Professional Documents
Culture Documents
Bamboo Pile Matrass
Bamboo Pile Matrass
Bamboo Pile Matrass
Limited Height
GEOTEXTILE
Common Solutions for Embankment on Soft Soils (Leroueil, et. al., 1990)
29 Mei 2017 1
Prof Dr Masyhur Irsyam ITB-HATTI
CPV
Settlement Plate
References
Piezometer
Inclinometer
Multidepth
General
Activities
MENARD
For
- Embankment with limited height
- Embankment for rural road
- Embankment in remote area
Menard
Content:
1. Introduction
29 Mei 2017 2
Prof Dr Masyhur Irsyam ITB-HATTI
Critical hc
height
Soft Soil
Stability of Embankment With Bamboo Mattress Stability of Embankment With Bamboo Pile- Mattress
Consolidartion Settlement
6.00 m 6.00 m
Durability?
0.75 m 1.5 1.5 0.75 m 1.5 1.5
1 1 1 1
2.50 m 2.50 m
1 1
Bamboo is durable
4 4
29 Mei 2017 3
Prof Dr Masyhur Irsyam ITB-HATTI
2. Main Functions of Elements in the Bamboo Pile-Mattress System for Very Soft-Soft Clay
Soil Improvement N-SPT = 0-1
25 m qc = 1-2 kg/cm2
3. Previous Experiences Using Bamboo Pile-Mattress System C = 0.65 t/m2
Laboratorium Geoteknik
Pusat Penelitian Antar Universitas, PPAU
Institut Teknologi Bandung
29 Mei 2017 4
Prof Dr Masyhur Irsyam ITB-HATTI
C E
B
A
29 Mei 2017 5
Prof Dr Masyhur Irsyam ITB-HATTI
Prefabricated
Segmental Raft
Quarry run/
Seabed kerikil/sand bags Seabed
Cerucuk Bamboo
Spasi = 1 m, L = 6 m
Sekitar Dermaga
Filter: W50 = 37 Kg 2% 2%
27 - 33 cm
Pasir
Seabed Quarry run/ 1:1 Sea bed
kerikil/sand bags
1. Introduction
29 Mei 2017 6
Prof Dr Masyhur Irsyam ITB-HATTI
29 Mei 2017 7
Prof Dr Masyhur Irsyam ITB-HATTI
Untuk 3 lapis
29 Mei 2017 8
Prof Dr Masyhur Irsyam ITB-HATTI
Untuk 5 lapis
29 Mei 2017 9
Prof Dr Masyhur Irsyam ITB-HATTI
29 Mei 2017 10
Prof Dr Masyhur Irsyam ITB-HATTI
29 Mei 2017 11
Prof Dr Masyhur Irsyam ITB-HATTI
CT 1 SUPPORTI
NG
AREA
CT : Container Terminal
PT : Product Terminal
Reklamasi:
Sebagian besar area yang
tersedia untuk reklamasi berada
di atas tanah lunak complicated
design (matras bambu untuk
pondasi revetment);
Permasalahan ketersediaan
pasir untuk material reklamasi;
FERIALDY NOERLAN
Seminar HATTI, Desember 2012
Panjang daerah yang diperkuat dng cerucuk matras bambu > 5.o km
Jumlah matras > 360 ribu
FERIALDY NOERLAN
Seminar HATTI, Desember 2012
29 Mei 2017 12
Prof Dr Masyhur Irsyam ITB-HATTI
Pemancangan:
Peningkatan besaran beban peningkatan besaran increasing size of piles
(dia.800 -1.000 mm) increasing size of piling equipment;
Jadwal yang ketat pemilihan struktur deck on pile untuk struktur lapangan
penumpukan;
POTONGAN A-A
TAMBANG PLASTIK 25 mm
POTONGAN B-B
29 Mei 2017 13
Prof Dr Masyhur Irsyam ITB-HATTI
PT. PP (Persero)
PT. PP (Persero)
Alat pancang cerucuk cluster bambu dipatenkan oleh PT. PP PT. PP (Persero)
29 Mei 2017 14
Prof Dr Masyhur Irsyam ITB-HATTI
