I. Komatsu PC 300 HR 39
Operating weight : 37.400 kg (91,270 lb)
Flywheel HP : 232 HP / 173 kW 1750 RPM
Bucket Capacity : 1,2 m3
Performance :
Swing speed : 10.0 RPM
Max. travel speed : Hi 4.4 km/h
Mi 3.5 km/h
Lo 2.5 km/h
Dimensions :
Overall length : 10900 mm (359)
Overall height : 3365 mm (11)
Overall width : 3570 mm (119)
Length af track on ground : 4020 mm (132)
Track gauge : 2870 mm (9)
Tall swing radius : 3300 mm (116)
Ground clearance : 706 mm (110)
Engine : KOMATSU
Model : SA6D114E
Capacity :
Fuel tank : 540 ltr
Hydraulic oil tank : 205 ltr
Machine Spec :
Boom : 6500 mm
Arm : 3190 mm
Bucket (SAE) : 0.96 m3
53
II. Komatsu PC 400 :
Operating weight : 41.400 kg (91,270 lb)
Flywheel HP : 306 HP / 228 kW 1950 RPM
Bucket Capacity : 1,6 m3
Performance :
Swing speed : 9.3 RPM
Max. travel speed : Hi 5.5 km/h
Lo 3.4 km/h
Dimensions :
Overall length : 11835 (3810)
Overall height : 3635 (1111)
Overall width : 3430 (113)
Length af track on ground : 4020 (132)
Track gauge : 2740 (9)
Tall swing radius : 3500 (116)
Ground clearance : 555 (110)
Engine : KOMATSU
Model : SA6D125E
Capacity :
Fuel tank : 605 liter
Hydraulic oil tank : 270 ltr
Machine Spec :
Boom : 7060 mm
Arm : 3380 mm
Bucket (SAE) : 1.80 m3
54
LAMPIRAN B
SPESIFIKASI TEKNIS ALAT ANGKUT
55
LAMPIRAN C
WAKTU EDAR ALAT MUAT
Tabel C.1
Waktu Edar Alat Muat Komatsu PC 400
No A B C D CT
1 10,45 6,34 4,33 4,24 25,36
2 9,44 7,24 3,41 5,21 25,30
3 8,55 6,31 5,36 5,30 25,52
4 10,09 5,25 5,31 4,69 25,34
5 6,23 4,32 4,03 6,70 21,28
6 7,00 6,29 6,79 5,72 25,80
7 6,04 7,32 4,51 4,73 22,60
8 9,29 5,30 5,32 4,89 24,80
9 7,02 6,25 4,60 5,67 23,54
10 7,37 5,10 4,31 6,72 23,50
11 5,13 8,30 5,03 7,75 26,21
12 9,40 7,20 6,31 3,10 26,01
13 12,19 8,21 4,02 7,25 31,67
14 8,30 6,33 4,09 9,48 28,20
15 10,69 7,29 5,10 6,12 29,20
16 10,70 6,21 5,16 4,25 26,32
17 14,27 7,03 6,20 9,21 36,71
18 9,30 7,09 4,19 5,29 25,87
19 10,17 6,29 3,59 8,21 28,26
20 10,32 7,08 3,94 3,17 24,51
21 7,54 8,08 4,40 7,02 27,04
22 7,44 6,33 3,50 7,15 24,42
23 9,28 6,35 5,60 5,19 26,42
24 7,40 7,05 5,30 4,29 24,04
25 9,49 8,02 4,01 5,39 26,91
26 6,32 6,33 4,68 6,49 23,82
27 5,52 6,69 4,82 7,50 24,53
28 5,57 6,10 5,21 5,03 21,91
29 5,28 7,09 4,33 6,16 22,86
30 8,33 5,29 4,68 4,81 23,11
Jumlah 254,12 198,08 142,13 176,73 771,06
Rata-rata 8,47 6,60 4,74 5,89 25,70
Keterangan :
A. Waktu untuk mengisi mangkuk
B. Waktu untuk berputar (Bermuatan)
