ABS Seminar Hamburg BallastWaterOverview Feb2016
ABS Seminar Hamburg BallastWaterOverview Feb2016
Dietrich Dabels
Technology & Business Development Manager
Hamburg, Germany
22 February 2016
2
Understanding Requirements
3
BWM Convention Status
Entry into Force 12 months after ratification by 30 States representing 35% of World Tonnage
IMO 29th Assembly ratifications/accessions:
11/23 Morocco ratifies (0.03% world tonnage)
11/24 Indonesia ratifies (1.14% world tonnage
11/26 Ghana acceded (0.01% world tonnage)
IMO Press Briefing (15 January 2016) Criteria for entry into force of BWM Convention not yet
reached
34.56 % of World Tonnage
Needed 0.44% of World Tonnage
Announced preparations for ratification
Argentina 0.05% tonnage
India 0.82% tonnage
Panama 18.63%
Tentative Ratification (% tonnage):
Belgium 0.46%
Singapore 6.58%
Finland 0.14%
Italy 1.39%
Malta 4.81%
4
BWM Convention Implementation Schedule
28th IMO Assembly resolution adjusted the enforcement schedule of the BWM Convention
to align with the International Oil Pollution Prevention Renewal Survey.
Upon EIF, vessels are to comply with Regulation D-1 (Ballast Water Exchange Standard)
until the Regulation D-2 (Ballast Water Performance Standard) Compliance Date.
The BWM Convention will need to be amended upon ratification to incorporate an
implementation/enforcement schedule that takes into account the Entry Into Force (EIF)
date and appropriate time constrains for purchasing, installing, and commissioning a
BWMS.
Ballast
Keel Laying Date D-2 Compliance Date
Water Capacity (m3)
First IOPP Renewal Survey following the
All < EIF
date of EIF
5
BWM Requirements in the United States
The United States has not ratified the BWM Convention and
has established independent ballast water regulations
In the US, ships must be in compliance with:
USCG Ballast Water Regulations;
US EPA VGP; and
Individual State requirements
16 States have ballast water
requirements (California is the
most stringent)
BWMS require new testing and
type approval by the USCG
Compliance dates are based on
vessel drydocking
6
USCG BWM Regulations
General requirements for Ballast Water Management (BWM)
practices, reporting, and recordkeeping
New requirements for BWMS type approval
Ballast water discharge standards (BWDS) compliance schedule:
Vessel Ballast Capacity Compliance Date
New All Delivery
First Scheduled Drydocking
< 1,500 m3
after 1 January 2016
First Scheduled Drydocking
Existing 1,500 5,000 m3
after 1 January 2014
First Scheduled Drydocking
> 5,000 m3
after 1 January 2016
Notes:
New vessel constructed on or after 1 December 2013
CG-OES Policy Letter No. 13-01, Revision 2 (16 November 2015) - An underwater inspection in lieu of
drydocking (UWILD) is not considered the first scheduled drydocking.
7
Additional Requirements in 2013 VGP
Active Ingredient Discharge Limitations (dependent on technology)
Limit
Biocide or Residual
(Instantaneous Maximum)
Chlorine Dioxide 200 g/l
8
USCG: Ballast Water Management Options
Temporary Options
USCG Type
Approved BWMS USCG Extensions
USCG
On-shore Treatment Accepted AMS
9
Achieving USCG Type Approval
10
USCG Type Approval Process
Shipboard
Land-based
Testing Testing may
Testing
(20 weeks)
(minimum 6 occur in
months) Component parallel, but
Testing
the same
(~35 days) exact model
Vendor
makes a needs to be
Design &
contract
with IL
IL Construction
Review
(~90 days)
used for all
testing.
USCG Marine
IL Review and Test USCG Type
Report Generation
Safety Center
Approval
Approximately
Review 18 24 months
(~90 days) Awarded
(~90 days)
12
USCG Extensions: Revised Request Policy
16 November 2015 USCG revised policy and process
for submitting extensions
Batch submittal for a fleet of vessels with compliance
dates in the same year is now permitted.
Supplemental extension process explained for vessels
with existing extensions
Shipowners are required to submit:
Excel-based Application for Extended Compliance Date
under U.S. Coast Guard Ballast Water Management
(BWM) Regulations
Statement in email documenting reason for extension
request.
All documentation needs to be written in English and
emailed to environmental_standards@uscg.mil. Text in
document needs to be in a format that provides optical
character recognition (OCR).
