Professional Documents
Culture Documents
APM30 Installation: Quick Guide
APM30 Installation: Quick Guide
APM30 Installation: Quick Guide
47pt
APM30 installation
Quick guide
www.huawei.com
PSU caver
PMU
1u
1U
Active BBU
1U
1U
DDF or E1
1U 1U empty, for Mini-link cool
DC-BOX
1U
Mini-link1 1U
Mini-link2 1U
1U empty
RRU power 2
RRU power 1
RRU fiber 3
Battery cable
RRU fiber 2
Battery cable
APM power RRU fiber 1
Door alarm
grounding E1
temperature
Mini-link
RRU power 3
RRU power 2
RRU fiber 3
E1
Mini-link
This
1
hole
Temperature
sensor
1 This
hole
Take it off
OK
_ +
+
_
Standby BBU
BBU power and
alarm cable
Inter BBU cable
BBU POWER
Active BBU Big
hole
grounding
E1 cable
Active standby
standby BBU
Active BBU
E1 cable
Mini-link IF Mini-link
Mini-link E1
BBU E1
Active BBU
RRU power
cable
Active BBU
RRU fiber
Fiber tail
Active BBU
D. AC Power
and
grounding
E1
and
DC
Standby BBU
Active BBU
waterproof
waterproof
Standby BBU
Active BBU