C. Waktu untuk menumpahkan muatan
D. Waktu untuk kembali berputar (kosong)
CT. Cyle Time (detik)
56
Tabel C.2
Waktu Edar Alat Muat Komatsu PC 300 HR 39
No A B C D CT
1 11,24 6,02 5,44 5,79 28,49
2 9,85 4,64 4,68 4,50 23,67
3 8,96 5,01 4,55 4,09 22,61
4 10,96 4,52 4,11 5,09 24,68
5 12,47 4,34 4,23 4,14 25,18
6 11,07 4,47 5,53 4,50 25,57
7 13,14 4,36 4,90 4,74 27,14
8 12,24 5,10 5,84 4,60 27,78
9 9,49 5,71 4,74 5,48 25,42
10 9,55 6,09 4,38 5,87 25,89
11 9,51 5,38 5,27 6,27 26,43
12 10,21 6,42 4,09 5,44 26,16
13 8,13 5,20 4,28 4,44 22,05
14 9,49 5,82 4,11 4,67 24,09
15 7,17 6,91 4,18 4,74 23,00
16 8,78 7,82 6,47 5,73 28,80
17 10,34 4,80 5,14 4,21 24,49
18 9,57 4,50 4,67 5,64 24,38
19 7,15 4,17 9,74 5,17 26,23
20 7,20 5,44 5,67 4,00 22,31
21 9,03 5,17 7,24 4,60 26,04
22 9,40 5,35 5,63 4,74 25,12
23 10,57 5,98 5,45 4,65 26,65
24 8,86 5,04 6,53 4,74 25,17
25 9,75 5,17 6,05 5,60 26,57
26 10,82 5,25 5,85 5,05 26,97
27 12,31 5,38 7,00 4,46 29,15
28 7,58 5,06 6,87 4,75 24,26
29 8,54 5,67 5,80 4,06 24,07
30 9,75 5,24 5,78 5,27 26,04
Jumlah 293,13 160,03 164,22 147,03 764,41
Rata-rata 9,77 5,33 5,47 4,90 25,48
Keterangan :
E. Waktu untuk mengisi mangkuk
F. Waktu untuk berputar (Bermuatan)
G. Waktu untuk menumpahkan muatan
H. Waktu untuk kembali berputar (kosong)
CT. Cyle Time (detik)
LAMPIRAN D
57
WAKTU EDAR ALAT ANGKUT
Tabel D.1
Waktu Edar DT. Hino FM dengan Exc. Komatsu PC 400
No A B C D E F G CT
1 0:00:15 0:03:59 0:47:20 0:01:33 0:00:16 0:40:40 0:07:27 1:41:30
2 0:01:18 0:04:06 0:36:10 0:00:52 0:00:20 0:30:56 0:06:22 1:20:04
3 0:00:27 0:04:18 1:22:21 0:00:54 0:00:15 1:04:47 0:11:32 2:44:34
4 0:00:53 0:04:32 1:29:07 0:01:24 0:00:21 1:15:46 0:05:02 2:57:05
5 0:00:35 0:04:44 0:52:21 0:00:28 0:00:16 0:39:58 0:05:57 1:44:19
6 0:00:23 0:03:45 0:52:44 0:01:26 0:00:18 0:41:22 0:08:29 1:48:27
7 0:00:59 0:03:26 0:45:21 0:00:43 0:00:19 0:37:45 0:13:52 1:42:25
8 0:00:29 0:04:21 0:44:56 0:01:21 0:00:16 0:34:14 0:14:30 1:40:07
9 0:01:17 0:04:36 0:52:46 0:00:29 0:00:17 0:44:41 0:00:00 1:44:06
10 0:01:16 0:04:02 0:55:31 0:00:41 0:00:15 0:42:59 0:03:39 1:48:23
11 0:00:38 0:03:58 0:50:16 0:00:20 0:00:20 0:39:15 0:01:05 1:35:52
12 0:00:30 0:03:59 0:53:31 0:00:59 0:00:15 0:42:36 0:01:15 1:43:05
13 0:00:28 0:03:44 0:56:19 0:01:32 0:00:17 0:42:19 0:02:02 1:46:41
14 0:00:47 0:04:55 0:55:01 0:00:48 0:00:19 0:40:24 0:05:07 1:47:21
15 0:00:30 0:03:49 1:03:32 0:01:03 0:00:22 0:40:12 0:06:07 1:55:35
