 April we
insert these crates
agree with SAFT that
and how to connect
the type of batteries
them since cabinet
selected is the only
is too small? NOTE
one that can allow the
3
duration of 20 years.
cables/connectors
We are confident that
are needed for
for the placement of
each intercell
the batteries a
connection
solution will be shared
with SAFT.
SOM6631219 no
SOM6628932 no
SOK7350070 no
NOT
NOM-001-SEDE- APPLICABLE
Accepted
2005 ( Electrical
installation)
ITK28300.08
DS00U65 Battery Data sheet (customer format) RA-02775 11/06/2012 $
item 1
ITK28300.08
OE00U02 Battery Lay-out and Connection Diagram SOM6634342 11/06/2012 $
item 2
ITK28300.08 N/A
QP00U99 Battery Quality Control Plan 11/06/2012
item 3
ITK28300.08 N/A
N/A Battery Test certificates & reports 1 week ATD
item 4
ITK28300.08 Battery Instruction Manual (operation & N/A
N/A 1 week ATD
item 5 maintenance)
ITK28300.08 N/A
SP00U46 Battery storage & preservation procedure 11/06/2012
item 6
ITK28300.08 Supplier Test Report Form (blank copy for N/A
TR00U04 18/06/2012
item 7 approval)
Required Copies:
- for each drawings issues, electronic files (autocad + PDF) have to be submitted in both English
/ Spanish language.
- for all manuals, n 2 CD have to be to be submitt ed in both English / Spanish language.
Legend:
AO - Attached to Offer
AOD - After Order Date
ATD - After Test Date
$ - Subject to penalty for late delivery
The quotation submitted from the Manufacturer, including all the related
documentation MUST BE in English language.
Quotations not complete and not in English will be considered NOT VALID and
rejected.
Critical drawings approval (if not commented/approved after 6 weeks) shall not stop
production.
If the 6 weeks are elapsed and one drawing is becoming critical for production,
supplier shall inform GE Oil&Gas at least 1 week before.
GE Oil&Gas will never accept any production delay for late document approval if not
timely advised.
Comments analysis with reply/clarifications (if any): No more than 3 working days
770
630
90
22
1250
2820