PT. PP (Persero)
29 Mei 2017 15
Prof Dr Masyhur Irsyam ITB-HATTI
PT. PP (Persero)
Abidin, 2010
Abidin, 2010
Sumber :
PPT The NCICD Project: Short Term Measures (Sawarendro, Dedi Waryono, Bastien van Veen)
29 Mei 2017 16
Prof Dr Masyhur Irsyam ITB-HATTI
98
Content:
1. Introduction
How to calculate? Coceptually, it is similar with pile-raft system for high rise buildings
2-Dimention
3-Dimention
Firmansyah, 2013
29 Mei 2017 17
Prof Dr Masyhur Irsyam ITB-HATTI
FEM Modelling
Embankment soil
Beam Beam
Node-to-Node Spring
Beam Element
EI = E x Imatras
1.0 m Imatras = Ibambu + (Ar2)
0.3m I =
D o4 D i4
64
L=10 m
1.0 m 1.0 m
= 7 to 10 cm
Luas Penampang:
Ap = 0.024 m2
Luas Selimut:
As = 0.785 m
29 Mei 2017 18
Prof Dr Masyhur Irsyam ITB-HATTI
0m
cu = 1 t/m2 30
fs = cu = 1 x 1 t/m2 = 1 t/m2
1m
cu = 2 t/m2
fs = cu = 1 x 2 t/m2 = 2 t/m2
Pult = As.fs + Ap.qp = 7.5ton
k (konstanta pegas): Fmax/d = 30/0.03 = 1000 kN/m
Fmax = Pult/SF = 7.5/2.5 = 3 ton = 30 kN
1.0 m
L=10 m
1.0 m
1.0 m 1.0 m
= 7 to 10 cm
29 Mei 2017 19
Prof Dr Masyhur Irsyam ITB-HATTI
Penggelaran
Geotextile Separator
Pembuatan Matras bambu
Penghamparan
Material timbunan
Hasil akhir timbunann di atas tanah lunak dengan perkuatan cerucuk mattras bambu
29 Mei 2017 20
Prof Dr Masyhur Irsyam ITB-HATTI Geotextile
250
100
A
600
600
B
C Geotextile
250
100
500
A
B
600
600
B
500
C
PEMASANGAN PIEZOMETER
SKALA 1 : 100
500
B
500
TOTAL PENURUNANKONSOLIDASI PADA TIAP-TIAP POSISI Grafik Penurunan-Waktu pada Settlement Plate 4
SETTLEMENT PLATE
Tinggi Timbunan (m)
4
konstruksi
3
1
14,90
13.90 cm cm
0
16,00
17.20 cm
0 20 40 60 80 100 120
1 1
15.60
15.60 cm
0
2 2 17.50
17.50 cm 10
3 3 15,90
15.90 cm cm
20
4
4 17.50
17.50 cm
5
5
Penurunan (cm)
15.50
15.50 cm
30
6
6 40
50.00 m
50.0 m
7 7
50
16.00 m
16.0 m
60
70
0 20 40 60 80 100 120
Hari Pengamatan
29 Mei 2017 21
Prof Dr Masyhur Irsyam ITB-HATTI
4
konstruksi
3
0
0 20 40 60 80 100 120
10
Elastic settlement = 48 cm 5
Elastic settlement Consolidation settlement = 17 cm 14
20
18
78 Cerucuk dimodelkan sebagai Pegas
85
Penurunan (cm)
30
104
Consolidation settlement
40
Elastic settlement
50
Consolidation settlement
60
Elastic settlement
Consolidation settlement
70
0 20 40 60 80 100 120 Elastic settlement embankment Tahap-1 20 cm
Hari Pengamatan
29 Mei 2017 22
Prof Dr Masyhur Irsyam ITB-HATTI
10
20
30
Settlement (cm)
40
50
60
30.
70
80
90
100
Embankment 3, Consolidation settlement until finish 1,07 mTota 0 20 40 60 80 100 120 140 160 180 200
Elastic Deformation 20
30
Settlement (cm)
40
50
60
30.
70
80
90
100
0 20 40 60 80 100 120 140 160 180 200
Consolidation Settlement
Consolidartion Settlement
6.00 m 6.00 m
2.50 m 2.50 m
4
Tawang, Semarang
29 Mei 2017 23
Prof Dr Masyhur Irsyam ITB-HATTI
Conclusions
29 Mei 2017 24