16 0:00:56 0:04:54 0:46:55 0:01:11 0:00:25 0:39:32 0:00:00 1:33:53
17 0:00:55 0:04:42 0:51:35 0:01:16 0:00:15 0:40:30 0:05:30 1:44:43
18 0:00:53 0:03:57 1:24:21 0:00:46 0:00:17 1:09:04 0:05:30 2:44:48
19 0:00:58 0:03:58 0:45:31 0:01:28 0:00:20 0:42:15 0:06:10 1:40:40
20 0:01:12 0:05:18 0:44:52 0:01:07 0:00:23 0:35:25 0:07:48 1:36:05
21 0:00:59 0:05:30 0:46:32 0:01:13 0:00:19 0:36:33 0:10:33 1:41:39
22 0:00:43 0:04:28 0:47:31 0:01:17 0:00:23 0:40:42 0:05:52 1:40:56
23 0:00:29 0:03:49 0:52:31 0:01:31 0:00:17 0:37:42 0:09:34 1:45:53
24 0:00:37 0:04:25 1:21:06 0:00:12 0:00:15 0:50:04 0:07:56 2:24:35
25 0:00:40 0:05:15 0:45:30 0:01:16 0:00:19 0:27:18 0:09:48 1:30:06
26 0:00:24 0:05:26 1:15:03 0:00:12 0:00:21 0:55:39 0:01:35 2:18:40
27 0:00:28 0:04:07 0:46:40 0:01:08 0:00:18 0:37:50 0:06:04 1:36:35
28 0:01:15 0:04:08 0:58:29 0:01:09 0:00:16 0:47:33 0:00:20 1:53:10
29 0:01:57 0:04:34 0:43:25 0:00:39 0:00:20 0:34:53 0:04:07 1:29:55
30 0:00:35 0:03:58 0:41:21 0:01:22 0:00:16 0:31:04 0:05:38 1:24:14
Jumlah 0:23:46 2:10:43 27:28:38 0:30:20 0:09:10 21:23:58 2:58:51 55:05:26
Rata-rata 0:00:48 0:04:21 0:54:57 0:01:01 0:00:18 0:42:48 0:05:58 1:50:11
Tabel D.2
Waktu Edar DT. Hino FM dengan Komatsu PC 300 HR 39 :
58
No A B C D E F G CT
59
1 0:01:17 0:05:26 1:15:03 0:00:12 0:00:21 0:55:37 0:01:35 2:19:31
2 0:01:16 0:03:58 0:50:21 0:00:20 0:00:20 0:39:15 0:01:05 1:36:35
3 0:00:38 0:03:59 0:53:31 0:00:59 0:00:15 0:42:36 0:01:15 1:43:13
4 0:00:30 0:03:44 0:56:19 0:01:32 0:00:18 0:42:19 0:02:07 1:46:49
5 0:00:28 0:04:55 0:55:01 0:00:48 0:00:19 0:40:24 0:05:07 1:47:02
6 0:00:16 0:03:49 1:03:32 0:01:03 0:00:16 0:40:12 0:06:07 1:55:15
7 0:01:18 0:03:49 0:52:31 0:01:35 0:00:17 0:37:42 0:09:34 1:46:46
8 0:00:27 0:04:25 1:21:06 0:00:12 0:00:15 0:57:04 0:08:56 2:32:25
9 0:00:56 0:05:15 0:45:30 0:01:19 0:00:19 0:27:18 0:09:58 1:30:35
10 0:00:35 0:03:54 0:46:21 0:01:32 0:00:15 0:39:40 0:08:27 1:40:44
11 0:00:24 0:04:06 0:36:10 0:00:52 0:00:20 0:30:54 0:10:22 1:23:08
12 0:00:59 0:04:18 1:21:21 0:00:54 0:00:15 1:04:47 0:11:32 2:44:06
13 0:00:29 0:04:32 1:29:07 0:01:24 0:00:20 1:15:46 0:05:02 2:56:40
14 0:00:47 0:04:55 0:52:21 0:00:18 0:00:16 0:39:58 0:06:57 1:45:32
15 0:00:23 0:04:28 0:48:31 0:01:17 0:00:23 0:40:42 0:05:52 1:41:36
16 0:00:37 0:04:54 0:46:55 0:01:14 0:00:25 0:34:32 0:00:00 1:28:37
17 0:00:40 0:04:42 0:51:35 0:01:16 0:00:15 0:40:30 0:05:30 1:44:28