Extension request to be submitted 12 to 24 months prior
to compliance date
USCG clarified that newbuilds may request extensions.
ABS has revised documentation templates.
13
USCG Extensions Granted
USCG has listed over 4402 approved extension requests.
Initial period for Extensions: 1 January 2016, 1 January 2017, or 1 January 2018
firm date, not related to drydocking
As of 18 November 2015, extensions are being granted to the next scheduled
drydocking
Shipowners with initial extensions to firm dates will need to wait until 1 year
prior to expiration of initial extension to request new extensions to drydocking
date
USCG will not be revising the initially approved extensions
15
Revised USCG Reporting Requirements
Submittal Times
Revision
Vessels equipped with ballast tanks and
bound for any US port or place, except
listed below 6 hours after arrival at or
prior to departure from the port or place of
destination, which ever is earlier
Revised reporting to reduce the number of
corrections
No changes for Vessels entering the Great
Lakes or Hudson River north of the
George Washington Bridge from outside
the Exclusive Economic Zone (EEZ) at
least 24 hours prior to arrival
16
New USCG Reporting Requirements
NEW - Annual Reports required for vessels
that exclusively operate in one Captain of
the Port (COTP) Zone.
New temporary requirement to determine if
further regulatory action is needed
Annual Reports on ballasting practices for
calendar years 2016, 2017, and 2018 by
31st March of the subsequent year.
USCG ballast water reporting is entered on
the National Ballast Information
Clearinghouse (NBIC) website
(http://invasions.si.edu/nbic/submit.html)
Revisions and new requirements effective
22 February 2016
17
Shipowner Next Steps
Note: ABS Technical Evaluation Services for BWMS assist with this
process. Refer to our brochure Technical Evaluation Services for
Ballast Water Management Systems
18
BWMS for Use in US Waters:
USCG Accepted Alternate Management System (AMS)
If installed prior to USCG Type Approved BWMS, AMS may be used for 5-years
from the vessels specific compliance date
USCG Accepted AMS 53 BWMS by 47 Manufacturers
Aquarius-EC EcoBallast NiBallast
Aquarius-UV Ecochlor NK-O3 BlueBallast
AquaStar (inc. Ex models) ECOMARINE Ocean Protection System
ARA PLASMA Electro-Cleen OceanDoctor
BalClor ERMA FIRST OceanGuard
BallastMaster UltraV FineBallast MF OceanSaver MKII
BALPURE GloEn-Patrol Optimarin (inc. Ex models)
Bawat HiBallast (inc. Ex models) OxyClean
BIO-SEA Hyde GUARDIAN PACT Marine BWTS
BioViolet HY-BWMS PureBallast
Blue Ocean Shield JFE BallastAce (Models 250 to 2500, 2.0/2.0Ex, & 3.0)
BSKY (using NEO-CHLOR MARINE Purimar
Cathelco and TG Ballastcleaner) RayClean
CleanBallast KBAL SeaCURE
Coldharbour GLD BWTS MICROFADE Seascape
CrystalBallast Miura BWMS Smart Ballast
Cyeco BWMS MMC BWMS Trojan Marinex
NEI VOS YP-BWMS
As of 22 January 2016
19
Approved BWMS Statistics
All Type
USCG
Category Approved
AMS
BWMS
No. of BWMS 56* 52
No. of BWMS requiring treatment during intake and
50 49
de-ballasting
No. of BWMS using active substances 26 22
No. of BWMS requiring storage of chemicals 22 20
No. of BWMS requiring storage of waste products 1 0
Maximum Capacity (m3/h)* 16,200 16,200
As of 22 January 2016
20
Disinfection Technologies
25
20
15
10
As of 22 January 2016
21
California Amended Requirements
California Assembly Bill 1312
amending the Marine Invasive
Species Act
Interim ballast water performance
standards - implementation delayed:
Newly built vessels (constructed on
or after 1 January 2020) first
arrival in a CA port
Existing vessels First drydocking
on or after 1 January 2020
Escherichia coli Less than 126 cfu (colony forming units) per 100 ml
Intestinal enterococci Less than 33 cfu per 100 ml
Toxicogenic Vibrio cholera Less than 1 cfu per 100 ml OR
(human cholera) Less than 1 cfu per gram of wet weight biological
material
23
U.S. VGP Court Ruling
24
Final Points
25
BWMS Technology Evaluation
26
Recent ABS Environmental Publications
27