Ms GEOSCIENCE TESTING LABORATORY
METHOD STATEMENT
FOR
TRIAL PITS EXCAVATION AND BACKFILLING
[Design & Build External Roads Connection for
| Project Name: | Jabel Hafeet & Ain Al Faydah Developments in Al Ain-
UAE
M/s. MUSANADA
M/s, Dorsch Gruppe
Al Fahjan Transport & General Cont .EST.
For Geoscience Testing Laboratory
screnparsre0ezico8 sue No. Ot
Page Lots issoe OL 11022017 ey Dt
Rote enete
Sharjah A
a
COREY
otTABLE OF CONTENT
Sections
1.0 Introduction
2.0 Equipment
3.0 Procedure
4.0 Work Force
5.0 Environmental , Safety & Health
6.0 Quality Assurance
Plot No 6:16
rusatian na Acca
Tol 02550 7885
Fax: 02 5507855
cruoxms/2017/008 'ssue No.0 Fev.No.:0
Page Lot Issue ot :11.022017 fev. Bt1.0
2.0
24
INTRODUCTION
‘The following test method outlines a procedure for Trial Pits Excavation and backfling
EQUIPMENT
Hand shovel & axe.
Operatives
‘Two men crew
2.2 Supervision
Works will be overseen by Consultant and the other by the Client if required.
3.0 PROCEDURE
Page acts (sue Oe 01 2017
Trial Pits are to be excavated by Contractor to required depths by a Hand Excavation
and will typically be 1.5m wide and approximately 1.5m long.
Existing grassland vegetation needs to be cut and removed in the form of turves, and
topsoil will be removed and kept away.
Excavated soil shall be stacked at a suitable distance from the pit to ensure that the
surface load does not endanger the stability of the pit sides.
‘Samples will be taken from the pit with photographs showing location and project details
{or testing and logging purposes where itis considered safe to do so.
‘Supervision of the pit during excavation will be done.
In areas where utilities are expected, scanning will be done using Cable Detector before
& after excavation of trial pit to ensure that no underground utilities exist at the point of
inspection,
Extreme caution will be taken with all aspects of excavation, logging, sampling and
photographing the trial pit operations. Required testing will be undertaken in specified
pits according to the specification.
The pit will remain open only for the duration of excavation, to the scheduled depth or
shallower and to obtain descriptions of the strata and collect representative samples.
Backfiling will be carried out immediately after above exercise and Engineer's
instructions.
All sub-soil excavated will be re-placed followed by top soil
On completion, the pit and surrounding area will be left in a condition that is acceptable
to the Engineer and the client
RSI
1us/2017 7008 fue Wo. :02 [ferns OF4.0 Work Force
A team of suitably trained and experienced personnel have been allocated to the project in
order to perform investigations.
KEY PERSONNEL
Geo science
Testing laboratory | “@>oratory Manager Mr. Elyas Muhammad Sha
Technical Manager Engr. Ali Halabi
Geotechnical Engineer Engr. Sheril Chandrabose
Operation Manager Mr. Akram Al Hariri
HSE Officer Mr. Arlan
Helpers
5.0 ENVIRONMENTAL, SAFETY AND HEALTH
GTL is firmly committed to full compliance with all industry standards and local law as may be
applicable.
It is duty and responsibility of Chief Executive Officer in coordination with the HSE Manager to
implement these policies fully within the Company organization and its operations.
6.0 QUALITY ASSURANCE,
Geoscience laboratory is wholly committed to the operation of a management system, with the
full cooperation of adequately trained staff which satisfies the requirements of (SO 9001: 2000.
The system and policy are regularly reviewed by the Managing Director of each operating
company to ensure their ongoing effectiveness and efficiency in meeting the company
objectives. It is also regularly reviewed to ensure our systems and policy continues to meet the
current needs and expectations of our clients.
The Quality Assurance Manager has the authority and is responsibfe for implementing,
managing and maintaining the Quality Policy Manual and Operation Procedures. He also has
the authority and organizational freedom to identify and investigate problems affecting the
quality of the product, services and Documented Management System.
GT voKNs/2017/008 lowe a 02
Paget sve ot 22012809oyu
Musanada
)J dorsch Gruppe
DC Abu Dhabi
Project : Design & Build External Roads Connection for Jabel Hafeet & Ain Al Faydah
Developments in Al Ain.
Investigation Report
for Cutout and Asphalt Core
1. Introduction
This Document outlines the requirements to
)
ii)
ii)
Obtain Samples
Testing
Reporting test Results
2. Investigation Scope
The scope of the Investigation includes :
i)
ii)
i)
vy)
vi)
vil)
viii
ix)
3. Safety
Secure permission from Authorities, (inc. Traffic Police) to obtain cores and cut out
samples from selected location of the road under study.
Make all necessary arrangements for the complete testing service (including but not
limited to workspace lighting worker welfare, traffic management, temporary coning
& signing, safety measures ete.)
Drill the cores from existing roads at selected location as per Marked in drawing
Assign identification number for each core.
Obtain material from each cut out location and up to the depth of sub-grade.
Materials shall be collected and identified separately for each layer.
Reinstate the disturbed area (core and cut out locations)
Carry out the required tests on obtained sample.
Report the findings in Standard Format.
Coring/ Cut out sampling shall be carried out by closing one lane or partial at location shown on
attached, which shall also be agreed with the traffic police
Safety requirements at site shall be followed as per requirements of the traffic police
department. In general, sampling activities shall be in (but not be limited to) fast lane and slow
lane, Works shall be planned for off-peak traffic periods. In case any planned location are
sensitive, alternative location shall be agreed with the engineer and traffic police, Work shall beMusanada DC Abu Dhabi
‘ 2
6.5L D J vorsch Gruppe FE
undertaken efficiently with minimum occupation time of the highway from opening to full
reinstatements.
Traffic safety precautions shall be determined by risk assessment and agreed with traffic Police
(for example : Lane closure cones, mounted light arrow display with banks of flashing beacon
lights, flag man etc.)
Work safety precautions shall be undertaken appropriate to the task and equipment (as
determined by risk assessment and internally signed of by Contractors Safety Officer) :
Personnel Shall be equipped with proper PPE (High reflective Jackets, safety boots helmets etc) and.
shall Wear necessary PPE when on site. In case of non-compliance with safety rules the Engineer
reserves the right to ban offenders from working on the project sites. Sampling tools and
equipment shall be used and stored in a manner safe both for workers and the public pedestrians /
road users. Precautions shall be taken to limit dust and flying object hazard.
Requirements for Coring
100mm dia core shall be obtained only form the pre ~ selected (by the Engineer) locations of the
road under under study. For each core, the following information/data shall be recorded and
reported in the submittals.
i) Identification number
ii) Street Name
il) Section (1P to 1P)
iv) Lane, chainage, offset
v) Total Thickness of Asphaltic Pavement
vi) Thickness of each bituminous layer ie., base, binder and wearing course, if possible
Requirements for Cut outs
Cut out sample shall be obtained from pre-selected locations of the roads under investigation.
i) Sample of Existing Material shall be obtained from cut-out locations
ii) Each layer shall be identified.
iii) Samples of each layer shall be collected separately.
iv) Mixing of Material of different layers is not permitted.
v) Representative photos shall be taken with date and time at each location, with clearly visible
measuring scale,
vi) Required Test shall be carried out to provide the following properties of materials obtained
from each layer.
" Gradation/Classification
= Plasticity Index
CBR