18 0:00:24 0:04:07 0:46:30 0:01:08 0:00:18 0:37:50 0:06:04 1:36:21
19 0:00:28 0:04:08 0:58:29 0:01:04 0:00:16 0:49:33 0:00:20 1:54:18
20 0:01:10 0:04:34 0:43:14 0:00:49 0:00:20 0:34:53 0:04:07 1:29:07
21 0:01:57 0:03:56 0:41:21 0:01:20 0:00:17 0:32:04 0:06:38 1:27:33
22 0:00:37 0:03:45 0:52:44 0:01:26 0:00:18 0:41:22 0:08:29 1:48:41
23 0:00:30 0:03:26 0:45:21 0:00:43 0:00:19 0:37:49 0:13:52 1:42:00
24 0:00:56 0:04:21 0:44:56 0:01:21 0:00:19 0:34:14 0:14:30 1:40:37
25 0:00:55 0:04:36 0:52:46 0:00:29 0:00:18 0:44:41 0:00:00 1:43:45
26 0:00:48 0:04:02 0:55:31 0:00:41 0:00:15 0:44:59 0:03:37 1:49:53
27 0:00:58 0:03:57 1:24:21 0:00:46 0:00:17 1:12:04 0:05:30 2:47:53
28 0:01:04 0:03:58 0:50:31 0:01:20 0:00:20 0:42:15 0:08:10 1:47:38
29 0:00:59 0:05:13 0:44:52 0:01:07 0:00:23 0:36:05 0:07:48 1:36:27
30 0:00:43 0:03:30 0:46:39 0:01:13 0:00:19 0:36:33 0:10:31 1:39:28
JUmlah 0:23:29 2:08:42 27:32:30 0:30:14 0:09:08 21:33:38 3:09:02 55:26:43
Rata-rata 0:00:47 0:04:17 0:55:05 0:01:00 0:00:18 0:43:07 0:06:18 1:50:53
Keterangan :
A. Mengambil posisi untuk pemuatan
B. Pemuatan
C. Pengangkutan bermuatan
D. Mengambil posisi untuk penumpahan
E. Penumpahan
F. Kembali ke kuari (kosong)
G. Menunggu pemuatan
CT. Cycle Time (menit)
LAMPIRAN E
PENGGUNAAN METODE STATISTIK
60
Untuk mengetahui data jumlah pengamatan lapangan yang dianggap cukup
mewakili, maka dapat digunakan pengujian dengan Student Distribution. Rumus-
rumus yang digunakan adalah :
a. Simpangan Baku (S) :
k
S =
i 1
( mi x)2 . fi / M
Tabel E.1
Nilai-nilai t bagi distribusi t student untuk C = 90
M t M t M t M T M t
5 2,13 11 1,81 17 1,75 23 1,72 29 1,70
6 2,02 12 1,80 18 1,75 24 1,71 30 1,70
7 1,94 13 1,78 19 1,74 25 1,71 > 30 1,65
8 1,90 14 1,77 20 1,73 26 1,71
9 1,86 15 1,76 21 1,73 27 1,71
10 1,83 16 1,76 22 1,72 28 1,70
Dengan menggunakan data-data di lapangan, maka akan didapatkan angka Im
dan apabila Im < 1 berarti pengamatan yang dilakukan cukup terwakili. Berikut ini
diberikan contoh perhitungan data hasil pengamatan yang dilakukan terhadap
Excavator Komatsu PC 400 :
Diketahui :
k = 1 + 3,3 log M
61
= 1 + 3,3 log 30 = 5,87 6
i = d/k
= (36,71 21,28) / 6 = 2,57
Berdasarkan jumlah kelas dan interval klas didapatkan tabel pengolahan hasil
pengamatan sebagai berikut :
Tabel E.2
Metode Statistik Waktu Edar Excavator PC 400
Karena Im < Imr = 1,84 < 2,23, maka data pengamatan yang dilakukan sebanyak 30
kali dianggap sudah dapat terwakili.
