Professional Documents
Culture Documents
Geotechnical Drilling Report: Drilling Recovery Material Description
Geotechnical Drilling Report: Drilling Recovery Material Description
Geotechnical Drilling Report: Drilling Recovery Material Description
Core lentgh
Recovery
Length
From
From
Date
To
To
Litholo
Persentase
Claystone Sandstone Jumlah
137.6 32.05 169.65
81.10816 18.89184
PROJECT :
METHOD
BORE HOLE NO. :
COORDINATE
SHEET : ______OF______
(9) (10) (11) (12) (13) (14)
MATERIAL DESCRIPTION STRENGTH RQD
Tot>=10cm
From
RQD
UCS
To
Lithology
Y: LOGGED BY :
Water Level
Weathering
Frequency
Roughness
Gouge (infill)
Sample Code
Spacing
From
To
(cm) (m) (m) (m)
- - - - - 10 10.50 GT-BKS-01-01
9 S N - 25 25.50 GT-BKS-01-04
3 SR N - 35 35.50 GT-BKS-01-06
1 SR N - 65 65.50 GT-BKS-01-15
3 SR N - 70 70.5 GT-BKS-01-16
80 80.50 GT-BKS-01-18
13 VR SR UW
8 SR N - 85 85.50 GT-BKS-01-19
90 90.50 GT-BKS-01-20
1 R N -
3 SR N - 96 96.5 GT-BKS-01-21
4 S N - 100.5 101 GT-BKS-01-22
3 R N -
137.5 138 GT-BKS-01-34
9 SR N -
140.8 141.35 GT-BKS-01-35
(24)
GEOTECHNICAL DRILLING REPORT
Company name and symbol:
Core lentgh
Recovery
Length
From
From
Date
To
To
Lithology
BH 02 COORDINATE X:
Y:
SHEET : ______OF______ Z: Meter
(9) (10) (11) (12) (13) (14) (15) (16)
TERIAL DESCRIPTION STRENGTH RQD DISCONTINUITY INFORMA
Tot>=10cm
Frequency
Spacing
From
RQD
UCS
To
Lithology
START : FINISH :
LOGGED BY :
Water Level
Weathering
Roughness
Gouge (infill)
Sample Code
Lab. Test
From
To
(m) (m) (m)
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
R N UW
10 10.50
15 15.50
20.5 21.00 DRILLING
From
Date
30.5 31.00
35 35.50 (m)
40.5 41.00 10/3/2011 0
45.5 46.00 11/3/2011 2.75
50 50.50 8.25
55.5 56.00 10
57 57.50 11/3/2011 11
57.5 58.00 14
59 59.50 11/3/2011 15
60.5 61.00 16
65 65.50 11/3/2011 17
70 70.50 11/3/2011 19
75.5 76.00 12/3/2011 20
80 80.50 12/3/2011 21
85 85.50 24
90 90.50 25
96 96.50 12/3/2011 26
100.5 101.00 27
105 105.50 12/3/2011 28.4
108 108.50 29
109.35 109.85 30
109.85 110.35 31
111.35 111.85 32.5
112.85 113.35 34
115 115.50 35
120 120.50 36
125 125.50 40
130 130.50 41
135 135.50 42.6
137.5 138.35 44.1
140.8 141.30 45
145.3 145.80 46
150 150.50 49
155.5 156.00 50
160.5 161.00 51
165.5 166.00 54
170 170.50 55
175.5 176.00 55.85
57.35
59
60.35
61
64
65
66
67.5
69
70
71
72.5
74
75
76
80
81
82.5
84
85
85.85
87.35
88.85
90
90.55
91
93
94.5
95.35
96
97.5
100
101
102.5
107.1
108.35
109.85
111.35
112.45
113.85
115
116
117.2
120
120.3
121
125
126
130
131
134.5
135
136
137.5
139
140
141
142.5
144
145
145.85
148.85
150
151.5
154
155
156
159
160
161
163
165
166
167.5
169
171
174
175
176
179
DRILLING RECOVERY
Core lentgh
Recovery
Length
Lithology
To