REDESIGN OF PILE CAP PIER 098 Page 1/2

Project: Motorway M6 (BANG PA IN TO NAKHON RATCHASIMA)


Date: Revision: 1
Designer: Check: Approve:

Proposed Depth and Reinforcement for Footing Pier 098

New Pile Location of Pile Cap for Pier 098

Calculation of Reinforcement Using Strut-and-Tie Model (STM) as per AASHTO LRFD

H= 2.8 m (Footing Depth)


Zeta = 26.96

Ru= 1440 T

Tu= 2831.492 T
Provide 2DB32@0.12 (Thus Provide 2-Bundle DB32@0.12 Each Direction)
0.75Tn= 2889.375 T