Catatan :
Untuk waktu edar Excavator PC 300 HR39 serta dump truk yang melayani
Exavator PC 400, PC 300 HR39 dengan cara yang sama dan perhitungan yang sama
seperti diatas diperoleh rata-rata waktu edarnya sebagai berikut :
Excavator Komatsu PC 300 HR39 = 25,48
Dump Truk melayani PC 400 = 110,11 menit
Dump Truk melayani PC 300 HR39 = 110,53 menit
62
LAMPIRAN F
KESEDIAAN ALAT
63
mengetahui kesediaan dan penggunaan alat muat dan alat angkut digunakan jumlah
dari jam kerja, jam perawatan, jam tunggu dan jam kerja yang tersedia setiap bulan..
Tabel F.1
Data Kesediaan Alat *)
.
Alat Mekanis Jam kerja Jam rawat Jam tersedia Jam tunggu
Exc. PC 400 339,25 206,08 720 174,67
Exc. PC 300 HR 39 329,66 214,26 720 176,09
DT. Hino FM 9973,57 5465,76 21600 6160,67
*)
Sumber : Kontraktor PT. 17 Mei Mitrajaya, Kalimantan Selatan
Tabel F. 2
Angka Kesediaan Alat
Jk Jk Js PK Jk Jk
KM KF We
Jk Jr Jt Jk Js Jt
Alat Mekanis
Exc. PC 400 62,21 71,37 66,01 47,12
Exc. PC 300 HR 39 60,61 70,24 65,18 45,78
DT. Hino FM 64,59 74,69 61,81 46,17
Keterangan :
KM = Kesediaan Mekanik (%)
KF = Kesediaan Fisik (%)
PK = Pemakaian Kesediaan (%)
We = Penggunaan Efektif (%)
LAMPIRAN G
FAKTOR PENGISIAN MANGKUK
64
Vn
FF = x 100 %
Vt
Keterangan :
FF = Faktor pengisian mangkuk, %
Vn = Kapasitas nyata mangkuk, m3
Vt = Kapasitas teoritis (munjung) mangkuk, m3
Tabel G.1
Faktor pengisian mangkuk Exc. Komatsu PC 400
65
1,6 1,2 0,884 1,33 83%
1,6 1,0 0,884 1,13 71%
1,6 1,3 0,884 1,47 92%
1,6 1,3 0,884 1,47 92%
1,6 1,2 0,884 1,33 83%
1,6 1,2 0,884 1,36 85%
1,6 1,2 0,884 1,35 84%
1,6 1,1 0,884 1,29 81%
1,6 1,3 0,884 1,46 91%
1,6 1,3 0,884 1,41 88%
1,6 1,2 0,884 1,36 85%
Rata-rata Fill Factor 84%
Tabel G.2
Faktor pengisian mangkuk Exc. Komatsu PC 300 HR 39
66
1,2 0,9 0,884 1,01 84%
1,2 1,0 0,884 1,12 93%
1,2 1,0 0,884 1,13 94%
1,2 1,0 0,884 1,10 91%
1,2 0,9 0,884 1,05 88%
1,2 0,8 0,884 0,90 75%
1,2 0,9 0,884 1,04 87%
1,2 0,9 0,884 1,01 84%
1,2 0,9 0,884 1,03 86%
1,2 0,7 0,884 0,79 66%
1,2 0,8 0,884 0,90 75%
1,2 0,9 0,884 1,00 83%
1,2 1,0 0,884 1,09 90%
1,2 0,9 0,884 1,06 89%
1,2 0,9 0,884 0,98 82%
1,2 1,0 0,884 1,12 93%
1,2 0,9 0,884 1,04 87%
Rata-rata Fill Factor 85%
67
LAMPIRAN H
JUMLAH JAM KERJA DAN HARI KERJA
68
69
LAMPIRAN J
PENGARUH CURAH HUJAN TERHADAP
KEGIATAN PENAMBANGAN
Berdasarkan data curah hujan daerah Suatotatakan (Tabel I.1) diperoleh hari
hujan rata-rata tiap bulannya adalah 10 hari. Sehingga dalam perhitungan produksi
alat, hari hujan dijadikan sebagai faktor penentu dalam kelangsungan produksi
batubara, karena apabila terjadi hujan maka segala aktifitas panambangan akan
berhenti.
