APM30 Installation: Quick Guide

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

Security Level:

47pt

APM30 installation

Quick guide

www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


APM30 inner equipments
when Mini-link
PSU 1U empty

PSU caver
PMU

1u

2u Inner power plate


standby BBU

1U
Active BBU
1U
1U
DDF or E1
1U 1U empty, for Mini-link cool
DC-BOX
1U
Mini-link1 1U
Mini-link2 1U
1U empty

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 2

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


cable hole RRU power 3

RRU power 2

RRU power 1

RRU fiber 3
Battery cable
RRU fiber 2
Battery cable
APM power RRU fiber 1
Door alarm
grounding E1
temperature
Mini-link

RRU power 3

RRU power 2
RRU fiber 3

APM power RRU fiber 2 RRU power 1

grounding RRU fiber 1

E1

Mini-link

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 3

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step1: installing PGND
cables of APM30

Connecting the grounding


cable

Connecting the PGND


cable to outdoor
grounding bar

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 4

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step2: install PMU and PSU

Note: the DIP switch should


be set before installing

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 3:Installing the Door Status Sensor
Cable

Door status alarm

This
1
hole

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 6

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 4: Installing the temperature sensor cable
of battery

Temperature
sensor

1 This
hole

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 5: take off the cover for inner Battery

Take it off

OK

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 8

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 6: installing battery cable

_ +

+
_

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 7a: 2 BBUs wires of active BBU

Configuration 1(E1 cable<5m): 2BBU

Standby BBU
BBU power and
alarm cable
Inter BBU cable
BBU POWER
Active BBU Big
hole
grounding
E1 cable

Active standby

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 7b: 2BBUs+E1 lighting arrester kit
Configuration 2 (E1 cable>5m):
2BBUs+EI lightning arrester kit grounding

standby BBU

Active BBU

E1 cable

E1 lightning arrester kit

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 7c: 2BBUs+ DDF+ DC BOX+ Mini link
Configuration 3: 2BBUs+ DDF+ DC
BBU power
BOX+ Mini link cable
Standby BBU

Mini-link E1 Active BBU


-48V/ 50A to
FFD DC-BOX
E1
DC-BOX to
DC-BOX Mini-link

Mini-link IF Mini-link

Mini-link E1
BBU E1

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 8: RRU power cables
Cable
grounding
RRU power cables
Standby BBU

Active BBU

RRU power
cable

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 9: RRU fiber
RRU fiber
Standby BBU

Active BBU

RRU fiber

Fiber tail

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 14

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 10 : installing
input power
Standby BBU

Active BBU

D. AC Power
and
grounding
E1
and
DC

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 11 : waterproof

Standby BBU

Active BBU

waterproof

waterproof

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 16

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Step 12 :
installing Battery

Standby BBU

Active BBU

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 17

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com


Thank you
www.huawei.com

PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com

You might also like