DESIGN OF R.C.C. CABLE TRENCH: W 1500 x D 1500

Surcharge = 1
1500
Unit wt. of water = 1

150

150 150 1.5 t/m2 0.750 0.50 t/m2


1650 (earth) t/m2 (Surcharge)
1500 (water)

Grade of concrete M25 25 N/mm2


Grade of steel Fe500 500 N/mm2

Submerged unit wt. of soil gd 1 t/m3


Coefficient of Earth Pressure = 0.5

Depth 150 mm
Effective cover 40 mm
Effective depth 105 mm
Width 1000 mm

DESIGN OF SIDE WALL:

Moment at bottom of wall = 1.398 t m/m


Mu/bd2 = 1.902 N/mm2
pt = 0.484
Ast (Required) = 5.1 cm2

5.23 cm ( pt = 0.498 ) AT BOTTOM.


2
PROVIDED 10 DIA. @ 150 mm C/C

Check for shear :


Shear at the face of support = 2.438 T
Nominal shear stress.tv = 0.35 N/mm2
tc = 0.85*(0.8fck((1+5b)-1)/6b = 0.482 N/mm2
where, b = 0.8 fck/ 6.89pt = 5.997
where, Total pt = 0.484
JOB NO.
ALIF ENGINEERS & TITLE RCC Design of CABLE TRENCH
SHEET NO.
PLANNERS, MUMBAI PROJECT
REVISION
PREPARED

DOCUMENT APPROVED
NO.
DATE
Shear Capacity= 7.24 T > 2.44 T OK
JOB NO.
ALIF ENGINEERS & TITLE RCC Design of CABLE TRENCH
SHEET NO.
PLANNERS, MUMBAI PROJECT
REVISION
PREPARED

DOCUMENT APPROVED
NO.
DATE

DESIGN OF BASE OF TRENCH

Self weight of trench = 1.69 t/m


Live load over trench = 1 t/m
Total 2.69 t/m
Upward pressure = 1.65 t/m2
Net pressure = 1.04 t/m2
Free B.M at span = 0.353 t m/m
Mu/bd2 = 0.480 N/mm2
pt = 0.120
Ast (Required) = 1.3 cm2

2.01 cm ( pt = 0.191 ) AT BOTTOM.


2
PROVIDED 8 DIA. @ 250 mm C/C

Distribution Steel:

Distribution reinforcement= 0.060 % of gross cross sectional area on each face


Ast required = 0.06*150*1000/100 90.00 mm2
Spacing required = 558 mm

Provide 8 mm dia 250 mm c/c as distribution reinforcement OK

10 @ 150 c/c

8 @ 250 c/c
8 @ 250 c/c
1500

8 @ 250 c/c

1500

8 @ 250 c/c
JOB NO.
ALIF ENGINEERS & TITLE RCC Design of CABLE TRENCH
SHEET NO.
PLANNERS, MUMBAI PROJECT
REVISION
PREPARED

DOCUMENT APPROVED
NO.
DATE
8 @ 250 c/c
0
IK
IK
7/24/2017

T/m2

T/m3

O.K.
0
IK
IK
7/24/2017
0
IK
IK
7/24/2017

O.K.
0
IK
IK
7/24/2017

You might also like