Secara teoritis
Secara teoritis 1 tahun hari kerja efektif adalah 306 hari diperoleh dari :
= 365 hari (dalam 1 tahun) 19 hari (hari libur) 40 hari (jumlah jam istirahat
Senin-Minggu)
= 306 hari
Hari kerja tersebut belum dipengaruhi berapa hari hujan yang turun dalam tiap
bulannya. Sehingga apabila hari hujan diperhitungkan, maka hari kerja efektif
sebanyak 306 hari akan berkurang.
Dengan faktor pengurangan yang menggunakan 365 hari (1 tahun), maka hari
kerja efektif sebanyak 245 hari telah memperhitungkan turunnya hujan secara
acak, bisa hari minggu, hari besar/libur, ataupun hari kerja itu sendiri.
70
LAMPIRAN K
TARGET PRODUKSI BATUBARA
Pada tahun 2002 PT. Antang Gunung Meratus mempunyai target produksi
batubara sebesar 360.000 ton/tahun.
Diperkirakan terjadi kehilangan pada saat penambangan yaitu penggalian,
pemuatan dan pengangkutan sebesar 5 %. Untuk mengganti kehilangan tersebut,
maka pada tahun 2002 ini PT. 17 Mei Mitrajaya sebagai kontraktor kegiatan
penambangan batubara harus dapat menghasilkan produksi batubara sebesar :
Dimisalkan batubara yang harus ditambang adalah A ton/tahun :
360.000 ton/tahun = (100-5) % x A
360.000 ton/tahun = 95 % x A
100
A = x 360.000
95
= 378.947,37 ton/tahun.
Sampai dengan bulan Juli 2002 produksi batubara di stockpile Suatotatakan
sebesar 185.558,84 ton, maka produksi batubara yang harus dihasilkan sampai
dengan akhir tahun 2002 adalah sebesar 193.388,53 ton, sehingga sasaran produksi
batubara tiap bulannya adalah sebesar :
= 193.388,53 ton : 5 bulan
= 38.677,706 ton/bulan.
71
LAMPIRAN L
KONDISI JALAN ANGKUT
Dari hasil pengamatan di lapangan serta dari spesifikasi alat ankut Hino Jumbo
Ranger diperoleh data :
Jumlah jalur (n) =2
Lebar truk jungkit = 2,385 m (lampiran B)
Maka :
L = 2. 2,385 + (2 + 1) (0,5. 2,385)
= 4,77 + 3,58
= 8,35 m
72
Dari hasil pengamatan di lapangan dan spesifikasi alat angkut diperoleh data-
data sebagai berikut :
Jarak yang ditentukan oleh roda depan dan bagian terluar truk = 1360 mm
Jarak yang ditentukan oleh roda belakang dengan bagian terluar truk = 1200 mm
Sehingga :
= 780,063 mm
= 1468,355 mm
c = z = 0,5 (U + Fa + Fb)
= 2134,209 mm
W = 2 (u + Fa + Fb + z) + c
= 2 (2020 + 780,063 + 1468,355 + 2134,209) + 2134,209
= 14939,463 mm
= 14,93 m
73
LAMPIRAN M
PRODUKSI ALAT SECARA TEORITIS
60
Pm x C x F x D x KM x We
ctm
Diketahui :
ctm = 25,48 detik = 0,424 menit (lampiran D)
C = 1,2 m3 (Lampiran A)
F = 85 % (Lampiran G)
74
KM = 60,61 % (Lampiran F)
We = 45,78 % (Tabel 4.8)
D = 0,884 Ton/m3
Produksi Backhoe PC 300 HR39 :
