The document summarizes the fabrication and installation of steel trusses and other structural elements for a building roof over multiple dates. It details the production of 8 sets of steel trusses covering 196.64 square meters over 11 days on the right side, and 2 sets of trusses covering 49.16 square meters over 6 days on the left side. It also outlines the laying of purlins, fabrication of additional trusses, girder/columns, and installation of materials like angle bars, purlins, and bracing over various dates by skilled workers and laborers.
The document summarizes the fabrication and installation of steel trusses and other structural elements for a building roof over multiple dates. It details the production of 8 sets of steel trusses covering 196.64 square meters over 11 days on the right side, and 2 sets of trusses covering 49.16 square meters over 6 days on the left side. It also outlines the laying of purlins, fabrication of additional trusses, girder/columns, and installation of materials like angle bars, purlins, and bracing over various dates by skilled workers and laborers.
The document summarizes the fabrication and installation of steel trusses and other structural elements for a building roof over multiple dates. It details the production of 8 sets of steel trusses covering 196.64 square meters over 11 days on the right side, and 2 sets of trusses covering 49.16 square meters over 6 days on the left side. It also outlines the laying of purlins, fabrication of additional trusses, girder/columns, and installation of materials like angle bars, purlins, and bracing over various dates by skilled workers and laborers.
fabrication of steel truss(8 sets) @ floor level fabrication of trusses (2 sets) @ top of beam tatal area of 8 trusses=196.64sq/msq.m total area of 2 trusses =49.16sq.m(double) output output 5mp 196.64 sq/m for 11 days 3mp 49.16 sq/m for 6 days 5mp 17.87sq/m per day 3mp 8.19sq/m per day 1mp 3.57q/m per day 1mp 2.73sq/m per day laying of purlins and settings of trusses total area of roof 320.1sq.m (9.7 x 33m) computation skilled labor 16-Feb 3 2 2 1/2 x 2 1/2 angle bar 18-Feb 6 6 2 x 2 x 1/4 angle bar 19-Feb 6 5 20-Feb 7 2 21-Feb 4 1 1 1/2 x 1 1 /2 angle bar 22-Feb 6 1 23-Feb 6 3 summary 25-Feb 3 2 128 pcs 2 1/2 x 2 1/2 26-Mar 3 1 250 pcs 2 x 2 x 1/4 27-Mar 3 1 65 pcs 1 1/2 x 1 1/2 28-Mar 2 1 49 25 ave mp /day 4.454545 2.272727 output 7mp 320sq/m for 11 days 7mp 29sq/m per day 1mp 4.14sq.m per day materials used 45 pcs c purlins 2 x 6 x1.5 x12m 64 pcs 2 1/2 x 2 1/2 x 1/4 angle bar 72 pcs 2 x 2 x 1/4 angle bar 15 pcs tension rod 12mm 20 pcs 16mm cross bracing 20 pcs turn buckle 16mm s (2 sets) @ top of beam fabrication of trusses(2 sets) es =49.16sq.m(double) total area of 2 trusses=49.16sq/m 0utput m for 6 days 5mp 49.16sq/m for 3 days 5mp 16.38sq/m per day 1mp 3.27sq/m per day laying of purlins area(10.4 x 12m)=124.8m computation skilled labor 16 pcs 8 128 top & bottom 8-Feb fri 2 16 pcs 9 144 bracing 9-Feb sat 2 1.5 pcs 4 6 cleats 11-Feb mon 2 6 pcs 12 72 floor framing 2mp 124.8sq/m for 3 days 5 pcs 12 60 floor framing 2mp 41.6 sq/m per day 1mp 20.8sq.m per day 2mp 16pcs 2x6x12m or 32pcs 2x6x6m c purlins for 3days 2 1/2 x 2 1/2 angle bar 2 x 2 x 1/4 angle bar 1 1/2 x 1 1/2 angle bar fabrication of trusses(2SETS) WR 3 total area of 2 trusses=49.16sq.m output 5mp 49.16sq.m for 3days fabrication of girder/column basilio girder area=0.3x6m(5sets) 18sq/m 9-Mar 3 0.5 days column area=0.3x2.3m(4sets) 5.52sq/m 11-Mar 1 1 4.8sq/m 12-Mar 28.32 sq/m 13-Mar 1 1 output 14-Mar 4 1 2 mp 23.52sq/m for 11 days 15-Mar 4 1 2 mp 2.13sq/m per day 16-Mar 4 1 1 mp 1.065sq/m per day 17 5.5 2 mp 5.5 3mp 28.32 sq/m 3mp 5.14 sq/m 1mp 1.7 sq/m