The document outlines the deliverables for a pipeline project and includes engineering design reports, material take-off sheets, procedures for pre-commissioning and start-up, and a cost estimate for the materials and construction of the pipelines with an accuracy of +/- 20%.
Original Description:
This is the designated list of things to be done for the pipeline.
The document outlines the deliverables for a pipeline project and includes engineering design reports, material take-off sheets, procedures for pre-commissioning and start-up, and a cost estimate for the materials and construction of the pipelines with an accuracy of +/- 20%.
The document outlines the deliverables for a pipeline project and includes engineering design reports, material take-off sheets, procedures for pre-commissioning and start-up, and a cost estimate for the materials and construction of the pipelines with an accuracy of +/- 20%.
Wall thickness and material grade selection report Pipeline pre commissioning, commissioning and start up procedures (Specification) Type and quality of pigs for pre-commissioning
MTO FOR ANTICORROSION COATING MTO FOR FIELD JOINT COATING MTO FOR CONCRETE WEIGHT COATING MTO FOR PIPELINE FLANGES MTO FOR PIPELINE VALVES MTO FOR ISOLATION JOINT MTO FOR HOT INDUCTION BENDS MTO for CASING PIPES BULK MTO FOR PIPE AND FITTINGS BULK MTO FOR CONCRETE BULK MTO FOR STEEL BULK MTO FOR ANCHOR BOLTS ANODE QUANTITY FOR CP SYSTEM TYPES AND QTY OF PIGS FOR PRECOMMISSIONING