60
Ptm x 1, 2 x 0,85 x 0,884 x 60,61 % x 45,78 %
0,424
75
Untuk menghitung produksi truk menggunakan rumus :
60
Pa x n x C x F x D x KM x We
cta
Diketahui :
cta = 110, 53 menit (Lampiran D)
n = 11
C = 1,2 m3
F = 85 %
D = 0,884 Ton/m3
KM = 64,59 % (Lampiran F)
We = 46,17 % (Tabel 4.8)
Produksi Truk Hino FM melayani Backhoe PC 300 HR39 :
60
Pta x 11 x 1, 2 x 0,85 x 0,884 x 64,59 % x 46,17 %
110,53
76
LAMPIRAN N
KEMAMPUAN PRODUKSI SETELAH PERBAIKAN
JAM TUNGGU (STANDBY)
77
A.2 Produksi Backhoe PC 300 HR39 :
Diketahui :
ctm = 25,48 detik = 0,424 menit (lampiran D)
C = 1,2 m3 (Lampiran A)
F = 85 % (Lampiran G)
KM = 67,03 % (Tabel 5.4)
We = 60,52 % (Tabel 5.4)
D = 0,884 Ton/m3
60
Ptm x 1, 2 x 0,85 x 0,884 x 67,03 % x 60,52 %
0,424
keterangan :
Pa = produksi alat angkut; Ton/jam
Cta = waktu edar alat angkut (truck)
n = jumlah pengisian bak truck oleh bucket excavator
C = kapasitas bucket excavator
F = faktor mangkuk (Fill Factor) alat muat
D = Densitas loose material; Ton/m3
KM = persentase kesediaan mekanis alat angkut
We = persentase penggunaan alat angkut di lapangan
78
Diketahui :
cta = 110,11 menit (Lampiran D)
n = 10
C = 1,6 m3
F = 84 %
D = 0,884 Ton/m3
KM = 72,70 % (Tabel 5.4)
We = 67,40 % (Tabel 5.4)
60
Pta x 10 x 1,6 x 0,84 x 0,884 x 72,70 % x 67,40 %
110,11
79
LAMPIRAN O
DATA WAKTU HAMBATAN ALAT MEKANIS
80
Tabel O.2
Data Pengamatan Istirahat Terlalu Awal (Alat Muat)
81
Tabel O.3
Data Pengamatan Istirahat Terlalu Lama (Alat Muat)
82
Tabel O.4
Data Pengamatan Berhenti Sebelum Ganti Shift (Alat Muat)
83
Tabel O.5
Data Pengamatan Isi BBM dan Pelumasan (Alat Muat)
84
Tabel O.6
Data Pengamatan Keterlambatan Kerja (Alat Angkut)
85
Tabel O.7
Data Pengamatan Istirahat Terlalu Awal (Alat Angkut)
86
Tabel O.8
Data Pengamatan Istirahat Terlalu Lama (Alat Angkut)
87
Tabel O.9
Data Pengamatan Berhenti Sebelum Ganti Shift (Alat Angkut)
88
Tabel O.10
Data Pengamatan Isi BBM dan Pelumasan (Alat Angkut)
89
Tabel O.11
Data Pengamatan Operator Berhenti Kerja (Alat Angkut)
90
II. HAMBATAN YANG TIDAK DAPAT DIHINDARI
Tabel O.12
Data Hambatan Yang Tidak Dapat Dihindari Pada Komatsu PC 400
(menit)
No KOMATSU PC 400
Per. Kerja Pind.Lok. Kerja Kep. Opr. Hamb.Alat Safety talk Men. Truk
1 40,0 5,0 20,0 75,5 10,0 5,0
2 35,0 10,0 15,0 50,0 15,5 7,5
3 40,0 5,0 20,0 70,5 25,0 2,5
4 45,5 15,5 20,0 55,5 10,0 4,0
5 50,0 10,5 30,0 50,0 5,0 5,0
6 35,5 15,0 15,5 45,0 15,5 6,5
7 30,0 5,0 25,0 75,0 15,0 7,5
8 40,0 10,5 30,0 45,0 15,0 5,0
9 40,0 10,0 30,0 55,0 20,0 2,5
10 45,0 10,0 25,0 65,0 10,5 7,5
11 45,0 10,0 15,5 60,5 10,0 7,5
12 40,0 10,5 20,5 65,0 15,0 4,5
13 35,5 15,0 10,0 75,0 20,0 5,0
14 40,5 10,0 15,5 75,5 20,0 7,5
15 45,5 10,5 25,0 55,0 15,0 5,0
16 40,0 5,0 15,5 45,5 15,0 5,5
17 45,0 5,0 20,0 35,0 15,0 5,0
18 45,5 10,5 20,5 80,0 20,0 5,0
19 40,0 5,5 10,5 55,0 10,5 5,5
20 35,0 10,0 20,0 65,5 15,0 3,5
21 30,0 10,0 25,0 60,0 10,0 2,5
22 30,5 15,0 25,5 65,0 20,0 3,0
23 45,0 10,0 20,0 75,0 15,5 4,5
24 35,0 15,5 15,0 35,5 20,0 5,0
25 40,0 10,5 20,5 45,5 15,5 5,5
26 45,5 10,0 25,5 70,0 10,5 5,5
27 40,0 10,5 10,5 70,0 20,5 5,0
28 45,0 10,0 15,0 60,0 10,5 4,5
29 45,5 10,0 20,0 45,5 20,0 3,5
30 30,0 10,0 20,5 75,0 10,0 5,0
Rata-
rata 40,0 10,0 20,0 60,0 15,0 5,0
91
Tabel O.13
Data Hambatan Yang Tidak Dapat Dihindari Pada Komatsu PC 300
(menit)
KOMATSU PC 300
No Per. Kerja Pind. Lok. Kerja Kep. Opr. Hamb. Alat Safety talk Men. Truk
1 50,0 15,0 20,0 65,0 10,5 5,0
2 50,5 15,0 20,5 60,5 10,0 7,5
3 40,0 20,0 10,5 65,0 15,0 2,5
4 35,0 10,5 20,0 70,0 20,0 4,0
5 30,0 15,0 25,0 75,5 20,0 5,0
6 30,5 10,0 25,5 55,0 15,0 6,5
7 50,5 20,0 20,0 35,5 15,0 7,5
8 35,0 15,5 15,0 40,5 15,0 5,0
9 40,0 20,0 20,5 70,0 20,0 2,5
10 45,5 15,5 25,5 65,0 10,5 7,5
11 50,0 10,5 10,5 60,0 15,0 7,5
12 45,0 20,5 25,0 45,5 10,0 4,5
13 45,5 10,5 15,5 75,0 15,5 5,0
14 30,0 20,0 20,5 60,0 25,0 7,5
15 30,5 10,0 10,0 65,0 10,0 5,0
16 30,0 10,0 15,5 55,5 5,0 5,5
17 35,5 15,5 25,0 45,0 15,5 5,0
18 30,0 25,0 15,5 65,0 15,0 5,0
19 45,0 10,0 20,0 60,5 15,0 5,5
20 40,0 5,0 15,0 65,0 20,0 3,5
21 50,0 15,5 20,0 75,0 10,5 2,5
22 45,0 15,0 20,0 70,0 15,0 3,0
23 40,0 15,0 30,0 55,0 15,0 4,5
24 35,5 20,0 15,5 60,0 20,0 5,0
25 40,5 10,5 25,0 70,0 10,5 5,5
26 45,5 10,0 30,0 45,5 10,0 5,5
27 40,0 15,0 30,0 55,0 15,5 5,0
28 40,0 20,0 10,5 55,5 20,0 4,5
29 45,0 20,0 20,0 55,0 20,0 3,5
30 30,0 15,0 25,0 60,5 15,0 5,0
Rata-rata 40,0 15,0 20,0 60,0 15,0 5,0
92
Tabel O.14
Data Hambatan Yang Tidak Dapat Dihindari Pada Truk Komb. 1
(menit)
93
Tabel O.15
Data Hambatan Yang Tidak Dapat Dihindari Pada Truk Komb. 2
(menit)
94
III. PENGGUNAAN METODE STATISTIK
Berikut ini diberikan contoh perhitungan data hasil pengamatan terhadap
Keterlambatan Kerja pada alat muat Excavator PC 400 :
Diketahui :
k = 1 + 3,3 log M
= 1 + 3,3 log 30 = 5,87 6
i = d/k
= (80,00 35,00) / 6 = 7,5
Berdasarkan jumlah klas dan interval klas didapatkan tabel pengolahan hasil
pengamatan sebagai berikut :
Tabel O.16
Metode Statistik Data Keterlambatan Kerja Excavator PC 400
Karena Im < Imr = 7,74 < 10,84 maka data pengamatan yang dilakukan sebanyak 30
kali dianggap sudah dapat terwakili.
95